Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/24/2023
Applicant:
Ian Regan
Description:
INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS.

Permit Reviews

Permit Number - TC-COM-0423-01131
Permit Status: Complete
Permit Description: INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS.
Start Date Submittal Complete Date Status  
02/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/29/2024 APPROVED Review Details
02/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/08/2024 APPROVED Review Details
07/04/2023 RESTAMP - COMMERCIAL v.1 07/05/2023 APPROVED Review Details
01/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/31/2024 APPROVED Review Details
05/03/2023 COMMERCIAL REVIEW - FULL v.1 06/07/2023 REQUIRES RESUBMIT Review Details
06/24/2023 COMMERCIAL REVIEW - FULL v.2 07/04/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0423-01131
Permite Description: INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS.
Total Outstanding Inspections - 15
Last Inspection Date Description Inspector Results Comments
08/02/2023 COT - HCME - Mechanical Progress N/A Not Applicable 8/2/23: duplicate inspection
COT - FCON - Alarm - Final N/A Not Ready
02/02/2024 COT - FCON - Fire - Final N/A Partial Pass Southwest quadrant (2a) Approved for TCO level 3.
FDC signs, 1 notification device in J321
07/26/2023 COT - HCEL - Electrical Intermediate N/A Partial Pass 6/12/23. North wall, room L0200.
7/26/23: L0200 East wall electrical and L0220 electrical
12/14/2023 COT - HCEL - Electrical Above Ceiling N/A Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/23: K Block Electrical above ceiling per plan ok to proceed
10/20/23: G0300 main area electrical above ceiling passed.
10/26/23: D0205 I.T and small rooms in G0300 electrical above ceiling passed.
11/6/23: D0300 above ceiling complete.
10/4/23: plumbing above ceiling in L0200 and L0300 per plan ok to proceed.
10/26/23: D0205 I.T and small rooms in G0300 plumbing above ceiling passed.
11/6/23: Above ceiling complete in D0300.
11/22/23: B0300 main room above ceiling complete. Pending small rooms.
12/5/23: Above ceiling complete in B0300, Complete in A0300, Above ceiling in main corridor Area H and Area G from grid line E. Ok to proceed in progress areas.
12/14/23: electrical above ceiling in F0200 corridor and K0400 passed ok to place grid tiles.
02/05/2024 COT - HCBU - Building Final N/A Partial Pass 1/12/24: Level 3 TCO From CL N to CL E
08/25/2023 COT - HCME - Hydronic Piping N/A Partial Pass 7/24/23: Hydronic piping from air handler one to main corridor. Supply and return
8/2/23: Hydronic piping from main to G0300 under air test ( asking to insulate)
8/25/23: not ready
09/28/2023 COT - HCME - Mechanical Intermediate N/A Partial Pass 7/18/23. Not ready
7/24/23: From column M3 to west side corridor, Hard duct in area G4 (VAV 1-27)
7/26/23: From column M3 to L3, Hard duct in corridor K0400
8/2/23: K0200 Hard duct
8/7/23: VAV 1 West side corridor M0300
8/18/23: L0300 All VAV under air test, Hard duct in L0300 run offs complete
8/21/23: K0200 break room hard duct passed, east corridor to K column hard duct passed.
8/23/23: K0200 3 transfers on north wall, supply Hard duct column k to j3, L0200 VAV 29 complete, G0300 hard duct transition from west to north.
8/25/22: Corridor K hard duct
8/29/23: J0330 corridor Hard duct (18x24) from column M-N ok to insulate, Hard Duct supply from column K to H3 ok to insulate.
8/31/23: G0300 hard duct at VAV 1-14 and 1-13 ready to insulate, VAV 1-12 tied into main, J0215 duct run offs complete, main hard duct from column H3-H ok to insulate, L0300 small rooms return and run offs complete and insulated.
9/6/23: D0200 Hard duct ok to insulate, Run-offs over J0321 ok to insulate, K corridor round tie to VAV 1-12, transition from hard duct to VAV 1-13 in G0300, VAV 3-3 in G0300 passed.
9/12/23: Hard duct supply 18"x24" Column K-H, Main duct tie into L0300 ok to insulate
9/14/23: main corridor hard duct to column F3 ok to insulate after pressure test, all run offs in G0300 main area complete, All run offs to rooms in G0300 complete.
9/18/23: Hard duct in G0315 complete, G0300 main room runoffs complete, L0205 L0210 L0215 return air registers complete, G0300 vestibule tie into main duct in corridor.
9/20/23: Hard duct 76"x36" tie into K0200, Hard duct 76"x36" tie into VAV 1-26, G0300 main duct run-off complete to VAV 1-17 ok to insulate.
9/22/23: G0300 VAV 1-20 run off complete, FC-11 hard duct into K0300
9/28/23: D0300 Main supply hard duct per plan.
07/14/2023 COT - HCBU - Framing N/A Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.
08/25/2023 COT - HCEL - Electrical Progress N/A Partial Pass 8/7/23: L0200 phone rooms in wall electrical, room J0210 in wall electrical , K0200 break room in wall electrical
8/25/23: not ready
02/22/2024 COT - BULD - SWG Clearance N/A Not Applicable
09/28/2023 COT - HCPL - Plumbing Intermediate N/A Partial Pass 7/24/23: 2" copper drain line at room L0300 to main corridor

7/26/23: domestic line at room L0300

8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall

8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test

8/18/23: D0200 break room in wall plumbing for sink under test

8/31/23: sanitary plumbing on west side under test including 4 sinks

9/12/23: Domestic cold water main ok to insulate

9/28/23: Domestic cold water in D0300 to sink under pressure , vent and waste in D0300 under pressure, 1" Domestic cold water from main line to (A0300,B0300,D0300) with shut-off valves at vestibules.
07/19/2023 COT - HCME - Mechanical Above Ceiling N/A Partial Pass 7/18/23. Hard duct, room L0200
11/22/2023 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass 10/4/23: plumbing above ceiling in L0200 and L0300 per plan ok to proceed.
10/26/23: D0205 I.T and small rooms in G0300 plumbing above ceiling passed.
11/6/23: Above ceiling complete in D0300.
11/22/23: B0300 main room above ceiling complete. Pending small rooms.
09/28/2023 COT - HCBU - Interior Shear Bracing N/A Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.

9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.

9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall.

9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall.

9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room.

9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0423-01131
Permit Description: INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS.
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/12/2024 COT - FCON - Alarm - Final Passed
02/02/2024 COT - HCME - Mechanical Final Passed
02/02/2024 COT - HCEL - Electrical Final Passed
02/02/2024 COT - FCON - Sprinkler - Final Passed
02/08/2024 ENGR Engineering Final Passed No site work required or completed (per approved plan).
02/21/2024 COT - FCON - Fire - Final Passed
02/22/2024 COT - HCBU - Building Above Ceiling Passed
02/22/2024 COT - HCEL - Electrical Intermediate Passed
02/22/2024 COT - HCEL - Electrical Above Ceiling Passed
02/29/2024 TRSP - ROW - Final/Close-Out Passed
02/22/2024 COT - HCBU - Building Final Passed
03/01/2024 COT - HCPL - Rough Soil Passed
02/22/2024 COT - HCME - Hydronic Piping Passed
02/22/2024 COT - HCME - Mechanical Intermediate Passed
02/22/2024 COT - HCBU - Framing Passed
02/22/2024 COT - HCEL - Electrical Progress Passed
02/22/2024 BULD - Electrical Clearance Passed
02/22/2024 COT - HCPL - Plumbing Intermediate Passed
02/22/2024 COT - HCME - Mechanical Above Ceiling Passed
02/22/2024 COT - HCPL - Plumbing Above Ceiling Passed
02/22/2024 COT - HCBU - Interior Shear Bracing Passed
02/22/2024 COT - HCBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
RAYTHEON 808 OFFICE CONVERSION PHASE 1 - FINAL PHASE REPORT_V1.PDF DOCUMENTS VIEW
PHASE 2- CHLORINATION REPORT-2024-01-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TC-COM-0423-01131-RTX B808 PHASE 2 RENO PLAN REVIEW RESPONSE 23-0621_V1.PDF DOCUMENTS VIEW
CALC COVER 122317_V1.PDF DOCUMENTS VIEW
CONS-42213.03 - RTX B808 PHASE 2 RENO IFC 23-0424_V1.PDF DOCUMENTS VIEW