Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 12620001C


Addresses:

3400 E ZOO CT


Inspection Status: Partial Pass

Inspection History: COT - LCBU - Preslab  

Permit Number - TC-COM-0523-01329

Inspection Description - COT - LCBU - Preslab  

Inspection Status - Partial Pass

Date Description Inspector Results Comments
02/14/2025 COT - LCBU - Preslab   Partial Pass North half of reptile house. Ok to place concrete in progress areas.
03/27/2025 COT - LCBU - Preslab   Partial Pass Pump house slab for otter enclosure. Ok to place concrete in progress areas.
05/21/2025 COT - LCBU - Preslab   Partial Pass Footings for the Siamang Building. Ok to place concrete in progress areas.
06/09/2025 COT - LCBU - Preslab   Partial Pass Slab areas for otter housing. Ok to place concrete in slab areas.
06/20/2025 COT - LCBU - Preslab   Partial Pass Siamang exhibit pre-slab; vapor barrier in place, ok to place. o Crete in slab area.
07/17/2025 COT - LCBU - Preslab   Canceled Contractor cancelled due to weather.
09/12/2025 COT - LCBU - Preslab   Partial Pass Tiger night house drain channel and CMU wall footing at Northeast corner of exhibit. OK to place concrete in progress areas.
10/02/2024 COT - LCBU - Preslab   Partial Pass Red Panda exhibit slab; rebar and moisture barrier in place. Ok to place concrete in progress areas.
10/23/2024 COT - LCBU - Preslab   Partial Pass Pre-slab for public restroom area. Ensure slab is properly termite treated.
11/07/2024 COT - LCBU - Preslab   Partial Pass Red panda exhibit; upper level above keepers area. Ok to place concrete in progress areas.
11/18/2024 COT - LCBU - Preslab   Partial Pass 11/18/24: PRE SLAB FOR CONCRETE ROOF SLAB AT RED PANDA UPPER NORTH HALF passed ok to proceed.
11/19/2024 COT - LCBU - Preslab   Partial Pass
12/10/2024 COT - LCBU - Preslab   Partial Pass Roof system for fishing cat exhibit. Rebar in place, electric conduit in place. Ok to place concrete in progress areas.