Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: COT - HCPL - Plumbing Intermediate 

Permit Number - TC-COM-0423-01131

Inspection Description - COT - HCPL - Plumbing Intermediate 

Inspection Status - Passed

Date Description Inspector Results Comments
02/22/2024 COT - HCPL - Plumbing Intermediate  Passed
07/26/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 7/24/23: 2" copper drain line at room L0300 to main corridor

7/26/23: domestic line at room L0300
08/07/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 7/24/23: 2" copper drain line at room L0300 to main corridor

7/26/23: domestic line at room L0300

8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall
08/11/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 7/24/23: 2" copper drain line at room L0300 to main corridor

7/26/23: domestic line at room L0300

8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall

8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test
08/18/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 7/24/23: 2" copper drain line at room L0300 to main corridor

7/26/23: domestic line at room L0300

8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall

8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test

8/18/23: D0200 break room in wall plumbing for sink under test
08/31/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 7/24/23: 2" copper drain line at room L0300 to main corridor

7/26/23: domestic line at room L0300

8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall

8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test

8/18/23: D0200 break room in wall plumbing for sink under test

8/31/23: sanitary plumbing on west side under test including 4 sinks
09/12/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 7/24/23: 2" copper drain line at room L0300 to main corridor

7/26/23: domestic line at room L0300

8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall

8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test

8/18/23: D0200 break room in wall plumbing for sink under test

8/31/23: sanitary plumbing on west side under test including 4 sinks

9/12/23: Domestic cold water main ok to insulate
09/28/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 7/24/23: 2" copper drain line at room L0300 to main corridor

7/26/23: domestic line at room L0300

8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall

8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test

8/18/23: D0200 break room in wall plumbing for sink under test

8/31/23: sanitary plumbing on west side under test including 4 sinks

9/12/23: Domestic cold water main ok to insulate

9/28/23: Domestic cold water in D0300 to sink under pressure , vent and waste in D0300 under pressure, 1" Domestic cold water from main line to (A0300,B0300,D0300) with shut-off valves at vestibules.
10/02/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules
10/04/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 10/4/23: A0300 domestic water to sink under pressure, waste and vent per plan and under pressure.
10/11/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules

10/4/23: A0300 domestic water to sink under pressure, waste and vent per plan and under pressure.

10/11/23: B0300 heating water for VAV 1-12, 1-14,1-15 under test ok to insulate. K0200 hot and cold water tie into feeding lines under pressure.
10/12/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules

10/4/23: A0300 domestic water to sink under pressure, waste and vent per plan and under pressure.

10/11/23: B0300 heating water for VAV 1-12, 1-14,1-15 under test ok to insulate. K0200 hot and cold water tie into feeding lines under pressure.
11/01/2023 COT - HCPL - Plumbing Intermediate  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules

10/4/23: A0300 domestic water to sink under pressure, waste and vent per plan and under pressure.

10/11/23: B0300 heating water for VAV 1-12, 1-14,1-15 under test ok to insulate. K0200 hot and cold water tie into feeding lines under pressure.

11/1/23: sanitary from D0200 down corridor to B0300 under test, Domestic water from A0300 to D0300 under test, condensation drain from mini split in D0205 to D0200.