Address Search: 1001 N PARK AV
Search
Parcel Attributes
Parcel | 11504495A |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-1 |
Tucson Ward | Ward 6 |
Tucson Registered Neighborhood | West University |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 1001 N PARK AV
Date - 12/23/2024 2:51 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
1/4 Mile Each Direction (N, E, S, W) | 202 | None |
Rezoning Cases
Date - 12/23/2024 2:51 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-12-01 | C9-12-01 Main Gate Dist. (UOD) | UOD | Effectuated | 01/05/2012 |
Special Development Requests & Requirements
Address: 1001 N PARK AV
Date - 12/23/2024 2:51 a.m.
Total Number Of Special Development Permits - (4)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000013583 | CLOSED | 12/29/2021 | N/A | Historical Information | ||
T20SA00331 | COMPLETE | 11/10/2020 | N/A | Zoning Adminstration Letter | Zoning Compliance Letter | |
T20SA00343 | APPROVED | 12/01/2020 | N/A | Overlay Zone | ||
T22SA00270 | VOID | 06/06/2022 | N/A | Zoning Adminstration Letter | Zoning Compliance Letter |
Permits
Address: 1001 N PARK AV
Date - 12/23/2024 2:51 a.m.
Total Number Of Permits - (40)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-1222-00337 | Issued | 12/20/2022 | 06/17/2025 | Commercial Building | New Multi-Family Structure HUB V | |
TR-PIA-1223-00032 | Inspections | 12/11/2023 | 03/25/2025 | Private Improvement Agreement (PIA) | Offsite improvements for Hub V Tucson at Main Gate District. | |
TR-ROW-1223-01424 | Issued | 12/04/2023 | 03/16/2024 | Right-of-Way (ROW) | Placement of Construction Trailer in Alley between Park Av and Tyndall Av. Extension of TR-ROW-0623-00849 | |
TS-PRM-1124-00497 | Needs Resubmittal | 11/15/2024 | 05/14/2025 | Sign - Permanent | SCOPE OF THE WORK INCLUDES: SIGN A: ILLUMINATED REVERSE CHANNEL LETTER SET. MEASURING 98.340 SQ FT SIGN B: ILLUMINATED CHANNEL LETTER SET. MEASURING 77.436 SQ FT. SIGN C: CUSTOM EDGE LIT CHANNEL LETTER SET. MEASURING 20.125 SQ FT. | |
TF-FCP-1123-01304 | Void | 11/13/2023 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-00931 - ERRCES | |
TR-UTL-1123-02882 | Complete | 11/07/2023 | 02/14/2024 | Right-of-Way (ROW) - Utility | TEP WO T48525 - Pulling in new cable from riser on 1st Street to J1 cabinet, outage required for traffic light | |
TR-ROW-1124-01302 | Issued | 11/06/2024 | 01/22/2025 | Right-of-Way (ROW) | Barricade only associated with TR-PIA-1223-00032 | |
TS-PRM-1024-00473 | Void | 10/29/2024 | 04/27/2025 | Sign - Permanent | VOID- duplicate of TS-PRM-1124-00497 | |
TF-FCP-1023-01185 | Void | 10/09/2023 | N/A | Fire Construction Permit | VOID-SUBMIT UNDER PERMIT#TF-FCP-0823-00931-Emergency Responder Radio Communications System Installation at 1001 North Park Avenue, Tucson, AZ 85719 - Project Name: Hub V at Tucson | |
TF-FCP-0923-01162 | Issued | 09/29/2023 | 04/26/2025 | Fire Construction Permit | New Automatic Fire Sprinkler System w/ underground | |
TR-ROW-0924-01135 | In Review | 09/26/2024 | N/A | Right-of-Way (ROW) | Placement of mobile crane in ROW to fly materials to rooftop | |
TF-FCP-0823-00931 | Expired | 08/04/2023 | 09/25/2024 | Fire Construction Permit | New Construction installation of a code compliant Fire Alarm & ERRCES in a 12-story high rise. | |
TR-ROW-0823-01028 | Issued | 08/02/2023 | 01/07/2024 | Right-of-Way (ROW) | **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be testing and cameraing the (3) new manholes that were installed this summer with Pima County. Duration of the work will be the following days: 9/25/23 from 5AM to 3PM 9/29/23 from 5AM to 3PM 10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day 12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise 12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise. 01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on the following day. | |
TR-UTL-0724-01424 | Complete | 07/31/2024 | 11/19/2024 | Right-of-Way (ROW) - Utility | Barricade Only: PRJ276352-1:Cox to PUll 220 through existing CATV conduit for system tie. | |
T22CM05823 | Issued | 07/30/2022 | 08/26/2024 | Commercial Building | Foundation Only for Future Apartment building | |
DP20-0152 | Issued | 07/28/2020 | 10/23/2026 | Development Package | Site/Main Gate District - Hub Five Tucson. | |
TR-ROW-0724-00849 | Complete | 07/25/2024 | 10/03/2024 | Right-of-Way (ROW) | 24 hour closure to remove tower crane from site September 3-6 | |
TC-COM-0723-01786 | Void | 07/20/2023 | 01/16/2024 | Commercial Building | VOID - Duplicate Application. There is already a permit in process for this address which included this scope of work TC-COM-1222-00337. Electrical Work for a new commercial building | |
TC-COM-0723-01768 | Void | 07/19/2023 | 01/15/2024 | Commercial Building | VOID: Wrong permit type. Submit new application under commercial new build and a complete set of plans prepared and stamped by a registered Arizona architect or engineer. Electrical work for new construction build | |
TF-FCP-0623-00820 | Void | 06/29/2023 | N/A | Fire Construction Permit | VOID-SUBMITTED NEW PERMIT#TF-FCP-0823-00931 BY POWER DESIGN INC-ERRC | |
TR-ROW-0623-00849 | Issued | 06/08/2023 | 12/16/2023 | Right-of-Way (ROW) | Placement of Construction Trailer in Alley between Park Av and Tyndall Av. | |
TR-ROW-0423-00677 | Complete | 04/25/2023 | 07/28/2023 | Right-of-Way (ROW) | Closure for Sewer Work | |
TC-COM-0424-00707 | Issued | 04/19/2024 | 12/17/2024 | Commercial Building | Provide a Remote Fill Connection for the Emergency Back-Up Generator provided under separate contract. | |
TR-ROW-0423-00652 | Complete | 04/19/2023 | 08/26/2023 | Right-of-Way (ROW) | Closure of S Park Ave to erect on-site crane. 24/7 closure but work will only occur during allowable construction hours. TNE Approval for 8/19 7pm-6am, 8/20 7pm-6am, 8/21 7pm-6am if needed | |
TR-ROW-0324-00305 | Issued | 03/18/2024 | 03/17/2025 | Right-of-Way (ROW) | continuation of TR-ROW-0223-00344 Right of way closures associated with DP20-0152. Full closure of alley, access to garages and trash will be from Speedway to the north. Sidewalk closure along 1st St from the alley East to Park Av. Sidewalk closure on Park from Speedway to 1st. 2 lanes will be maintained on Park and 1st. | |
TC-COM-0224-00363 | Issued | 02/27/2024 | 04/29/2025 | Commercial Building | Construction of new elevated pool & spa. | |
TR-ROW-0223-00344 | Complete | 02/07/2023 | 03/16/2024 | Right-of-Way (ROW) | Right of way closures associated with DP20-0152. Full closure of alley, access to garages and trash will be from Speedway to the north. Sidewalk closure along 1st St from the alley East to Park Av. Sidewalk closure on Park from Speedway to 1st. 2 lanes will be maintained on Park and 1st. | |
DP13-0015 | Complete | 01/28/2013 | 07/13/2020 | Development Package | SITE | |
TR-ROW-0124-00061 | Issued | 01/11/2024 | 07/05/2024 | Right-of-Way (ROW) | Updated - 5/01/2024 - Overhead crane work and large loads access points on Right-of- Way. To place large concrete slabs on the roof of High rise building. Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from June 3rd at 5:00AM to June 14th at 5:00pm to allow for safe operating space. 6/3/2024 (5:00am ) - 6/14/2024 (5:00pm) J H Findorff & Son Inc. will be the Contractor responsible for the work, ROC # 328650. Updated - 4/09/2024 -- Revision for Night Work- " Revising permit for Overnight pours in Late April & Early May per provided and approved TNE. No Changes to Existing TCP.. TNE Dates - April 19th with backup dates of April 18th & 22nd, April 25th with backup dates of April 24th & April 26th ; May 6th with backup dates of May 3rd & May 7th, starting at 1 am and continuing until Sunrise on the following day. 3/19/2024 - Revising permit for overnight pours in late March and Early April per provided and approved TNE. No changes to existing TCP. -- New Night work dates - March 25th with backup dates of March 22nd & 26th, April 1st with backup dates of March 29th & April 2nd, April 8th with backup dates of April 5th & 8th, April 25th with back up dates of April 12th & 16th, starting at 1 am and continuing until Sunrise.. Original - Full road closure- Continuation of TR-ROW-0823-01028 which expired 01-07-2024 (with renewal) Overnight concrete pours 01-16-2024: TNE for January 23rd with January 22nd and 24th as backup dates AND January 30th with January 29th and 31st as backup dates if needed, starting at 1am and continuing until Sunrise on the following day. notes from previous permit TR-ROW-0823-01028: **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be testing the (3) new manholes that were installed this summer with Pima County. Duration of the work will be the following days: 9/25/23 from 5AM to 3PM 9/29/23 from 5AM to 3PM 10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day 12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise 12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise. 01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on the following day. | |
T04CM05240 | EXPIRED | 12/02/2004 | 06/06/2005 | COMBO | DEMO:INTERIOR AND ROOF | |
T04CM05620 | C OF O | 12/30/2004 | 12/26/2005 | COMBO | TI:BANK | |
T05MS00004 | ISSUED | 01/06/2005 | N/A | MISC | COPY FEES | |
T05OT00345 | FINAL | 02/15/2005 | 10/11/2005 | SIGN | SIGN:8516 ARIZONA STATE SAVINGS & CREDIT UNION | |
T05OT01476 | FINAL | 06/14/2005 | 03/14/2006 | SIGN | SIGN: 9178 ARIZONA STATE SAVINGS & CREDIT UNION | |
T05OT01477 | FINAL | 06/14/2005 | 01/25/2006 | SIGN | SIGN: 9177 ARIZONA STATE SAVINGS & CREDIT UNION | |
T05OT01781 | FINAL | 07/20/2005 | 01/18/2006 | SIGN | SIGN: 9376 ARIZONA STATE SAVINGS & CREDIT UNION | |
T16OT00276 | FINAL | 02/29/2016 | 10/23/2016 | SIGN | 2 -NON ILLUM WALL SIGNS & 1- CofC on DP | |
T21RW04681 | FINAL | 10/14/2021 | 11/20/2021 | ROW | Remove and replace curb at the NW corner of Park Ave & 1st St, 20 LF of curb and 20 SF of sidewalk | |
T22RW01127 | FINAL | 03/24/2022 | 04/29/2022 | ROW | Utility potholing @14 for design of shoring for new underground parking garage in the ROW of 1st St west of Park Ave. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
T22RW02042 | FINAL | 06/06/2022 | 08/09/2022 | ROW | Gas service permanent abandonment for (1001 N PARK AVE ) Excavate approximately a 5'x5' bell hole , gas main located in asphalt alley to the west of property . Excavation is located approximately 89.4FT North from E 1ST ST center line . *Crews may be working Saturdays from 6:00 am to 3:00 pm. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. |
Code Enforcement
Address: 1001 N PARK AV
Date - 12/23/2024 2:51 a.m.
Total Number Of Code Cases - (1)
Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO1123-06556 | Closed - Unfounded | 11/20/2023 | 11/21/2023 | CWOP: Construction Noise after 8p,, possible CWOP (CMO). |
Plans
Address: 1001 N PARK AV
Date - 12/23/2024 2:51 a.m.
Total Number Of Plans - (2)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
SD-0523-00048 | Complete | 05/04/2023 | N/A | -- Urban Overlay District (UOD) | Main Gate Overlay Design Package for Hub V Project- Minor Change Request | |
T20PRE0057 | CLOSED | 04/24/2020 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | Site/Main Gate District: Hub V at Park & First. |
Record Requests
Address: 1001 N PARK AV
Date - 12/23/2024 2:51 a.m.
Total Number Of Requests - (11)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0124-00135 | Denied | 01/05/2024 | N/A | Requests | DENIED - Renewal request denied, Original permit request TR-ROW-0823-01028 has been extended Maximum number of times. NEW ROW PERMIT application needed, apply for new ROW permit including all original documents and referance TR-ROW-0823-01028 in the Work details description.. ------TR-ROW-0823-01028 - Please extend through June 30, 2024 **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be testing and cameraing the (3) new manholes that were installed this summer with Pima County. Duration of the work will be the following days: 9/25/23 from 5AM to 3PM 9/29/23 from 5AM to 3PM 10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day 12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise 12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise. 01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on the following day. |
REQ-0324-01934 | Complete | 03/07/2024 | 03/08/2024 | Requests | Please extend through 5/31/2024 (60 days) Full road closure- Continuation of TR-ROW-0823-01028 which expired 01-07-2024 (with renewal) Overnight concrete pours 01-16-2024: TNE for January 23rd with January 22nd and 24th as backup dates AND January 30th with January 29th and 31st as backup dates if needed, starting at 1am and continuing until Sunrise on the following day. notes from previous permit TR-ROW-0823-01028: **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be testing and cameraing the (3) new manholes that were installed this summer with Pima County. Duration of the work will be the following days: 9/25/23 from 5AM to 3PM 9/29/23 from 5AM to 3PM 10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day 12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise 12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise. 01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on the following day. |
REQ-0324-01986 | Denied | 03/11/2024 | N/A | Requests | ** Denied- no renewals on annual permits. Please apply for new permit referencing "continuation of TR-ROW-0223-00344" ** Please extend for an additional year Right of way closures associated with DP20-0152. Full closure of alley, access to garages and trash will be from Speedway to the north. Sidewalk closure along 1st St from the alley East to Park Av. Sidewalk closure on Park from Speedway to 1st. 2 lanes will be maintained on Park and 1st. |
REQ-0324-02341 | Approved | 03/25/2024 | 03/27/2024 | Requests | New Construction installation of a code compliant Fire Alarm & ERRCES in a 12-story high rise. |
REQ-0424-02511 | Approved | 04/01/2024 | 04/10/2024 | Requests | New Construction installation of a code compliant Fire Alarm & ERRCES in a 12-story high rise. Structure will not be ready until 9-25-24 |
REQ-0823-04526 | Complete | 08/21/2023 | 08/22/2023 | Requests | Please extend through 12/31/2023 Placement of Construction Trailer in Alley between Park Av and Tyndall Av. |
REQ-0824-05718 | Denied | 08/23/2024 | N/A | Requests | This Project is not complete all conditions need to be satisfied. Once documents are submitted and all Reviews/Revision are approved and conditions are satisfied re-request for CofO/LOC. Per JG okay to issue LofC, full building under separate permit Foundation Only for Future Apartment building |
REQ-0923-05019 | Complete | 09/14/2023 | 09/15/2023 | Requests | **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be testing and cameraing the (3) new manholes that were installed this summer with Pima County. Duration of the work will be the following days: 9/25/23 from 5AM to 3PM 9/29/23 from 5AM to 3PM 10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day |
REQ-1023-05454 | Complete | 10/06/2023 | 10/06/2023 | Requests | **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be testing and cameraing the (3) new manholes that were installed this summer with Pima County. Duration of the work will be the following days: 9/25/23 from 5AM to 3PM 9/29/23 from 5AM to 3PM 10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day |
REQ-1123-06302 | Denied | 11/16/2023 | N/A | Requests | **DENIED -1. HAS ALREADY HAD ONE RENEWAL- WILL NEED TO RESUBMIT FOR NEW PERMIT. 2.NO PRE-ACTIVITY MEETING SCHEDULED VIA THE DASHBOARD** please extend to February 1, 2024 (30 Days from current expiration) Placement of Construction Trailer in Alley between Park Av and Tyndall Av. |
REQ-1224-08318 | Submitted - Online | 12/06/2024 | N/A | Requests | Provide a Remote Fill Connection for the Emergency Back-Up Generator provided under separate contract. As of 12/3/24 the estimated time frame from the contractor is July 2025. Thanks! |