Inspection Status: Partial Pass

Inspection History: COT - HCEL - Electrical Above Ceiling 

Permit Number - TC-COM-0423-01131

Inspection Description - COT - HCEL - Electrical Above Ceiling 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
COT - HCEL - Electrical Above Ceiling  Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/23: K Block Electrical above ceiling per plan ok to proceed
10/20/23: G0300 main area electrical above ceiling passed.
10/26/23: D0205 I.T and small rooms in G0300 electrical above ceiling passed.
11/6/23: D0300 above ceiling complete.
10/4/23: plumbing above ceiling in L0200 and L0300 per plan ok to proceed.
10/26/23: D0205 I.T and small rooms in G0300 plumbing above ceiling passed.
11/6/23: Above ceiling complete in D0300.
11/22/23: B0300 main room above ceiling complete. Pending small rooms.
12/5/23: Above ceiling complete in B0300, Complete in A0300, Above ceiling in main corridor Area H and Area G from grid line E. Ok to proceed in progress areas.
12/14/23: electrical above ceiling in F0200 corridor and K0400 passed ok to place grid tiles.
1/3/23: above ceiling complete in corridor area J, B0305 vestibule, C0300 Vestibule, D0200 corridor, K0200 corridor, J0321 hallway, F0300 vestibule.
02/22/2024 COT - HCEL - Electrical Above Ceiling  Passed
10/04/2023 COT - HCEL - Electrical Above Ceiling  Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/2023 COT - HCEL - Electrical Above Ceiling  Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/23: K Block Electrical above ceiling per plan ok to proceed
10/20/2023 COT - HCEL - Electrical Above Ceiling  Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/23: K Block Electrical above ceiling per plan ok to proceed
10/20/23: G0300 main area electrical above ceiling passed.
10/26/2023 COT - HCEL - Electrical Above Ceiling  Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/23: K Block Electrical above ceiling per plan ok to proceed
10/20/23: G0300 main area electrical above ceiling passed.
10/26/23: D0205 I.T and small rooms in G0300 electrical above ceiling passed.
11/06/2023 COT - HCEL - Electrical Above Ceiling  Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/23: K Block Electrical above ceiling per plan ok to proceed
10/20/23: G0300 main area electrical above ceiling passed.
10/26/23: D0205 I.T and small rooms in G0300 electrical above ceiling passed.
11/6/23: D0300 above ceiling complete.
11/22/2023 COT - HCEL - Electrical Above Ceiling  Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/23: K Block Electrical above ceiling per plan ok to proceed
10/20/23: G0300 main area electrical above ceiling passed.
10/26/23: D0205 I.T and small rooms in G0300 electrical above ceiling passed.
11/6/23: D0300 above ceiling complete.
10/4/23: plumbing above ceiling in L0200 and L0300 per plan ok to proceed.
10/26/23: D0205 I.T and small rooms in G0300 plumbing above ceiling passed.
11/6/23: Above ceiling complete in D0300.
11/22/23: B0300 main room above ceiling complete. Pending small rooms.
12/05/2023 COT - HCEL - Electrical Above Ceiling  Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/23: K Block Electrical above ceiling per plan ok to proceed
10/20/23: G0300 main area electrical above ceiling passed.
10/26/23: D0205 I.T and small rooms in G0300 electrical above ceiling passed.
11/6/23: D0300 above ceiling complete.
10/4/23: plumbing above ceiling in L0200 and L0300 per plan ok to proceed.
10/26/23: D0205 I.T and small rooms in G0300 plumbing above ceiling passed.
11/6/23: Above ceiling complete in D0300.
11/22/23: B0300 main room above ceiling complete. Pending small rooms.
12/5/23: Above ceiling complete in B0300, Complete in A0300, Above ceiling in main corridor Area H and Area G from grid line E. Ok to proceed in progress areas.
12/14/2023 COT - HCEL - Electrical Above Ceiling  Partial Pass 10/4/23: Electrical above ceiling in L0300 and L0200 per plan ok to proceed
10/11/23: K Block Electrical above ceiling per plan ok to proceed
10/20/23: G0300 main area electrical above ceiling passed.
10/26/23: D0205 I.T and small rooms in G0300 electrical above ceiling passed.
11/6/23: D0300 above ceiling complete.
10/4/23: plumbing above ceiling in L0200 and L0300 per plan ok to proceed.
10/26/23: D0205 I.T and small rooms in G0300 plumbing above ceiling passed.
11/6/23: Above ceiling complete in D0300.
11/22/23: B0300 main room above ceiling complete. Pending small rooms.
12/5/23: Above ceiling complete in B0300, Complete in A0300, Above ceiling in main corridor Area H and Area G from grid line E. Ok to proceed in progress areas.
12/14/23: electrical above ceiling in F0200 corridor and K0400 passed ok to place grid tiles.