Permit: TC-COM-1125-02102
Permit Details
Status:
In Revision
Type:
Commercial Building
Address:
10023 E OLD VAIL RD
Address NEW:
10023 E OLD VAIL RD
Apply Date:
11/13/2025
Applicant:
Andrea Leonard
Description:
New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Permit Reviews
Permit Number - TC-COM-1125-02102
Permit Status: In revision
Permit Description: New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/26/2026 | APPROVED |
| 11/14/2025 | COMMERCIAL REVIEW - FULL v.1 | 12/08/2025 | REQUIRES RESUBMIT |
| 08/03/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | N/A | IN REVIEW |
| 01/20/2026 | COMMERCIAL REVIEW - FULL v.3 | 02/04/2026 | APPROVED |
| 02/04/2026 | RESTAMP - COMMERCIAL v.1 | 02/09/2026 | APPROVED |
| 12/19/2025 | COMMERCIAL REVIEW - FULL v.2 | 01/06/2026 | REQUIRES RESUBMIT |
| 04/03/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 04/28/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1125-02102
Permit Status: In revision
Permit Description: New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
| Date | Description | Comments |
|---|---|---|
| 11/14/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/14/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/14/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: TC-COM-1125-02102
Permite Description: New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2026 | COT - HCBU - Preslab | N/A | Canceled | |
| 03/16/2026 | COT - HCEL - Electrical Underground | N/A | Partial Pass | X4 2” schedule 40 at 24” depth all for communication purposes. Building 2. Okay to backfill. Shading required. 3/16/2026 |
| 05/28/2026 | COT - HCBU - Roof Nailing | N/A | Partial Pass | 5-28-26: nailing at roof decking only approved. Please schedule another nailing inspection to verify crickets & parapet walls. |
| 06/26/2026 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 6-26-26: gas pressure test previously inspected. |
| 06/26/2026 | COT - HCPL - Rough Soil | N/A | Partial Pass | 6-26-26: verified dry pack on 3 interior steel columns-okay for concrete placement. |
| 03/02/2026 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 3/2/26: UFER approved |
| 06/05/2026 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 6-5-26: sheathing screw inspection at pop outs of building along the south and east sides. Okay to continue with construction at progress areas. Crickets were also inspected and approved . |
| 06/05/2026 | COT - HCBU - Framing | N/A | Partial Pass | 6-5-26: sheathing screw inspection at pop outs of building along the south and east sides. Okay to continue with construction at progress areas. Crickets were also inspected and approved . |
| COT - HCBU - Interior Shear Bracing | N/A | Scheduled | ||
| BULD - Electrical Clearance | N/A | Requested |
Completed Inspections
Permit Status: In Revision
Permit Number: TC-COM-1125-02102
Permit Description: New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2026 | COT - HCBU - Exterior Clips/Sheathing | Passed | 7.10.26 Holdowns installed along with anchor bolts. |
Scheduled Inspections
Scheduled Inspections - TC-COM-1125-02102
Status: In Revision
Description: New ground-up shell building. all site conditions per development plan TD-DEV-0725-00181
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 08/20/2026 | COT - HCBU - Interior Shear Bracing | Scheduled |