Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Exterior Clips/Sheathing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 6-5-26: sheathing screw inspection at pop outs of building along the south and east sides. Okay to continue with construction at progress areas. Crickets were also inspected and approved . | |
| 06/23/2026 | COT - HCBU - Exterior Clips/Sheathing | Re-inspection required | 6-23-26: nail protruding nails flush with sheathing at several areas, add nails at joint/seams above doors, at interior demising walls add shot pins at 32" o.c., add anchor bolts to exterior walls within 12" of a splice at each side, add hold downs throughout -see detail 20 & 35, add Simpson Lsta30 strap with 11 (10d ) nails at each side of splice, add strap at post to beam-see detail 37 A & B, add A34's at openings per detail 35, add 12 (16d) nails at each side of a top plate splice, see detail 32 and add clips accordingly, provide truss calcs. Stopped inspection-additional items may be noted. | |
| 06/25/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 6-25-26: exterior shear walls together with interior demising wall framing approved. Add anchor bolts on each side of a splice within 12" and hold-downs throughout-see structural notes and details for more. We will verify hold-downs and anchor bolts at intermediates (prior to covering any walls). | |
| 07/02/2026 | COT - HCBU - Exterior Clips/Sheathing | Re-inspection required | 7-2-26: remove in wall insulation so that I may verify anchor bolts spacing per SW schedule. See hold-down schedule -S2.1.2 & SS1.3 Detail 35 for information. | |
| 07/06/2026 | COT - HCBU - Exterior Clips/Sheathing | Not Ready | 7.6.26 Not ready; Contractor wanted inspection for 7.7.26. |
|
| 07/10/2026 | COT - HCBU - Exterior Clips/Sheathing | Passed | 7.10.26 Holdowns installed along with anchor bolts. |