Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Interior Shear Bracing
| Date |
Description |
Inspector |
Results |
Comments |
|
COT - HCBU - Interior Shear Bracing |
|
Re-inspection required |
7-21-26: add drywall screws to gyp board at party walls 8" o.c. throughout sill and in the field. Drywall screws cannot be closer than 3/8" from edges/joints. Add missing sections of drywall at party walls flush with decking or bottom of truss chords. |
| 07/24/2026 |
COT - HCBU - Interior Shear Bracing |
|
Re-inspection required |
7-24-26: several areas throughout do not have screws at the joints, add screws to base and soffit areas 8" o.c., and screws cannot be installed closer than 3/8" from joints/edges. |
| 07/28/2026 |
COT - HCBU - Interior Shear Bracing |
|
Partial Pass |
7-28-26: drywall screw inspection at all suites for Building 2 approved. Okay to tape & texture. |
| 08/18/2026 |
COT - HCBU - Interior Shear Bracing |
|
Partial Pass |
8-18-26: Suite 163 has been divided into an additional Suite ( Suite XXX ) thus a party wall was added together with additional metal wall framing on the other side of the suite. Submit an updated framing/ site & floor plan to the city for review/approval. Add screws to the east party wall at suite xxx 8" o.c. Along the base and at joints above ceiling. |
| 08/20/2026 |
COT - HCBU - Interior Shear Bracing |
|
Partial Pass |
8/20/26: East wall at suite xxx 8" o.c meets UL305 1 hour rating requirements. Inspection shall be called in when fire tape and fire caulk have been applied |
| 09/17/2026 |
COT - HCBU - Interior Shear Bracing |
|
Passed |
9/17/26: approved. |