Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCBU - Framing
Permit Number - TC-COM-0423-01131
Inspection Description - COT - HCBU - Framing
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/22/2024 | COT - HCBU - Framing | Passed | ||
02/22/2024 | COT - HCBU - Framing | Passed | ||
07/14/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. |
|
07/26/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 |
|
08/02/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 |
|
08/07/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall |
|
08/11/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall |
|
08/18/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall |
|
08/21/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready |
|
08/23/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 |
|
08/25/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing |
|
08/31/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. |
|
09/06/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling |
|
09/08/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready |
|
09/12/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready 9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed |
|
09/14/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready 9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed 9/14/23: D0305 room framing, D0300 south vestibule |
|
09/20/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready 9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed 9/14/23: D0305 room framing, D0300 south vestibule 9/20/23: B0315 north wall, A0300-B0300 dividing wall |
|
09/22/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready 9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed 9/14/23: D0305 room framing, D0300 south vestibule 9/20/23: B0315 north wall, A0300-B0300 dividing wall 9/22/23: B0310,B0315,A0310 framing done ok to proceed |
|
10/04/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready 9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed 9/14/23: D0305 room framing, D0300 south vestibule 9/20/23: B0315 north wall, A0300-B0300 dividing wall 9/22/23: B0310,B0315,A0310 framing done ok to proceed 10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan. |
|
10/11/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready 9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed 9/14/23: D0305 room framing, D0300 south vestibule 9/20/23: B0315 north wall, A0300-B0300 dividing wall 9/22/23: B0310,B0315,A0310 framing done ok to proceed 10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan. 10/11/23: J300 ceiling lid. Ok to cover |
|
10/18/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready 9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed 9/14/23: D0305 room framing, D0300 south vestibule 9/20/23: B0315 north wall, A0300-B0300 dividing wall 9/22/23: B0310,B0315,A0310 framing done ok to proceed 10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan. 10/11/23: J300 ceiling lid. Ok to cover 10/18/23:A0300 east side exit, B0200 west wall |
|
10/26/2023 | COT - HCBU - Framing | Partial Pass | 10/26/23: D0300 interior vestibule framing, D0300 east side column framing, A0300 west side column framing. | |
11/01/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready 9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed 9/14/23: D0305 room framing, D0300 south vestibule 9/20/23: B0315 north wall, A0300-B0300 dividing wall 9/22/23: B0310,B0315,A0310 framing done ok to proceed 10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan. 10/11/23: J300 ceiling lid. Ok to cover 10/18/23:A0300 east side exit, B0200 west wall 11/1/23: A0300 interior vestibule per plan, A0300 wing walls per plan, Bulk heads near lobby. |
|
11/06/2023 | COT - HCBU - Framing | Partial Pass | 6/12/23. West and south wall in room L0300. 6/21/23 North wall of L0200 6/29/23. Room L0315 and L0310 8/11/23: L0300 East wall 7/10/23. Room L0 200. Interior walls for room L0300. 7/13/23 Room, F0200, north and west walls. 7/24/23: F4 column and girder 7/26/23: Room L0200 east wall, Room L0220 8/2/23: G0300 west wall, Rooms H0305, H0300, G0310, G0305, G0315, F0300 south and west walls, Room L0220 and K0200 8/7/23: L0200 phone rooms, G0300 East wall framing shaft wall 8/18/23: rooms D0200 and D0205, B0200 North wall and C0200 North wall 8/21/23: not ready 8/23/23: Framing Column G3, J3, L3 8/25/23:L0300 Vestibule framing, Kblock headers framing, Box out beam from column C3-C4 and from B3-B4 framing 8/31/23: K0305,G0300 exit alcove, G0300 west shaft wall, D0300 Shaft wall, D0300-B0300 dividing wall. 9/6/23: E0215 north corridor exterior walls D3-B3, K-block drop ceiling 9/8/23: Not ready 9/12/23: G0300 West wall, Kick outs by sink in G0300, Interior vestibule wall in G0300, D0315,D0310,D0305 all good to proceed 9/14/23: D0305 room framing, D0300 south vestibule 9/20/23: B0315 north wall, A0300-B0300 dividing wall 9/22/23: B0310,B0315,A0310 framing done ok to proceed 10/4/23: J0330 east wall framing per plan, Header between D0200 and C0200 per plan. 10/11/23: J300 ceiling lid. Ok to cover 10/18/23:A0300 east side exit, B0200 west wall 11/1/23: A0300 interior vestibule per plan, A0300 wing walls per plan, Bulk heads near lobby. 11/6/23: F0200 south and east wall. |