Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 02/24/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
2-24-26: underground plumbing at Building 2 & GL 3/C-D verified per plans & under test. Okay to backfill progress areas using shading materials. Also, verified trench depth on a 1/1/2" domestic water line located on the private side. Water line stems from the northeast section of site and runs approximately 200' in a southern direction. We need to verify tracer wire prior to backfill. |
| 03/06/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
3-6-26: partial pass-pending pressure test. Verified trench depth on a 1/1/2" domestic water line located on the private side. Water line stems from the northeast section of site and runs approximately 200' in a southern direction. Okay to backfill progress areas using shading materials. |
| 04/02/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
4-2-26: 4" charlotte underground plumbing pipe verified under test and per plans. Okay to backfill approximately 90' of trench using shading materials. Remaining section from midway point of clean out extending west over to building 1 's east wall will be inspected when ready. |
| 04/06/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
4-6-26: underground plumbing on a 4" charlotte piping located at the south side of site and that runs from east to west verified under test and per plans-okay to backfill approximately 45' of trench using shading materials. |
| 04/28/2026 |
COT - HCPL - Plumbing Progress |
|
Re-inspection required |
4-28-26: grease interceptor is missing tracer wire. Reschedule when ready. |
| 05/05/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
5-5-26: verifed 2" copper main water line stub-up at north side of building under test at 100psi. Also, verified tracer wire at grease interceptor. |
| 05/14/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
5-14-26: main water line stub up at north side of building verified under test at 3.5psi. |
| 05/27/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
5-27-26: verified a 3" gas pipe located on north side stemming into building above ceiling under test at 15 psi. Pipe has been under test since yesterday- okay to continue with construction at progress areas. |
|
COT - HCPL - Plumbing Progress |
|
Partial Pass |
6-23-26: 2" & 3/4" domestic copper line above ceiling verified under test at 100 psi |
| 06/24/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
6-24-26: partial pass for copper lines supports. We will verify remainder at intermediates. |
| 06/26/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
6-26-26: gas pressure test previously inspected. |