Parcel: 12620001C


Addresses:

3400 E ZOO CT


Inspection Status: Partial Pass

Inspection History: COT - HCBU - Masonry Pregrout 

Permit Number - TC-COM-0523-01329

Inspection Description - COT - HCBU - Masonry Pregrout 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
08/20/2024 COT - HCBU - Masonry Pregrout  Partial Pass 8/20/24: Asia pavilion okay to grout stem wall
10/16/2024 COT - HCBU - Masonry Pregrout  Partial Pass 10/16/24: pavilion and red panda okay to proceed to 2nd lift.
10/17/2024 COT - HCBU - Masonry Pregrout  Partial Pass 10/17/2024 partial pass 1st lift for the Tiger Life Support building.
10/25/2024 COT - HCBU - Masonry Pregrout  Partial Pass
10/28/2024 COT - HCBU - Masonry Pregrout  Partial Pass North and East CMU walls at 8’ - 12’. West interior wall at 8’ - 12’. Ok to grout progress areas of Asia Pavilion.. Public restroom CMU walls at 0’ - 4’. Ok to grout progress areas.
10/30/2024 COT - HCBU - Masonry Pregrout  Partial Pass 10-30-24: Restrooms, 2nd lift, Red Panda, 2nd lift.
11/04/2024 COT - HCBU - Masonry Pregrout  Not Ready Contractor cancelled due to inclement weather.
11/05/2024 COT - HCBU - Masonry Pregrout  Partial Pass Asian exhibit CMU walls: North, East, West walls at 8’ - 12’. Tiger support building, masonry walls at 0’ - 4’. Ok to grout progress areas.
11/07/2024 COT - HCBU - Masonry Pregrout  Partial Pass Asian pavilion exhibit; CMU walls 15’4” at East, West, and interior walls. South area; 8 CMU columns at 8’ - 12’. Asian area public restrooms; CMU walls at 17’4” at South, West, North walls. OK to grout progress areas.
11/13/2024 COT - HCBU - Masonry Pregrout  Partial Pass Fishing cat building. Stem wall reinforcements per plan okay to grout progress areas.
Tiger life support. 2nd lift reinforcements per plan. Okay to grout progress areas.
Red panda building. Parapet section east end. reinforcements per plan.
Pavilion building. 8’8” - 12’8” south, east and west elevation. 11/13/2024
11/15/2024 COT - HCBU - Masonry Pregrout  Partial Pass Tiger life support CMU Walls at 12’8”. Ok to place grout in progress areas.
11/18/2024 COT - HCBU - Masonry Pregrout  Partial Pass 8/20/24: Asia pavilion okay to grout stem wall.
10/16/24: pavilion and red panda okay to proceed to 2nd lift.
10/17/2024 partial pass 1st lift for the Tiger Life Support building.

Pavilion, grid line E to F/2, E grid lines 2-9, E to F grid line 6, grid line/6-9, G to F/9, second lift.

10-30-24: Restrooms, 2nd lift, Red Panda, 2nd lift.

Bathroom arch approved okay to fully grout.

Fishing cat building. Stem wall reinforcements per plan okay to grout progress areas.
Tiger life support. 2nd lift reinforcements per plan. Okay to grout progress areas.
Red panda building. Parapet section east end. reinforcements per plan.
Pavilion building. 8’8” - 12’8” south, east and west elevation. 11/13/2024
11/18/24:PRE GROUT FOR PAVILION TOP OUT ON CENTER BEARING WALL ok to proceed.
11/19/2024 COT - HCBU - Masonry Pregrout  Partial Pass Asian pavilion South CMU wall at 12’8” - 18’8” top out GL: C/2 - 9. OK to grout progress areas.