02/22/2024 COT - HCBU - Framing Passed
02/22/2024 COT - HCBU - Framing Passed
07/14/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.
07/26/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220
08/02/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200
08/07/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall
08/11/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall
08/18/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall
08/21/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready
08/23/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3
08/25/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing
08/31/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.
09/06/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling
09/08/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready
09/12/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready

9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed
09/14/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready

9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed

9/14/23: D0305 room framing, D0300 south vestibule
09/20/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready

9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed

9/14/23: D0305 room framing, D0300 south vestibule

9/20/23: B0315 north wall, A0300-B0300 dividing wall
09/22/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready

9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed

9/14/23: D0305 room framing, D0300 south vestibule

9/20/23: B0315 north wall, A0300-B0300 dividing wall

9/22/23: B0310,B0315,A0310 framing done ok to proceed
10/04/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready

9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed

9/14/23: D0305 room framing, D0300 south vestibule

9/20/23: B0315 north wall, A0300-B0300 dividing wall

9/22/23: B0310,B0315,A0310 framing done ok to proceed

10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan.
10/11/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready

9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed

9/14/23: D0305 room framing, D0300 south vestibule

9/20/23: B0315 north wall, A0300-B0300 dividing wall

9/22/23: B0310,B0315,A0310 framing done ok to proceed

10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan.

10/11/23: J300 ceiling lid. Ok to cover
10/18/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready

9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed

9/14/23: D0305 room framing, D0300 south vestibule

9/20/23: B0315 north wall, A0300-B0300 dividing wall

9/22/23: B0310,B0315,A0310 framing done ok to proceed

10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan.

10/11/23: J300 ceiling lid. Ok to cover

10/18/23:A0300 east side exit, B0200 west wall
10/26/2023 COT - HCBU - Framing Partial Pass 10/26/23: D0300 interior vestibule framing, D0300 east side column framing, A0300 west side column framing.
11/01/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready

9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed

9/14/23: D0305 room framing, D0300 south vestibule

9/20/23: B0315 north wall, A0300-B0300 dividing wall

9/22/23: B0310,B0315,A0310 framing done ok to proceed

10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan.

10/11/23: J300 ceiling lid. Ok to cover

10/18/23:A0300 east side exit, B0200 west wall

11/1/23: A0300 interior vestibule per plan, A0300 wing walls per plan, Bulk heads near lobby.
11/06/2023 COT - HCBU - Framing Partial Pass 6/12/23. West and south wall in room L0300.

6/21/23 North wall of L0200

6/29/23. Room L0315 and L0310

8/11/23: L0300 East wall

7/10/23. Room L0 200. Interior walls for room L0300.

7/13/23 Room, F0200, north and west walls.

7/24/23: F4 column and girder

7/26/23: Room L0200 east wall, Room L0220

8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200

8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall

8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall

8/21/23: not ready

8/23/23: Framing Column G3, J3, L3

8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing

8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall.

9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling

9/8/23: Not ready

9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed

9/14/23: D0305 room framing, D0300 south vestibule

9/20/23: B0315 north wall, A0300-B0300 dividing wall

9/22/23: B0310,B0315,A0310 framing done ok to proceed

10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan.

10/11/23: J300 ceiling lid. Ok to cover

10/18/23:A0300 east side exit, B0200 west wall

11/1/23: A0300 interior vestibule per plan, A0300 wing walls per plan, Bulk heads near lobby.

11/6/23: F0200 south and east wall.