Permit Number: TC-COM-1125-02102
Parcel: 141186020

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1125-02102
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/26/2025 Outdoor Lighting Standard APPROVED
12/04/2025 Site Engineering Standard APPROVED
12/08/2025 Site Zoning Standard APPROVED
12/08/2025 Water - PDSD Standard APPROVED
12/08/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/01/2025 Commercial Building Standard REQUIRES RESUBMIT Structural (S) Reviewer
Madeline Nelson; mnelson@safebuilt.com
Discipline Status:Denied
Date Completed: 11/25/2025
1.Sheet S1.1 / Special Inspections:The Statement of Special Inspections on Sheet S1.1 appears incomplete. Please
amend this sheet to include the minimum special inspections for Soil and Concrete Construction as dictated by the
2018 International Building Code, Tables 1705.3 and 1705.6.
2.Sheet S2.1.2 / Column (C) Schedule / Base Plates:Column Type "C2" is called out at the free standing columns
supporting canopy framing at the building's southeast corner. Per the Column Schedule, base plates supporting
Column Type "C2" are not doubly symmetric (10"x5.5" plates), and therefore, their orientation relative to the building
must be specified. Please confirm the base plate design at these locations and confirm that two anchor bolts are
sufficient to resist lateral loads in two directions as needed.
3.Sheet S2.2.2 / Ledger (L) Schedule / Ledger Type "L2":Ledger Type "L2" is called out at the canopy framing and
appears in Detail 310. Please amend the Ledger Schedule on Sheet S2.2.2 to include a ledger size and fastener size
and spacing for Ledger "L2".
4.Sheet S4.0 / Detail 303 / Parapet Design:Detail 303 shows a free-standing parapet that cantilevers up from the roof
deck. Please confirm the parapet vertical stud framing (stud size and spacing), and amend the detail to show a
maximum parapet height.




Building (B) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 11/17/2025
12/01/2025 Commercial Electrical Standard REQUIRES RESUBMIT Electrical (E) Reviewer
Ron Ross; rross@safebuilt.com
Discipline Status:Denied
Date Completed: 11/18/2025
E2.1 ELECTRICAL PLAN:Need to provide emergency combo exit signs for all exits per IBC 1013.
12/01/2025 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical (M) Reviewer
Jorge Valido; jvalido@safebuilt.com
Discipline Status:Denied
Date Completed: 11/21/2025
General -MECHANICAL PLAN REVIEW: Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED
certifying agency is acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements.
Comment:Shell Building Review only. Individual Tenant buildouts will require additional permitting and plan review.
12/01/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Plumbing (P) Reviewer
Perry Hendershott; phendershott@safebuilt.com
Discipline Status:Denied
Date Completed: 11/30/2025
FIRST PLUMBING REVIEW:
1).PLAN PAGE P1.0:Right side page hose bib missing shut off valve. Add shut off valve to hose bib on right side of plan
page.-2018 IPC 606.2
2). PLAN PAGE P2.0: Missing piping material specifications. Add piping material specifications.-2018 IPC 605.4, 702, 2018
IFGC 303
12/08/2025 Fire New Construction Standard REVIEW COMPLETED
11/14/2025 PDSD Application Completeness Express REVIEW COMPLETED