Permit: TC-COM-0423-01131
Permit Details
Apply Date:
04/24/2023
Applicant:
Ian Regan
Description:
INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS.
Permit Reviews
Permit Number - TC-COM-0423-01131
Permit Status: Complete
Permit Description: INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | APPROVED |
02/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/08/2024 | APPROVED |
07/04/2023 | RESTAMP - COMMERCIAL v.1 | 07/05/2023 | APPROVED |
01/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2024 | APPROVED |
05/03/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/07/2023 | REQUIRES RESUBMIT |
06/24/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/04/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-01131
Permite Description: INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS.
Total Outstanding Inspections - 15
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2023 | COT - HCME - Mechanical Progress | N/A | Not Applicable | 8/2/23: duplicate inspection |
COT - FCON - Alarm - Final | N/A | Not Ready | ||
02/02/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Southwest quadrant (2a) Approved for TCO level 3. FDC signs, 1 notification device in J321 |
07/26/2023 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 6/12/23. North wall, room L0200. 7/26/23: L0200 East wall electrical and L0220 electrical |
12/14/2023 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed 10/11/23: K Block Electrical above ceiling per plan ok to proceed 10/20/23: G0300 main area electrical above ceiling passed. 10/26/23: D0205 I.T and small rooms in G0300 electrical above ceiling passed. 11/6/23: D0300 above ceiling complete. 10/4/23: plumbing above ceiling in L0200 and L0300 per plan ok to proceed. 10/26/23: D0205 I.T and small rooms in G0300 plumbing above ceiling passed. 11/6/23: Above ceiling complete in D0300. 11/22/23: B0300 main room above ceiling complete. Pending small rooms. 12/5/23: Above ceiling complete in B0300, Complete in A0300, Above ceiling in main corridor Area H and Area G from grid line E. Ok to proceed in progress areas. 12/14/23: electrical above ceiling in F0200 corridor and K0400 passed ok to place grid tiles. |
02/05/2024 | COT - HCBU - Building Final | N/A | Partial Pass | 1/12/24: Level 3 TCO From CL N to CL E |
08/25/2023 | COT - HCME - Hydronic Piping | N/A | Partial Pass | 7/24/23: Hydronic piping from air handler one to main corridor. Supply and return 8/2/23: Hydronic piping from main to G0300 under air test ( asking to insulate) 8/25/23: not ready |
09/28/2023 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 7/18/23. Not ready 7/24/23: From column M3 to west side corridor, Hard duct in area G4 (VAV 1-27) 7/26/23: From column M3 to L3, Hard duct in corridor K0400 8/2/23: K0200 Hard duct 8/7/23: VAV 1 West side corridor M0300 8/18/23: L0300 All VAV under air test, Hard duct in L0300 run offs complete 8/21/23: K0200 break room hard duct passed, east corridor to K column hard duct passed. 8/23/23: K0200 3 transfers on north wall, supply Hard duct column k to j3, L0200 VAV 29 complete, G0300 hard duct transition from west to north. 8/25/22: Corridor K hard duct 8/29/23: J0330 corridor Hard duct (18x24) from column M-N ok to insulate, Hard Duct supply from column K to H3 ok to insulate. 8/31/23: G0300 hard duct at VAV 1-14 and 1-13 ready to insulate, VAV 1-12 tied into main, J0215 duct run offs complete, main hard duct from column H3-H ok to insulate, L0300 small rooms return and run offs complete and insulated. 9/6/23: D0200 Hard duct ok to insulate, Run-offs over J0321 ok to insulate, K corridor round tie to VAV 1-12, transition from hard duct to VAV 1-13 in G0300, VAV 3-3 in G0300 passed. 9/12/23: Hard duct supply 18"x24" Column K-H, Main duct tie into L0300 ok to insulate 9/14/23: main corridor hard duct to column F3 ok to insulate after pressure test, all run offs in G0300 main area complete, All run offs to rooms in G0300 complete. 9/18/23: Hard duct in G0315 complete, G0300 main room runoffs complete, L0205 L0210 L0215 return air registers complete, G0300 vestibule tie into main duct in corridor. 9/20/23: Hard duct 76"x36" tie into K0200, Hard duct 76"x36" tie into VAV 1-26, G0300 main duct run-off complete to VAV 1-17 ok to insulate. 9/22/23: G0300 VAV 1-20 run off complete, FC-11 hard duct into K0300 9/28/23: D0300 Main supply hard duct per plan. |
07/14/2023 | COT - HCBU - Framing | N/A | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. |
08/25/2023 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 8/7/23: L0200 phone rooms in wall electrical, room J0210 in wall electrical , K0200 break room in wall electrical 8/25/23: not ready |
02/22/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
09/28/2023 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 7/24/23: 2" copper drain line at room L0300 to main corridor 7/26/23: domestic line at room L0300 8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall 8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test 8/18/23: D0200 break room in wall plumbing for sink under test 8/31/23: sanitary plumbing on west side under test including 4 sinks 9/12/23: Domestic cold water main ok to insulate 9/28/23: Domestic cold water in D0300 to sink under pressure , vent and waste in D0300 under pressure, 1" Domestic cold water from main line to (A0300,B0300,D0300) with shut-off valves at vestibules. |
07/19/2023 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | 7/18/23. Hard duct, room L0200 |
11/22/2023 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | 10/4/23: plumbing above ceiling in L0200 and L0300 per plan ok to proceed. 10/26/23: D0205 I.T and small rooms in G0300 plumbing above ceiling passed. 11/6/23: Above ceiling complete in D0300. 11/22/23: B0300 main room above ceiling complete. Pending small rooms. |
09/28/2023 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. 9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall. 9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall. 9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room. 9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-01131
Permit Description: INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS.
Total Completed Inspections - 22