Permit: TC-COM-1125-02102
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
10023 E OLD VAIL RD
Address NEW:
10023 E OLD VAIL RD
Apply Date:
11/13/2025
Applicant:
Andrea Leonard
Description:
REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Permit Reviews
Permit Number - TC-COM-1125-02102
Permit Status: Inspections complete
Permit Description: REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan
New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/03/2026 | SPECIAL INSPECTION REVIEW v.1 | 09/09/2026 | APPROVED |
| 03/18/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/26/2026 | APPROVED |
| 11/14/2025 | COMMERCIAL REVIEW - FULL v.1 | 12/08/2025 | REQUIRES RESUBMIT |
| 08/03/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 08/25/2026 | APPROVED |
| 01/20/2026 | COMMERCIAL REVIEW - FULL v.3 | 02/04/2026 | APPROVED |
| 02/04/2026 | RESTAMP - COMMERCIAL v.1 | 02/09/2026 | APPROVED |
| 12/19/2025 | COMMERCIAL REVIEW - FULL v.2 | 01/06/2026 | REQUIRES RESUBMIT |
| 04/03/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 04/28/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1125-02102
Permit Status: Inspections complete
Permit Description: REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan
New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
| Date | Description | Comments |
|---|---|---|
| 11/14/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/14/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/14/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1125-02102
Permite Description: REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan
New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2026 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 6-5-26: sheathing screw inspection at pop outs of building along the south and east sides. Okay to continue with construction at progress areas. Crickets were also inspected and approved . |
| 08/24/2026 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 8/24/2026 Partial pass. 4” clean out added to Suite 163. Okay to backfill. Shading required. |
| 06/26/2026 | COT - HCPL - Rough Soil | N/A | Partial Pass | 6-26-26: verified dry pack on 3 interior steel columns-okay for concrete placement. |
| 06/05/2026 | COT - HCBU - Framing | N/A | Partial Pass | 6-5-26: sheathing screw inspection at pop outs of building along the south and east sides. Okay to continue with construction at progress areas. Crickets were also inspected and approved . |
| 02/27/2026 | COT - HCBU - Preslab | N/A | Canceled | |
| 05/28/2026 | COT - HCBU - Roof Nailing | N/A | Partial Pass | 5-28-26: nailing at roof decking only approved. Please schedule another nailing inspection to verify crickets & parapet walls. |
| 09/17/2026 | COT - HCPL - Plumbing Roof Drains | N/A | Not Applicable | 9/17/26: not applicable. |
| 03/02/2026 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 3/2/26: UFER approved |
| 09/17/2026 | COT - HCBU - Masonry Pregrout | N/A | Not Applicable | 9/17/26: not applicable. |
| 08/20/2026 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 8/20/26: East wall at suite xxx 8" o.c meets UL305 1 hour rating requirements. Inspection shall be called in when fire tape and fire caulk have been applied |
| 08/25/2026 | BULD - Electrical Clearance | N/A | Re-inspection required | 8-25-26: not ready. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1125-02102
Permit Description: REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan
New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Total Completed Inspections - 29
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2026 | COT - HCBU - Exterior Clips/Sheathing | Passed | 7.10.26 Holdowns installed along with anchor bolts. |
|
| 09/15/2026 | COT - HCME - Mechanical Final | Passed | 9/15/26: mechanical final approved. | |
| 09/16/2026 | COT - BULD - SWG Clearance | Passed | 9/16/26: okay to install gas meter. SWG Clearance issued. Note: no interior gas lines. Any construction related with gas will be completed under Tenant Improvement Permit. |
|
| 09/16/2026 | COT - HCEL - Outdoor Lighting | Passed | 9/16/26: verified site and building perimeter lighting. | |
| 09/16/2026 | COT - HCPL - Plumbing Progress | Passed | 9/16/26: approved. | |
| 09/16/2026 | COT - HCPL - Plumbing Intermediate | Passed | 9/16/26: plumbing intermediate approved. | |
| 09/16/2026 | COT - HCPL - Rough Soil | Passed | 9/16/26: previously inspected & approved. | |
| 09/16/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | 9/16/26: plumbing above ceiling approved. | |
| 09/16/2026 | COT - HCBU - Framing | Passed | 9/16/26: framing approved. | |
| 09/16/2026 | COT - HCBU - Preslab | Passed | 9/16/26: previously inspected & approved. | |
| 09/16/2026 | COT - HCBU - Roof Nailing | Passed | 9/16/26: roof nailing approved. | |
| 09/16/2026 | COT - HCEL - Electrical Final | Passed | 9/16/26: electrical final approved. | |
| 09/16/2026 | COT - FCON - Fire - Final | Passed | ||
| 09/16/2026 | COT - FCON - Alarm - Final | Passed | ||
| 09/17/2026 | COT - HCME - Mechanical Progress | Passed | 9/17/26: approved. | |
| 09/17/2026 | COT - HCME - Mechanical Intermediate | Passed | 9/17/26: approved. | |
| 09/17/2026 | COT - HCME - Mechanical Above Ceiling | Passed | 9/17/26: approved. | |
| 09/17/2026 | COT - HCEL - Electrical Underground | Passed | 9/17/26: approved. | |
| 09/17/2026 | COT - HCEL - Electrical Progress | Passed | 9/17/26: approved. | |
| 09/17/2026 | COT - HCEL - Electrical Intermediate | Passed | 9/17/26: approved. | |
| 09/17/2026 | COT - HCEL - Electrical Above Ceiling | Passed | 9/17/26: electrical above ceiling approved. | |
| 09/17/2026 | COT - HCBU - Interior Shear Bracing | Passed | 9/17/26: approved. | |
| 09/17/2026 | COT - HCBU - Building Above Ceiling | Passed | 9/17/26: approved. | |
| 09/17/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 09/17/2026 | TRSP - ROW - Notice of Completion | Passed | shell building completed with no impact to right of way, traffic control devices removed, approved | |
| 09/17/2026 | BULD - Electrical Clearance | Passed | 9/17/26: previously inspected & approved. | |
| 09/23/2026 | COT - HCPL - Plumbing Final | Passed | ||
| 09/23/2026 | COT - HCBU - Building Final | Passed | ||
| 09/22/2026 | ENGR Engineering Final | Passed | Site substantially complete for shell. Long term parking and completed lanscaping etc. will be checked with DP final. |