Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address NEW:
10023 E OLD VAIL RD
Apply Date:
11/13/2025
Applicant:
Andrea Leonard
Description:
REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181

Permit Reviews

Permit Number - TC-COM-1125-02102
Permit Status: Inspections complete
Permit Description: REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Start Date Submittal Complete Date Status  
09/03/2026 SPECIAL INSPECTION REVIEW v.1 09/09/2026 APPROVED Review Details
03/18/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/26/2026 APPROVED Review Details
11/14/2025 COMMERCIAL REVIEW - FULL v.1 12/08/2025 REQUIRES RESUBMIT Review Details
08/03/2026 COMMERCIAL REVIEW - FULL REVISION v.1 08/25/2026 APPROVED Review Details
01/20/2026 COMMERCIAL REVIEW - FULL v.3 02/04/2026 APPROVED Review Details
02/04/2026 RESTAMP - COMMERCIAL v.1 02/09/2026 APPROVED Review Details
12/19/2025 COMMERCIAL REVIEW - FULL v.2 01/06/2026 REQUIRES RESUBMIT Review Details
04/03/2026 COMMERCIAL REVIEW - FULL REVISION v.1 04/28/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-1125-02102
Permit Status: Inspections complete
Permit Description: REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Date Description Comments
11/14/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/14/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/14/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-1125-02102
Permite Description: REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
06/05/2026 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass 6-5-26: sheathing screw inspection at pop outs of building along the south and east sides. Okay to continue with construction at progress areas. Crickets were also inspected and approved .
08/24/2026 COT - HCPL - Plumbing Progress N/A Partial Pass 8/24/2026 Partial pass. 4” clean out added to Suite 163. Okay to backfill. Shading required.
06/26/2026 COT - HCPL - Rough Soil N/A Partial Pass 6-26-26: verified dry pack on 3 interior steel columns-okay for concrete placement.
06/05/2026 COT - HCBU - Framing N/A Partial Pass 6-5-26: sheathing screw inspection at pop outs of building along the south and east sides. Okay to continue with construction at progress areas. Crickets were also inspected and approved .
02/27/2026 COT - HCBU - Preslab N/A Canceled
05/28/2026 COT - HCBU - Roof Nailing N/A Partial Pass 5-28-26: nailing at roof decking only approved. Please schedule another nailing inspection to verify crickets & parapet walls.
09/17/2026 COT - HCPL - Plumbing Roof Drains N/A Not Applicable 9/17/26: not applicable.
03/02/2026 COT - HCEL - Electrical Progress N/A Partial Pass 3/2/26: UFER approved
09/17/2026 COT - HCBU - Masonry Pregrout N/A Not Applicable 9/17/26: not applicable.
08/20/2026 COT - HCBU - Interior Shear Bracing N/A Partial Pass 8/20/26: East wall at suite xxx 8" o.c meets UL305 1 hour rating requirements. Inspection shall be called in when fire tape and fire caulk have been applied
08/25/2026 BULD - Electrical Clearance N/A Re-inspection required 8-25-26: not ready.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-1125-02102
Permit Description: REV 1 - updates to floorplan, plumbing, electric, foundation, ceiling, overall site plan New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Total Completed Inspections - 29
Date Description Inspector Results Comments
07/10/2026 COT - HCBU - Exterior Clips/Sheathing Passed 7.10.26
Holdowns installed along with anchor bolts.
09/15/2026 COT - HCME - Mechanical Final Passed 9/15/26: mechanical final approved.
09/16/2026 COT - BULD - SWG Clearance Passed 9/16/26: okay to install gas meter. SWG Clearance issued.
Note: no interior gas lines. Any construction related with gas will be completed under Tenant Improvement Permit.
09/16/2026 COT - HCEL - Outdoor Lighting Passed 9/16/26: verified site and building perimeter lighting.
09/16/2026 COT - HCPL - Plumbing Progress Passed 9/16/26: approved.
09/16/2026 COT - HCPL - Plumbing Intermediate Passed 9/16/26: plumbing intermediate approved.
09/16/2026 COT - HCPL - Rough Soil Passed 9/16/26: previously inspected & approved.
09/16/2026 COT - HCPL - Plumbing Above Ceiling Passed 9/16/26: plumbing above ceiling approved.
09/16/2026 COT - HCBU - Framing Passed 9/16/26: framing approved.
09/16/2026 COT - HCBU - Preslab Passed 9/16/26: previously inspected & approved.
09/16/2026 COT - HCBU - Roof Nailing Passed 9/16/26: roof nailing approved.
09/16/2026 COT - HCEL - Electrical Final Passed 9/16/26: electrical final approved.
09/16/2026 COT - FCON - Fire - Final Passed
09/16/2026 COT - FCON - Alarm - Final Passed
09/17/2026 COT - HCME - Mechanical Progress Passed 9/17/26: approved.
09/17/2026 COT - HCME - Mechanical Intermediate Passed 9/17/26: approved.
09/17/2026 COT - HCME - Mechanical Above Ceiling Passed 9/17/26: approved.
09/17/2026 COT - HCEL - Electrical Underground Passed 9/17/26: approved.
09/17/2026 COT - HCEL - Electrical Progress Passed 9/17/26: approved.
09/17/2026 COT - HCEL - Electrical Intermediate Passed 9/17/26: approved.
09/17/2026 COT - HCEL - Electrical Above Ceiling Passed 9/17/26: electrical above ceiling approved.
09/17/2026 COT - HCBU - Interior Shear Bracing Passed 9/17/26: approved.
09/17/2026 COT - HCBU - Building Above Ceiling Passed 9/17/26: approved.
09/17/2026 COT - FCON - Sprinkler - Final Passed
09/17/2026 TRSP - ROW - Notice of Completion Passed shell building completed with no impact to right of way, traffic control devices removed, approved
09/17/2026 BULD - Electrical Clearance Passed 9/17/26: previously inspected & approved.
09/23/2026 COT - HCPL - Plumbing Final Passed
09/23/2026 COT - HCBU - Building Final Passed
09/22/2026 ENGR Engineering Final Passed Site substantially complete for shell. Long term parking and completed lanscaping etc. will be checked with DP final.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-5_PLAN SET-10023-OLD VAIL-RD_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-4_PLAN SET_V1.PDF DOCUMENTS VIEW
BUILDING 2 TRUSS DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V3.PDF DOCUMENTS VIEW
OVID - BLDGS 2 SI CERTS 2026-01-19-2026-01-19_V1.PDF DOCUMENTS VIEW
2_MECHANICAL COMCHECK_V1.PDF DOCUMENTS VIEW
2_STRUCTURAL ADDENDUM CALCULATIONS_V1.PDF DOCUMENTS VIEW