Permit: TC-COM-0523-01329
Permit Details
Apply Date:
05/19/2023
Applicant:
Description:
N/A
Permit Reviews
Permit Number - TC-COM-0523-01329
Permit Status: Inspections
Permit Description:
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/18/2023 | COMMERCIAL REVIEW - FULL v.2 | 11/06/2023 | REQUIRES RESUBMIT |
| 04/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/25/2024 | APPROVED |
| 11/06/2024 | COMMERCIAL REVIEW - FULL REVISION v.1 | 12/02/2024 | APPROVED |
| 05/25/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/27/2023 | REQUIRES RESUBMIT |
| 03/08/2024 | COMMERCIAL REVIEW - FULL v.4 | 03/26/2024 | APPROVED |
| 03/26/2024 | RESTAMP - COMMERCIAL v.1 | 03/28/2024 | APPROVED |
| 12/05/2023 | COMMERCIAL REVIEW - FULL v.3 | 01/02/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0523-01329
Permit Status: Inspections
Permit Description:
Total Outstanding Activity Conditions - 11
| Date | Name |
|---|---|
| 11/06/2024 | AIR BALANCING REPORT IS REQUIRED. |
| 11/06/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
| 11/06/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 11/06/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 11/06/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 11/06/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 11/06/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 11/06/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 11/06/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
| 11/06/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
| 11/06/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0523-01329
Permit Status: Inspections
Permit Description:
| Date | Description | Comments |
|---|---|---|
| 04/25/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0523-01329
Permite Description:
Total Outstanding Inspections - 20
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2024 | COT - HCBU - Roof Nailing | N/A | Partial Pass | Roof system for pleasantry restroom. Ok to cover roof system |
| 03/17/2025 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | One side. |
| 04/03/2025 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | This inspection is for the placement of a grease interceptor system for the pavilion. Ok to cover progress area. |
| 04/08/2025 | COT - FCON - Hood System - Final | N/A | Not Ready | it was a smoke test |
| 04/09/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Kitchen hood exhaust duct system…smoke tested. Ok to complete installation. |
| 11/06/2024 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | Plumbing underground at Fishing cat exhibit. Ok to cover progress areas. |
| 11/14/2024 | COT - HCPL - Yard Water Line | N/A | Partial Pass | Partial pass. Refer to highlight on plan. Okay to backfill progress areas. Shading required. 11/14/2024 |
| 08/04/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | Main pavilion hard lid areas at restrooms, meeting,rooms: Ok to cover progress areas. |
| 09/09/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | Tiger night house, 1” conduits to electric room. Ok to,cover progress areas. |
| 11/18/2024 | COT - LCBU - Preslab | N/A | Partial Pass | 11/18/24: PRE SLAB FOR CONCRETE ROOF SLAB AT RED PANDA UPPER NORTH HALF passed ok to proceed. |
| 10/29/2024 | COT - HCPL - Sewer | N/A | Partial Pass | Private man hole #1; 4” sewer line, approximately 50’ at tiger exhibitions. Ok to cover progress areas. |
| 04/14/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Domestic water lines in pheasantry restrooms. |
| 04/17/2025 | COT - HCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | Stem wall footing from pheasant restrooms to pavilion at approximately 215 feet. Ok to place concrete in progress areas. |
| 08/13/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Pagoda SES A: 3 each 800 amp,cabinets; ADY at 3 each 300 amps with 3 - 4 “ conduits. |
| 10/02/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | Electric conduits in Siamang roof slab. Ok to place concrete in progress area. |
| 10/30/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 10-30-24: Restrooms, 2nd lift, Red Panda, 2nd lift. |
| 09/03/2025 | COT - HCPL - Rough Soil | N/A | Partial Pass | Waste lines at 2” - 6” at Tiger Life Support; will complete when pool mechanical is in place. |
| 10/30/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 10:30-24: Fishing Cat Building. |
| 12/04/2025 | COT - BULD - SWG Clearance | N/A | Partial Pass | Re-inspection of gas line for pavilion as requested by SW Gas. Line pressure at 15 psi. OK to request for new meter and service to structure. |
| 12/04/2025 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | Siamang house water lines at 3/4” - 2” lines above ceiling. Otter house water lines at 3/4” - 2” above ceiling and hose bib lines. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0523-01329
Permit Description:
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2024 | COT - HCEL - Grounding/Bonding | Passed | Grounding system (2 each,copper ufer lines) located in Northeast corner of building. | |
| 09/26/2024 | COT - HCBU - Preslab | Passed | ||
| 02/24/2025 | COT - HCBU - Framing | Passed | ||
| 05/20/2025 | COT - HCPL - Yard Water Line | Passed | ||
| 10/24/2025 | BULD - Electrical Clearance | Passed | Equipment pad #2: Ok to set commercial meter and energize service. |