Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 01/31/2025 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
Conduits throughout structure, from,exterior transformer to electric room: conduits at 1” - 3”. |
| 02/14/2025 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
Underground 4” conduits (3 each) from (SES) pavilion to North transformer. Ok to cover progress areas. |
| 02/19/2025 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
2-19-25, electrical underground conduits on east side pavilion verified as per approved plans. Okay to backfill progress areas. |
| 02/25/2025 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
3” conduit from cell tower to transformer; 3” - 4” conduits from main line to disconnect to feed main service. Ok to,cover progress areas. |
| 05/12/2025 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
Electric conduits (1’ - 2”) at otter enclosure North side. Ok to place concrete in progress areas. |
| 05/13/2025 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
Electric conduits at 1” - 2” in Otter support area and otter pump house. Ok to,back fill progress areas and place concrete when soil has been compacted. |
| 08/29/2024 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
8/29/24: electrical underground at pavilion for SES-A per plans from SES-A to transformer ((3) 4") , form SES-A (2)4" (2) 1 1/2" (1) 2") to man hole passed ok to backfill progress area. (2)4" and (1)2" from pavilion to IT. |
| 09/09/2025 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
Tiger night house, 1” conduits to electric room. Ok to,cover progress areas. |
| 09/11/2024 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
9/11/24: red panda okay to cover underground feeder |