Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1125-02102
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/26/2025 | Outdoor Lighting Standard | APPROVED | |||
| 12/04/2025 | Site Engineering Standard | APPROVED | |||
| 12/08/2025 | Site Zoning Standard | APPROVED | |||
| 12/08/2025 | Water - PDSD Standard | APPROVED | |||
| 12/08/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/01/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Structural (S) Reviewer Madeline Nelson; mnelson@safebuilt.com Discipline Status:Denied Date Completed: 11/25/2025 1.Sheet S1.1 / Special Inspections:The Statement of Special Inspections on Sheet S1.1 appears incomplete. Please amend this sheet to include the minimum special inspections for Soil and Concrete Construction as dictated by the 2018 International Building Code, Tables 1705.3 and 1705.6. 2.Sheet S2.1.2 / Column (C) Schedule / Base Plates:Column Type "C2" is called out at the free standing columns supporting canopy framing at the building's southeast corner. Per the Column Schedule, base plates supporting Column Type "C2" are not doubly symmetric (10"x5.5" plates), and therefore, their orientation relative to the building must be specified. Please confirm the base plate design at these locations and confirm that two anchor bolts are sufficient to resist lateral loads in two directions as needed. 3.Sheet S2.2.2 / Ledger (L) Schedule / Ledger Type "L2":Ledger Type "L2" is called out at the canopy framing and appears in Detail 310. Please amend the Ledger Schedule on Sheet S2.2.2 to include a ledger size and fastener size and spacing for Ledger "L2". 4.Sheet S4.0 / Detail 303 / Parapet Design:Detail 303 shows a free-standing parapet that cantilevers up from the roof deck. Please confirm the parapet vertical stud framing (stud size and spacing), and amend the detail to show a maximum parapet height. Building (B) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 11/17/2025 |
||
| 12/01/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Electrical (E) Reviewer Ron Ross; rross@safebuilt.com Discipline Status:Denied Date Completed: 11/18/2025 E2.1 ELECTRICAL PLAN:Need to provide emergency combo exit signs for all exits per IBC 1013. |
||
| 12/01/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Mechanical (M) Reviewer Jorge Valido; jvalido@safebuilt.com Discipline Status:Denied Date Completed: 11/21/2025 General -MECHANICAL PLAN REVIEW: Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements. Comment:Shell Building Review only. Individual Tenant buildouts will require additional permitting and plan review. |
||
| 12/01/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Plumbing (P) Reviewer Perry Hendershott; phendershott@safebuilt.com Discipline Status:Denied Date Completed: 11/30/2025 FIRST PLUMBING REVIEW: 1).PLAN PAGE P1.0:Right side page hose bib missing shut off valve. Add shut off valve to hose bib on right side of plan page.-2018 IPC 606.2 2). PLAN PAGE P2.0: Missing piping material specifications. Add piping material specifications.-2018 IPC 605.4, 702, 2018 IFGC 303 |
||
| 12/08/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 11/14/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |