Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCPL - Plumbing Intermediate
Permit Number - TC-COM-0423-01131
Inspection Description - COT - HCPL - Plumbing Intermediate
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/22/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
07/26/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 7/24/23: 2" copper drain line at room L0300 to main corridor 7/26/23: domestic line at room L0300 |
|
08/07/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 7/24/23: 2" copper drain line at room L0300 to main corridor 7/26/23: domestic line at room L0300 8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall |
|
08/11/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 7/24/23: 2" copper drain line at room L0300 to main corridor 7/26/23: domestic line at room L0300 8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall 8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test |
|
08/18/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 7/24/23: 2" copper drain line at room L0300 to main corridor 7/26/23: domestic line at room L0300 8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall 8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test 8/18/23: D0200 break room in wall plumbing for sink under test |
|
08/31/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 7/24/23: 2" copper drain line at room L0300 to main corridor 7/26/23: domestic line at room L0300 8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall 8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test 8/18/23: D0200 break room in wall plumbing for sink under test 8/31/23: sanitary plumbing on west side under test including 4 sinks |
|
09/12/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 7/24/23: 2" copper drain line at room L0300 to main corridor 7/26/23: domestic line at room L0300 8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall 8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test 8/18/23: D0200 break room in wall plumbing for sink under test 8/31/23: sanitary plumbing on west side under test including 4 sinks 9/12/23: Domestic cold water main ok to insulate |
|
09/28/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 7/24/23: 2" copper drain line at room L0300 to main corridor 7/26/23: domestic line at room L0300 8/7/23: K0200 break room water supply in wall, J0210 Water supply in wall 8/11/23: Hot water supply and return Area J jumping corridor under air test, G0300 Sink and refrigerator under air test, J0210 Sink plumbing under air test 8/18/23: D0200 break room in wall plumbing for sink under test 8/31/23: sanitary plumbing on west side under test including 4 sinks 9/12/23: Domestic cold water main ok to insulate 9/28/23: Domestic cold water in D0300 to sink under pressure , vent and waste in D0300 under pressure, 1" Domestic cold water from main line to (A0300,B0300,D0300) with shut-off valves at vestibules. |
|
10/02/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules |
|
10/04/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 10/4/23: A0300 domestic water to sink under pressure, waste and vent per plan and under pressure. | |
10/11/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules 10/4/23: A0300 domestic water to sink under pressure, waste and vent per plan and under pressure. 10/11/23: B0300 heating water for VAV 1-12, 1-14,1-15 under test ok to insulate. K0200 hot and cold water tie into feeding lines under pressure. |
|
10/12/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules 10/4/23: A0300 domestic water to sink under pressure, waste and vent per plan and under pressure. 10/11/23: B0300 heating water for VAV 1-12, 1-14,1-15 under test ok to insulate. K0200 hot and cold water tie into feeding lines under pressure. |
|
11/01/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules 10/4/23: A0300 domestic water to sink under pressure, waste and vent per plan and under pressure. 10/11/23: B0300 heating water for VAV 1-12, 1-14,1-15 under test ok to insulate. K0200 hot and cold water tie into feeding lines under pressure. 11/1/23: sanitary from D0200 down corridor to B0300 under test, Domestic water from A0300 to D0300 under test, condensation drain from mini split in D0205 to D0200. |