Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 03/27/2025 |
BULD - Electrical Clearance |
|
Partial Pass |
Please note that the address for two meters is 1000 S Randolph Way(CNTR) and 1000 S Randolph Way (NRSY). |
| 04/03/2025 |
BULD - Electrical Clearance |
|
Not Ready |
Clearance will be rescheduled when meter is to be set. |
| 08/13/2025 |
BULD - Electrical Clearance |
|
Partial Pass |
Pagoda SES A: 3 each 800 amp,cabinets; ADY at 3 each 300 amps with 3 - 4 “ conduits. |
| 10/24/2025 |
BULD - Electrical Clearance |
|
Passed |