Inspection Status: Canceled
Inspection History: COT - HCBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 02/27/2026 |
COT - HCBU - Preslab |
|
Canceled |
|
| 04/10/2026 |
COT - HCBU - Preslab |
|
Partial Pass |
4-10-26: reinforcement for 4 interior isolated footers verified per detail F2, 1-footer per detail F3, 6-exterior column footers verified per F3/Detail 110, and a 6" continuous stem footing with #4 dowels at 24" o.c... okay for concrete at mentioned above areas. The south stem footing between G/L 1-3 will be inspected at a later date. |
| 04/13/2026 |
COT - HCBU - Preslab |
|
Partial Pass |
4-13-26: reinforcement for stem wall at G/L E/2-1 & 1/C-E approved for concrete placement. (Detail's 102/103). |
| 04/22/2026 |
COT - HCBU - Preslab |
|
Partial Pass |
4-22-26: reinforcement for stem wall at GL/ 1-3/A-B approved verified per detail 102. Okay for concrete placement t progress areas. |
| 04/23/2026 |
COT - HCBU - Preslab |
|
Partial Pass |
4-23-26: okay for concrete placement at GL: A-C/1-3 (north to south) & C-E/1-2. |
| 05/06/2026 |
COT - HCBU - Preslab |
|
Partial Pass |
5-6-26: dry pack/reinforcement on 6 exterior columns verified per detail 110. Okay for concrete placement. |