Parcel Attributes
| Parcel | 14043013B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | I-2 |
| Airport Environs Zone | Tucson International AEZ Paddle |
| Tucson Ward | Ward 5 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Historic Records Requests
Address: 1151 E HERMANS RD
Date - 12/07/2025 1:01 a.m.
Total Number Of Historic Records Requests - (1)
| Name | Action |
|---|---|
| Address: 1151 E HERMANS RD - Doc Type: DOCUMENTS |
Annexations & Original City Zoning (OCZ)
Address: 1151 E HERMANS RD
Date - 12/07/2025 1:01 a.m.
Total Number Of Annexations & Original City Zoning (2)
Permits
Address: 1151 E HERMANS RD
Date - 12/07/2025 1:01 a.m.
Total Number Of Permits - (542)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T17FC01036 | Expired | 12/20/2017 | 12/22/2018 | 801 | Fire Construction Permit | Automatic Fire Extingshing Sys - MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM; Commercial Fire Sprinkler Systems - Modification of heads: 34 |
| T21FC00875 | Expired | 12/02/2021 | 05/03/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - Modify existing wet pipe fire sprinkler system.; Commercial Fire Sprinkler Systems - Modification of heads: 8 | |
| T21FC00879 | Expired | 12/02/2021 | 05/03/2023 | Fire Construction Permit | Fire Alarm & Detection Systems - MODIFY ONE (1) EXISTING NOTIFIER BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON - NORTH AIRPORT EXPANSION - B847.; Fire Alarm Systems - Devices Modified: 19 | |
| TF-FOP-1122-00159 | Complete | 11/30/2022 | 01/05/2024 | BLDG 805 | Fire Operational Permit | 12-7-22 Raytheon AA 60'x100' Tent w/ Stakes 260ft of Sidewall |
| T17FC00968 | Expired | 11/30/2017 | 10/16/2018 | 920 | Fire Construction Permit | Automatic Fire Extingshing Sys - Installation of a New Wet automatic Fire Sprinkler system |
| T17FC00960 | Expired | 11/28/2017 | 12/03/2018 | 847 | Fire Construction Permit | Automatic Fire Extingshing Sys - ADD 4 SPRINKLER HEADS IN ANECHOIC CHAMBER ADDITION. REPLACE +- 110' OF 2 1/2" WITH NEW 4". REPLACE 2 1/2" PREACTION VALVE WITH NEW 4" PREACTION VALVE.; Commercial Fire Sprinkler Systems - Modification of heads: 4 |
| TF-FCP-1125-01000 | In Review | 11/26/2025 | N/A | BLDG 847 | Fire Construction Permit | INSTALL A NEW SINGLE INTERLOCK PRE-ACTION FIRE SPRINKLER SYSTEM AT THE RAYTHEON TECHNOLOGIES RADIO FREQUENCY SHIELD PROJECT. |
| T20FC00794 | Expired | 11/23/2020 | 12/27/2022 | Fire Construction Permit | Automatic Fire Extingshing Sys - Modify fire sprinkler system to accommodate existing system.; Commercial Fire Sprinkler Systems - Modification of heads: 56 | |
| TC-DMO-1122-00016 | Issued | 11/22/2022 | 11/14/2023 | BLDG 808 | Demolition Permit | INTERIOR DEMOLITION OF (E) OFFICE AREAS FOR A FUTURE OFFICE RENOVATION. |
| T17FC00955 | Expired | 11/22/2017 | 08/26/2019 | Fire Construction Permit | Fire Alarm & Detection Systems - INSTALL ONE NEW NOTIFIER BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON - NORTH AIRPORT EXPANSION - B921 MULTI PURPOSE BUILDING.; Fire Alarm Systems - New Sq Ft: 262174; Fire Alarm Systems - # New Stories: 2; Additional Inspections: 2 | |
| TF-FCP-1124-00995 | Complete | 11/21/2024 | 06/16/2025 | BLDG 808 | Fire Construction Permit | Building 808 Area B - Add (82) pendent sprinklers. |
| TF-FCP-1125-00985 | Void | 11/20/2025 | N/A | BLDG 847 | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-0624-00455 - INSTALL A NEW SINGLE INTERLOCK PRE-ACTION FIRE SPRINKLER SYSTEM AT THE RAYTHEON TECHNOLOGIES RADIO FREQUENCY SHIELD PROJECT. |
| T19FC00974 | Expired | 11/18/2019 | 08/09/2021 | Fire Construction Permit | Fire Alarm & Detection Systems - BLDG 847 - Installing RP1002 Preaction Control Panel with XTRALIS Air Sampling for Detection; Fire Alarm Systems - New Sq Ft: 1000 | |
| TF-FCP-1124-00970 | Void | 11/15/2024 | N/A | BLDG 808 | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0924-00797 - Install (82) pendent sprinklers |
| DP12-0215 | Complete | 11/15/2012 | 01/12/2014 | Development Package | Restricted Record - SITE/GRADING/SWPPP- RAYTHEON MODULAR DATA CENTER | |
| T16FC00228 | Expired | 11/14/2016 | 06/18/2018 | Fire Construction Permit | Fire Alarm & Detection Systems - Building # 833 - modify the existing fire alarm system for building; Fire Alarm Systems - Devices Modified: 5 | |
| T17FC00930 | Expired | 11/13/2017 | 11/30/2018 | 921 | Fire Construction Permit | Automatic Fire Extingshing Sys - Install New Fire Sprinkler System; Commercial Fire Sprinkler Systems - Underground Fire Line Supply; Additional Inspections: 1 |
| TF-FCP-1124-00960 | Void | 11/12/2024 | N/A | BLDG 808 | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0924-00797 - Add (82) new pendent fire sprinklers. |
| TF-FCP-1124-00951 | Expired | 11/11/2024 | 06/09/2025 | BLDG 805 | Fire Construction Permit | Demo and rework sprinkler system in east area of building for new hardware lab. Extension of existing canopy included. |
| T16FC00222 | Expired | 11/10/2016 | 05/09/2017 | 826 | Fire Construction Permit | Fire Alarm & Detection Systems - addition to exsiting alarm systems; Fire Alarm Systems - Devices Modified: 13 |
| T21CM08808 | Complete | 11/09/2021 | 09/05/2023 | Commercial Building | Office Tenant Improvement | |
| T16FC00215 | Expired | 11/08/2016 | 06/18/2018 | Fire Construction Permit | Fire Alarm & Detection Systems - Modify the existing fire alarm system for Raytheon - 801 IDC Upgrade Phase 1; Fire Alarm Systems - Devices Modified: 2 | |
| T16FC00216 | Expired | 11/08/2016 | 06/18/2018 | 805 | Fire Construction Permit | Fire Alarm & Detection Systems - Modify the existing fire alarm system for Raytheon Building 805LL; Fire Alarm Systems - Devices Modified: 13 |
| T16FC00217 | Expired | 11/08/2016 | 06/18/2018 | Fire Construction Permit | Fire Alarm & Detection Systems - Modify th eexisting fire alarm system for building 864; Fire Alarm Systems - Devices Modified: 4 | |
| T16FC00218 | Expired | 11/08/2016 | 06/18/2018 | 807 | Fire Construction Permit | Fire Alarm & Detection Systems - Modify the existing fire alarm system; Fire Alarm Systems - Devices Modified: 2 |
| T18FC00896 | Expired | 11/06/2018 | 12/12/2019 | Fire Construction Permit | Automatic Fire Extingshing Sys - MODIFY EXISTING WET PIPE FIRE SPRINKLER; Commercial Fire Sprinkler Systems - Modification of heads: 27 | |
| T18FC00884 | Expired | 11/05/2018 | 05/28/2019 | Fire Construction Permit | Fire Alarm & Detection Systems - INSTALL ONE (1) NEW NOTIFIER BUILDING FIRE ALARM SYSTEM FOR RAYTHEON- NORTH AIRPORT EXPANSION- B918, HPC DATA CENTER PHASE 1 & 2; Fire Alarm Systems - New Sq Ft: 15956; Fire Alarm Systems - # New Stories: 1; Additional Plan Reviews: 1 | |
| TF-FCP-1122-00023 | Complete | 11/02/2022 | 12/22/2023 | BLDG 808 | Fire Construction Permit | Add and relocate 702 upright and pendent sprinklers for new floor layout. |
| TC-UTL-1025-00098 | Fees Due | 10/31/2025 | N/A | BLDG 919 | Utilities Permit | RESTRICTED RECORD - This project is for a new development plan on the Raytheon campus for a 26,590 square feet building located northeast of building 848 and a new 85,000 square feet building located west of building 848. |
| T18FC00876 | Expired | 10/29/2018 | 10/29/2019 | Fire Construction Permit | Fire Alarm & Detection Systems - MODIFICATION OF ONE (1) EXISTING BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON MISSLE SYSTEMS- BULDING 841- RESTROOM ADDITION; Fire Alarm Systems - Devices Modified: 3; Additional Plan Reviews: 2; Work Started Without Approved Permit | |
| T99OT00306 | Issued | 10/21/1999 | 06/04/2000 | 847 | Development Package | PARKING LOT |
| T17FC00869 | Expired | 10/19/2017 | 04/23/2018 | Fire Construction Permit | Automatic Fire Extingshing Sys - BLDG 922 - Install 5' stub out for Fire Sprinkler System; Commercial Fire Sprinkler Systems - Underground Fire Line Supply | |
| T18FC00845 | Expired | 10/16/2018 | 10/18/2019 | 841 | Fire Construction Permit | Automatic Fire Extingshing Sys - Add 12 new sprinklers in Bathroom addition; Commercial Fire Sprinkler Systems - Modification of heads: 12 |
| TF-FCP-1025-00906 | Inspections | 10/15/2025 | 05/06/2026 | BLDG 808 | Fire Construction Permit | Remove existing upright sprinklers and add pendent sprinklers for new offices. |
| TC-CFO-1023-00192 | Void | 10/09/2023 | N/A | BLDG 808 | Certificate of Occupancy | VOID-DUPLICATE OF TC-CFO-0623-00086 PLEASE REQUEST EXTENSION UNDER ORIGINAL TCO REQUEST INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREASIN (E) OFFICE AREAS. |
| T18FC00817 | Expired | 10/08/2018 | 07/22/2019 | 920 | Fire Construction Permit | Automatic Fire Extingshing Sys - Installation of new wet automatic fire sprinkler system; Commercial Fire Pumps and Related Equipment - New Pumps: 1 |
| T18FC00820 | Expired | 10/08/2018 | 10/02/2021 | 920 | Fire Construction Permit | Fire Alarm & Detection Systems - Install One New Building Notifier Fire Alarm system For the Raytheon-North Airport Expansion - B920 RF Test Facility; Fire Alarm Systems - New Sq Ft: 119500 |
| T20CM06833 | Issued | 10/02/2020 | 03/11/2023 | Commercial Building | TI: LAB | |
| TF-FCP-0924-00828 | Complete | 09/27/2024 | 04/14/2025 | BLDG 804 | Fire Construction Permit | install four (4) new notifier monitor modules for the new fire alarm risers located in buildings 803A and 804 |
| T18CM07533 | Expired | 09/21/2018 | 04/19/2020 | 921 | Commercial Building | TI: MULTI PURPOSE BUILDING |
| T18CM07555 | Issued | 09/21/2018 | 12/19/2022 | Commercial Building | TI: RCS CHAMBER | |
| TF-FCP-0923-01120 | Void | 09/20/2023 | N/A | BLDG 808 | Fire Construction Permit | VOID-SUBMIT UNDER PERMIT#TF-FCP-0723-00863 - MODIFY AN EXISTING FIRE ALARM SYSTEM. INSTALL A NEW NOTIFIER NFS2-640 TO REPLACE THE EXISTING FIRE ALARM PANEL. CONNECT THE EXISTING CIRCUITS TO THE NEW PANEL |
| TF-FCP-0924-00797 | Complete | 09/18/2024 | 03/30/2025 | BLDG 808 | Fire Construction Permit | Add (36) new pendent fire sprinklers for tenant finish. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 801 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 809 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 810 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 811 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 811T | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 814 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 816 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 817 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 819 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 829 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 830 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 833 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG 837 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG M04 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TZ-PMT-0925-00094 | Issued | 09/16/2025 | 09/28/2026 | BLDG M05 | Zoning Permit Annual | Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them. |
| TF-FCP-0925-00775 | Issued | 09/11/2025 | 04/01/2026 | BLDG 815 | Fire Construction Permit | INSTALL ONE (1) NEW NOTIFIER NFS-320 BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON TECHNOLOGIES - MODULAR STORAGE MAGAZINE. |
| DP17-0217 | Issued | 09/01/2017 | 03/19/2018 | Development Package | GRADING - RAYTHEON NORTH AIRPORT EXPANSION STAGING AREA | |
| TC-CFO-0823-00125 | Void | 08/29/2023 | 10/11/2023 | BLDG 808 | Certificate of Occupancy | VOID-DUPLICATE OF TC-CFO-0623-00086 PLEASE REQUEST AN EXTENSION UNDER THE ORIGINAL TCO REQUEST. RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREASIN (E) OFFICE AREAS. |
| T17FC00706 | Expired | 08/29/2017 | 09/05/2018 | Fire Construction Permit | Automatic Fire Extingshing Sys - BLDG 850 - ANECHOIC Chamber - Install a new Wet Sprinkler System for the Raytheon; Commercial Fire Sprinkler Systems - Modification of heads: 5 | |
| TC-COM-0824-01656 | Complete | 08/23/2024 | 05/13/2026 | BLDG 805 | Commercial Building | The interior scope of work entails interior tenant improvement of 18,625 SF of existing office to be converted to a laboratory use. The laboratory use is for testing and is not a chemical laboratory space with hazardous chemical storage. New laboratory will include testing chambers, small bridge cranes, and other owner supplied equipment. Exterior work includes installation of a LN2 tank, associated concrete pad, and a 780 SF canopy structure. The new canopy is an extension of the existing canopy and will be added at southeast corner of building. |
| T17FC00690 | Expired | 08/22/2017 | 11/27/2018 | Fire Construction Permit | Fire Alarm & Detection Systems - BLDG MO7 -Modify the Existing Fire Alarm System; Fire Alarm Systems - Devices Modified: 13 | |
| TF-FCP-0825-00666 | Complete | 08/18/2025 | 02/20/2026 | BLDG 805 | Fire Construction Permit | EXPEDITE - Add and relocate sprinkler drops for renovated office layout. |
| T22CM06325 | Complete | 08/17/2022 | 08/20/2024 | BLDG 808 | Commercial Building | INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREASIN (E) OFFICE AREAS. |
| TC-COM-0824-01592 | Withdrawn | 08/14/2024 | 02/10/2025 | BLDG 808 | Commercial Building | INTERIOR RENOVATION OF A PORTION OF THE BUILDING TO PROVIDE NEW CONFERENCE ROOMS IN (E) OFFICE AREAS. |
| TF-FCP-0823-00975 | Void | 08/10/2023 | N/A | BLDG 805 | Fire Construction Permit | VOID-SUBMIT UNDER PERMIT#TF-FCP-0823-00949-modify the existing building fire alarm system |
| T17FC00653 | Expired | 08/09/2017 | 08/09/2018 | 850 | Fire Construction Permit | Automatic Fire Extingshing Sys - MODIFY EXISTING FIRE SPRINKLERS TO ACCOMMODATE INTERIOR REMODEL; Commercial Fire Sprinkler Systems - Modification of heads: 11 |
| TF-FCP-0823-00949 | Complete | 08/08/2023 | 08/24/2025 | BLDG 805 | Fire Construction Permit | Modify the existing building fire alarm system |
| TF-FCP-0823-00950 | Expired | 08/08/2023 | 12/24/2024 | BLDG 842 | Fire Construction Permit | Modify one existing notifier building fire alarm system |
| T19FC00610 | Expired | 08/06/2019 | 08/07/2020 | Fire Construction Permit | Automatic Fire Extingshing Sys - Pipe and Sprinkler Systems for Current Raytheon ETF Project | |
| T16BU01112 | Approved | 08/02/2016 | N/A | 807 | Fire Construction Permit | SPRINKLER; relocated heads: 7 |
| TF-FCP-0825-00630 | Complete | 08/01/2025 | 02/14/2026 | BLDG 808 | Fire Construction Permit | MODIFY AN EXISTING NOTIFIER FIRE ALARM SYSTEM FOR RAYTHEON BUILDING 808 - OFFICE CONVERSION INSTALLATION PHASE 3 - AREA "D". |
| TC-CFO-0723-00101 | Void | 07/26/2023 | 09/01/2023 | BLDG 808 | Certificate of Occupancy | VOID-DUPLICATE OF TC-CFO-0623-00086 PLEASE REQUEST EXTENSION UNDER ORIGINAL TCO REQUEST - INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREASIN (E) OFFICE AREAS. |
| TF-FCP-0723-00863 | Complete | 07/18/2023 | 05/01/2024 | BLDG 808 | Fire Construction Permit | MODIFY AN EXISTING FIRE ALARM SYSTEM. INSTALL A NEW NOTIFIER NFS2-640 TO REPLACE THE EXISTING FIRE ALARM PANEL. CONNECT THE EXISTING CIRCUITS TO THE NEW PANEL |
| TF-FCP-0723-00864 | Expired | 07/18/2023 | 02/10/2024 | BLDG 815 | Fire Construction Permit | INSTALL ONE (1) NEW NOTIFIER NFS-320 BUILDING FIRE ALARM SYSTEM |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. | |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 800 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 802 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 803 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 804 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 805 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 806 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 807 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 808 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 840 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 841 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 842 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 843 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 844 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 845 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 847 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 847A | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 848 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 850 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 917 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 918 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 919 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 920 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 921 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG 930 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG M01 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG M02 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | BLDG M06 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | UNIT 807H1 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00068 | Void | 07/14/2025 | N/A | UNIT 842M1 | Zoning Permit Annual | **REFER TO TZ-PMT-0725-00069** Installation and Operation of Temporary Concrete Batch for the construction of new runway at Tucson International Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. | |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 800 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 802 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 803 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 804 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 805 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 806 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 807 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 808 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 840 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 841 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 842 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 843 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 844 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 845 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 847 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 847A | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 848 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 850 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 917 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 918 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 919 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 920 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 921 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG 930 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG M01 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG M02 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | BLDG M06 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | UNIT 807H1 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| TZ-PMT-0725-00069 | Issued | 07/14/2025 | 07/18/2026 | UNIT 842M1 | Zoning Permit Annual | Site is currently an open field. Will grade the area and install a temporary portable concrete batch plant needed to complete construction of a new Runway for the Tucson Airport. |
| T22FC00465 | Expired | 07/13/2022 | 09/08/2023 | 804 | Fire Construction Permit | Fire Alarm & Detection Systems - INSTALL A NEW NOTIFIER NFS-320 BUILDING FIRE ALARM SYSTEM.; Fire Alarm Systems - New Sq Ft: 3890; Fire Alarm Systems - # New Stories: 1 |
| TF-FCP-0725-00528 | Issued | 07/01/2025 | 01/24/2026 | BLDG 808 | Fire Construction Permit | MODIFY AN EXISTING NOTIFIER FIRE ALARM SYSTEM FOR RAYTHEON BUILDING 808 - OFFICE CONVERSION INSTALLATION PHASE 3 - AREA "C". |
| TF-FCP-0725-00532 | Issued | 07/01/2025 | 02/04/2026 | BLDG 808 | Fire Construction Permit | Fire Sprinkler TI Area C |
| TD-DEV-0625-00172 | Approved - Awaiting Customer Attention | 06/30/2025 | N/A | BLDG 919 | Development Package | RESTRICTED RECORD - This project is for a new development plan on the Raytheon campus for a 26,590 square feet building located northeast of building 848 and a new 85,000 square feet building located west of building 848. |
| TF-FCP-0625-00496 | Complete | 06/23/2025 | 02/04/2026 | BLDG 805 | Fire Construction Permit | Install preaction fire system in chamber. |
| T21FC00510 | Expired | 06/23/2021 | 07/15/2022 | Fire Construction Permit | Fire Alarm & Detection Systems - Modify One (1) Existing Notifier Building Fire Alarm System for The Raytheon -North Airport Expansion - B927, Thermal Spray Lab.; Fire Alarm Systems - Devices Modified: 1 | |
| TF-FCP-0623-00794 | Complete | 06/21/2023 | 04/04/2024 | BLDG 808 | Fire Construction Permit | Add and relocate 563 uprights and pendents for tenant improvement. |
| T18FC00525 | Expired | 06/21/2018 | 06/22/2019 | Fire Construction Permit | Automatic Fire Extingshing Sys - INSTALL NEW FIRE PROTECTION SYSTEM | |
| DP17-0146 | Complete | 06/21/2017 | 10/29/2018 | Development Package | SITE/GRADING - Raytheon Building 845 Hanger AdditionOriginal Approval 9/08/2017 Revision #1 | |
| TC-CFO-0623-00086 | Issued | 06/20/2023 | 10/11/2023 | BLDG 808 | Certificate of Occupancy | INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREASIN (E) OFFICE AREAS. |
| T22FC00415 | Complete | 06/20/2022 | 07/15/2023 | Fire Construction Permit | Fire Alarm & Detection Systems - NE (1) EXISTING NOTIFIER BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON -NORTHAIRPORT EXPANSION - B918, DATA CENTER - IT ROOM 7 A0200.; Fire Alarm Systems - Devices Modified: 6 | |
| T22FC00416 | Expired | 06/20/2022 | 07/20/2023 | Fire Construction Permit | Fire Alarm & Detection Systems - MODIFY AN EXISTING NOTIFIER BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEONTECHNOLOGIES - BUILDING 807 SECURE CONFERENCE ROOM.; Fire Alarm Systems - Devices Modified: 4 | |
| T18FC00513 | Expired | 06/18/2018 | 02/19/2019 | Fire Construction Permit | Automatic Fire Extingshing Sys - REPLACE EXISTING FIRE PUMP WITH NEW FIRE PUMP.; Commercial Fire Pumps and Related Equipment - NO Testing | |
| TF-FCP-0624-00461 | Expired | 06/17/2024 | 07/30/2025 | BLDG 847 | Fire Construction Permit | Add/relocate 50 +/- pendent sprinklers per tenant finish plan. |
| TF-FCP-0624-00454 | Void | 06/13/2024 | N/A | BLDG 805 | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-00949 and Attach COT Business License - modify existing building fire alarm system |
| TF-FCP-0624-00455 | Needs Resubmittal | 06/13/2024 | 04/29/2026 | BLDG 847 | Fire Construction Permit | modify existing building fire alarm system |
| TF-FCP-0624-00456 | Void | 06/13/2024 | N/A | BLDG 842 | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-00950 and Attach COT Business License - modify existing building fire alarm system |
| TC-CFO-0523-00074 | Denied | 05/31/2023 | N/A | 808 | Certificate of Occupancy | This project will need the okay for TCO from an inspector in fire and the level of TCO. We also need The Water Chlorantion report approval. Please re-request once you get the okay for TCO from the fire inspector and The Water Chlorantion report approval. - INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS. |
| DP18-0130 | Complete | 05/31/2018 | 08/10/2020 | Development Package | E SITE/GRADE/SWPPP - Raytheon Environmental Test Facility, Bldg. 930 (phase 1) | |
| T18FC00459 | Expired | 05/31/2018 | 05/28/2019 | 918 | Fire Construction Permit | Automatic Fire Extingshing Sys - INSTALLATION OF A NEW WET AUTOMATIC FIRE SPRINKLER SYSTEM.; Commercial Fire Sprinkler Systems - Underground Fire Line Supply; Additional Plan Reviews: 1 |
| T22CM04014 | Complete | 05/25/2022 | 08/28/2024 | BLDG 808 | Commercial Building | Interior only Demolition Package Phase 1 for Building 808 |
| T18FC00425 | Expired | 05/22/2018 | 05/25/2019 | 920 | Fire Construction Permit | Automatic Fire Extingshing Sys - Installation of a New Wet Automatic Fire Speinkler System; Commercial Fire Pumps and Related Equipment - New Pumps: 1 |
| DP18-0109 | Issued | 05/08/2018 | 12/29/2018 | Development Package | SITE/GRADE- RAYTHEON OVERFLOW PARKING | |
| TF-FCP-0525-00360 | Issued | 05/07/2025 | 12/02/2025 | Fire Construction Permit | 927 Range Chamber- REPLACE (5) FIVE EXISTING VESDA VLC DETECTORS WITH NEW VESDA VEU DETECTORS. THE PIPING AND SAMPLING PORTS ARE TO REMAIN UNCHANGED. THE EXISTING FIKE CHEETAH Xi MONITOR MODULES WILL BE RECONNECTED TO THE NEW DETECTORS FOR CONTROL PANEL ACTIVATION. | |
| T21FC00359 | Expired | 05/07/2021 | 05/28/2022 | 807 | Fire Construction Permit | Fire Alarm & Detection Systems - MODIFY AN EXISTING NOTIFIER BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON TECHNOLOGIES - BUILDING 807 MODERNIZATION PHASE III.; Fire Alarm Systems - New Sq Ft: 67738; Fire Alarm Systems - # New Stories: 1 |
| T19FC00342 | Complete | 05/06/2019 | 03/18/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - ANECHOIC CHAMBER; Special Hazard - New System: 1; Fire Alarm Systems - Devices Modified: 15; Additional Plan Reviews: 2; Additional Inspections: 17 | |
| T21FC00320 | Expired | 05/04/2021 | 05/14/2022 | Fire Construction Permit | Automatic Fire Extingshing Sys - Modify Fire Sprinkler system to accommodate existing system; Commercial Fire Sprinkler Systems - Modification of heads: 3 | |
| TF-FCP-0523-00641 | Expired | 05/01/2023 | 12/26/2023 | Fire Construction Permit | INSTALL ONE (1) NEW NOTIFIER NFS2-3030 FIRE ALARM/MASS NOTIFICATION SYSTEM | |
| TR-ROW-0425-00556 | Inspections | 04/28/2025 | 06/11/2025 | BLDG 800 | Right-of-Way (ROW) | PJW301 CAPITAL PROJECT , TUCSON WATERLINE POTHOLING FOR UTILITY DESIGN AND DISCOVERY |
| DP18-0099 | Approved | 04/26/2018 | N/A | 841 | Development Package | SITE |
| T22CM03058 | Issued | 04/25/2022 | 06/05/2024 | 804 | Commercial Building | Remodeling of existing building and adding new single use restroom |
| TC-COM-0423-01131 | Complete | 04/24/2023 | 08/28/2024 | BLDG 808 | Commercial Building | INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS. |
| T18FC00330 | Expired | 04/17/2018 | 04/19/2019 | 845 | Fire Construction Permit | Automatic Fire Extingshing Sys - Modification/Addition of 16 Heads for Raytheon 845 Hangar D addition; Commercial Fire Sprinkler Systems - Modification of heads: 16 |
| T19CM02703 | Canceled | 04/16/2019 | N/A | 920 | Commercial Building | TI: CHAMBER |
| TF-FCP-0425-00316 | Void | 04/15/2025 | N/A | BLDG 847 | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-0624-00455 - MODIFY ONE (1) EXISTING NOTIFIER BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON - BUILDING 847 AREA 108 & 204 REMODEL. |
| T22OT00270 | Issued | 04/14/2022 | 12/31/2022 | Registered Facility | Registered Plant - Factory Rearrangements and Office Remodeling | |
| TC-REG-0323-00007 | Complete | 03/28/2023 | 12/31/2023 | BLDG M05 | Registered Facility | Factory Rearrangements and office remodeling |
| T21FC00231 | Expired | 03/26/2021 | 04/09/2022 | 847 | Fire Construction Permit | Automatic Fire Extingshing Sys - Modify existing wet pipe fire sprinkler system; Commercial Fire Sprinkler Systems - Modification of heads: 36 |
| TF-FOP-0323-00701 | Complete | 03/20/2023 | 04/07/2023 | BLDG 845 | Fire Operational Permit | 4-4-23 Raytheon 40' x 50' Canopy 249831 |
| TF-FCP-0325-00231 | Void | 03/19/2025 | N/A | BLDG 805 | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-00949 - Modify the existing building fire alarm system |
| TF-FCP-0325-00220 | Void | 03/14/2025 | N/A | BLDG 805 | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-00949 - MODIFY AN EXISTING NOTIFIER FIRE ALARM SYSTEM FOR THE RAYTHEON - NEW HARDWARE LAB 805 |
| DP17-0052 | Complete | 03/13/2017 | 12/15/2019 | Development Package | DEV PKG- SITE/GRADING/SWPPP- NORTH AIRPORT EXPANSION1st Revision approved 12/04/17 (page 1-4, 8- | |
| T17OT00269 | Expired | 03/13/2017 | 12/31/2017 | Registered Facility | REGISTERED PLANT | |
| T20OT00225 | Expired | 03/11/2020 | 12/31/2020 | Registered Facility | REGISTERED PLANT - RAYTHEON | |
| T22FC00179 | Expired | 03/08/2022 | 05/03/2023 | Fire Construction Permit | Fire Alarm & Detection Systems - Modify One (1) Existing Notifier Building Fire Alarm System for The Raytheon - North Airport Expansion - B840 - Anechoic Chamber Vesda Detection.; Special Hazard - New System: 1 | |
| T22FC00180 | Expired | 03/08/2022 | 05/03/2023 | Fire Construction Permit | Fire Alarm & Detection Systems - Modify One (1) Existing Notifier Building Fire Alarm System for The Raytheon -North Airport Expansion - B947 Test Chamber Monitoring.; Fire Alarm Systems - Devices Modified: 2 | |
| T22FC00181 | Expired | 03/08/2022 | 05/03/2023 | Fire Construction Permit | Fire Alarm & Detection Systems - Modify One (1) Existing Notifier Building Fire Alarm System for The Raytheon - North Airport Expansion - B833 - Roof Notification.; Fire Alarm Systems - Devices Modified: 9 | |
| TF-FCP-0325-00173 | Void | 03/03/2025 | N/A | BLDG 801 | Fire Construction Permit | VOID - Per Jack Taylor with Kazal Fire - Add and relocate pendent sprinklers for remodel of existing areas. |
| T21OT00157 | Expired | 03/03/2021 | 12/31/2021 | Registered Facility | Registered Plant - Factory rearrangements and Office Remodels | |
| TF-FCP-0223-00430 | Complete | 02/28/2023 | N/A | BLDG 804 | Fire Construction Permit | Demo and rework existing sprinkler system for damaged piping. Add new uprights and pendents throughout space. |
| TF-FCP-0225-00156 | Void | 02/25/2025 | N/A | BLDG 808 | Fire Construction Permit | VOID - Submitted already under Permit#TF-FCP-0225-00119 - Remove existing upright protection and add pendents in remodeled conference room areas. |
| TC-REG-0224-00001 | Issued | 02/23/2024 | 06/10/2025 | BLDG M05 | Registered Facility | Factory and offices Rearrangements |
| TC-COM-0223-00691 | Void | 02/22/2023 | N/A | BLDG M05 | Commercial Building | WRONG PERMIT TYPE Raytheon Technologies 2022 Registered Plant annual Permit |
| T19OT00176 | Expired | 02/22/2019 | 12/31/2019 | Registered Facility | REGISTERED PLANT | |
| T18OT00195 | Expired | 02/15/2018 | 12/31/2018 | Registered Facility | REGISTERED PLANT | |
| TC-CFO-0224-00049 | Complete | 02/12/2024 | 03/14/2024 | BLDG 808 | Certificate of Occupancy | Full C of O issued -INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS. |
| TC-CFO-0224-00050 | Void | 02/12/2024 | N/A | BLDG 808 | Certificate of Occupancy | VOID-DUPLICATE OF TC-CFO-0623-00086 PLEASE REQUEST EXTENSION UNDER ORIGINAL TCO REQUEST INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREASIN (E) OFFICE AREAS. |
| TF-FCP-0225-00119 | Inspections | 02/05/2025 | 12/10/2025 | BLDG 808 | Fire Construction Permit | Remove existing upright sprinklers and add pendents using existing outlets. |
| TC-CFO-0224-00043 | Denied | 02/05/2024 | N/A | BLDG 808 | Certificate of Occupancy | This project needs the okay for a Temporary Certificate of Occupancy from an Engineering Inspector and the Temporary Certificate of Occupancy (TCO) level for the building. Please re-request TCO INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS. |
| T21FC00083 | Expired | 02/03/2021 | 11/02/2021 | Fire Construction Permit | Automatic Fire Extingshing Sys - Badging Center - Install New Fire Sprinkler System | |
| TC-REG-0225-00006 | Issued | 02/01/2025 | 04/01/2026 | BLDG M05 | Registered Facility | Tenant Improvement for offices, labs and manufacturer spaces |
| TF-FCP-0125-00087 | Complete | 01/29/2025 | 08/11/2025 | BLDG 808 | Fire Construction Permit | MODIFY AN EXISTING NOTIFIER FIRE ALARM SYSTEM FOR RAYTHEON BUILDING 808 - OFFICE CONVERSION INSTALLATION PHASE 3 - AREA "A". |
| TF-FCP-0125-00088 | Complete | 01/29/2025 | 08/11/2025 | BLDG 808 | Fire Construction Permit | MODIFY AN EXISTING NOTIFIER FIRE ALARM SYSTEM FOR RAYTHEON BUILDING 808 - OFFICE CONVERSION INSTALLATION PHASE 3 - AREA "B" |
| TF-FCP-0125-00084 | Complete | 01/28/2025 | 02/11/2026 | BLDG 808 | Fire Construction Permit | MODIFY AN EXISTING NOTIFIER FIRE ALARM SYSTEM FOR RAYTHEON BUILDING 808 - OFFICE CONVERSION INSTALLATION PHASE 3 - AREA "E". |
| T22FC00066 | Expired | 01/27/2022 | 10/21/2022 | Fire Construction Permit | Fire Alarm & Detection Systems - Modify one (1) existing Notifier Building Fire Alarm System.; Fire Alarm Systems - New Sq Ft: 52000; Fire Alarm Systems - # New Stories: 1 | |
| T18FC00085 | Expired | 01/26/2018 | 04/28/2019 | 920 | Fire Construction Permit | Automatic Fire Extingshing Sys - Installation of New Wet Automatic Fire Sprinkler System; Commercial Fire Pumps and Related Equipment - New Pumps: 1 |
| DP16-0015 | Complete | 01/22/2016 | 04/22/2017 | Development Package | SITE/GRADING | |
| D10-0002 | Complete | 01/21/2010 | N/A | Development Package | RAYTHEON BUILDING 844 | |
| T22FC00047 | Expired | 01/18/2022 | 05/03/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - BLDG 928 - Modify exsisting fire sprinklers to accommodate new wall ans ceiling configuration.; Commercial Fire Sprinkler Systems - Modification of heads: 10 | |
| TF-FCP-0124-00036 | Void | 01/16/2024 | N/A | Fire Construction Permit | VOID-Submitted by someone else per Erika Castillo @ Orr Protection Systems - PROVIDE PHOTOELECTRIC DETECTOR FOR ANECHOIC CHAMBER. DETECTOR TO BE MONITORED VIA TOTAL-PAC SPRINKLER SYSTEM. · PROVIDE ALARM HORN/STROBE FOR PRE-ACTION SYSTEM ACTIVATION NOTIFICATION. · PROVIDE AUXILIARY RELAY FOR EQUIPMENT SHUTDOWN. · TOTAL-PAC PRE-ACTION SPRINKLER ASSEMBLY PANEL TO PROVIDE CONTACTS FOR ALARM, TROUBLE, WATERFLOW AND SUPERVISORY SIGNALS TO BUILDING ALARM PANEL. | |
| TF-FCP-0125-00034 | Void | 01/15/2025 | N/A | BLDG 805 | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-0823-0094 - MODIFY AN EXISTING NOTIFIER FIRE ALARM SYSTEM FOR THE RAYTHEON - NEW HARDWARE LAB 805. |
| TC-CFO-0124-00022 | Denied | 01/15/2024 | N/A | BLDG 808 | Certificate of Occupancy | 1/23/24 This project needs the okay for a Temporary Certificate of Occupancy from an Engineering Inspector and the Temporary Certificate of Occupancy (TCO) level for the building. Please re-request TCO This project needs the okay for a Temporary Certificate of Occupancy from a Fire and Engineering Inspector and the Temporary Certificate of Occupancy (TCO) level for the building. Please re-request TCO INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS. |
| T20FC00024 | Expired | 01/15/2020 | 07/20/2020 | 920 | Fire Construction Permit | Automatic Fire Extingshing Sys - Modify Existing Wet Pipe Fire Sprinkler System - Add 28; Commercial Fire Sprinkler Systems - Modification of heads: 28 |
| TF-FCP-0125-00030 | Expired | 01/14/2025 | 08/04/2025 | BLDG 809 | Fire Construction Permit | Extend existing main into existing exterior canopy area for new clean room equipment transfer room. Add 6 sprinklers. |
| T20CM00268 | Expired | 01/14/2020 | 07/27/2020 | 920 | Commercial Building | ELECTRICAL ONLY FOR FUTURE CHAMBER |
| TF-FCP-0124-00021 | Expired | 01/09/2024 | 07/17/2024 | BLDG 845 | Fire Construction Permit | Extend existing sprinkler system to protect expanded room. |
| TF-FCP-0124-00008 | Expired | 01/03/2024 | 07/18/2024 | BLDG 845 | Fire Construction Permit | MODIFY AN EXISTING NOTIFIER NFS-320 BUILDING FIRE ALARM SYSTEM |
| TF-FCP-0123-00247 | Expired | 01/03/2023 | 12/13/2023 | BLDG 848 | Fire Construction Permit | Remove existing sprinkler drops and add 30 upright sprinklers. |
| T00BU00064 | EXPIRED | 01/11/2000 | 07/11/2000 | #842 | SPKLR | FIRE SPKR:NEW 404 |
| T00BU00479 | FINAL | 02/14/2000 | 11/22/2000 | #845 | SPKLR | FIRE SPKR:ADD 795 |
| T00BU00958 | WITHDRWN | 03/30/2000 | N/A | #842 | BUILD | FIRE DETECTION AND ALARM SYSTEM |
| T00CM00537 | C OF O | 02/04/2000 | 12/27/2000 | #845 | COMBO | HANGER |
| T00CM06224 | C OF O | 12/29/2000 | 02/04/2002 | #842 | COMBO | ADDITION:PREFAB BUILDING |
| T00PL00477 | WITHDRWN | 02/28/2000 | N/A | #844 | PLUMB | SEWER:PRIVATE |
| T01BU00100 | CLOSED | 01/17/2001 | 07/16/2001 | DEMO | DEMOLITION:DOCK,WALKWAY,ASPHALT | |
| T01BU00254 | FINAL | 02/01/2001 | 12/03/2001 | #842 | SPKLR | FIRE:SPKR:39 NEW |
| T01BU03506 | EXPIRED | 12/14/2001 | 06/12/2002 | #805 | SPKLR | FIRE SPRINKLERS:RELOCATE 5 ADD 4 |
| T01CM00297 | FINAL | 01/18/2001 | 12/10/2001 | #842 | COMBO | TI:DEFERRED SUBMITTAL-- RAYTHEON MECHANICAL/PLUMBING/ELECTRICAL |
| T01CM04824 | C OF O | 09/27/2001 | 10/14/2002 | COMBO | TESTING FACILITY FOR RESEARCH AND DESIGN | |
| T01CM05815 | CLOSED | 11/29/2001 | 06/21/2009 | COMBO | METAL CANOPY | |
| T02BU00321 | FINAL | 01/31/2002 | 11/12/2002 | #842 | SPKLR | FIRE SPKR:ADD 110LF OF 4' PIPE & 18 NEW |
| T02BU00624 | FINAL | 02/26/2002 | 10/06/2002 | SPKLR | FIRE SPKR:ADD 43 & INSTALL 100LF OF 4" PIPE | |
| T02CM00023 | CLOSED | 01/03/2002 | 06/21/2009 | COMBO | ADDITION:CANOPY | |
| T02CM05881 | WITHDRWN | 12/23/2002 | N/A | #MO2 | COMBO | ADDITION:DECK WITH CANOPY |
| T02OT00006 | CLOSED | 01/03/2002 | 12/31/2002 | REGPLANT | REGISTERED PLANT | |
| T03BU00077 | FINAL | 01/10/2003 | 07/05/2005 | GRADING | GRADING:6000CY CUT & 26600 CY FILL | |
| T03BU00526 | FINAL | 02/26/2003 | 12/17/2003 | #848 | SPKLR | FIRE SPRINKLER:1665'-12" UNDERGROUND PIPE |
| T03BU01081 | FINAL | 05/01/2003 | 12/15/2003 | BUILD | ADDITION:CANOPY | |
| T03BU01308 | FINAL | 05/27/2003 | 02/16/2004 | SPKLR | FIRE SPKR:ADD 2429 | |
| T03BU02173 | FINAL | 08/20/2003 | 02/25/2004 | #848 | BUILD | FIRE SYSTEM: |
| T03BU02320 | FINAL | 09/10/2003 | 11/02/2004 | #847 | SPKLR | FIRE:SPKR ADD 15 |
| T03BU02321 | FINAL | 09/10/2003 | 11/02/2004 | #848 | SPKLR | FIRE:SPKR ADD 16 |
| T03BU02421 | CLOSED | 09/19/2003 | 11/17/2004 | GRADING | GRADING:1900 CY CUT/1800 CY FILL | |
| T03CM00220 | FINAL | 01/17/2003 | 02/18/2004 | COMBO | OFFICE BLDG:NEW | |
| T03CM00674 | FINAL | 02/06/2003 | 12/16/2003 | COMBO | FOUNDATION ONLY | |
| T03CM01542 | C OF O | 03/27/2003 | 02/18/2004 | COMBO | TI:TAA AIRPORT | |
| T03CM01914 | C OF O | 04/18/2003 | 03/07/2004 | #848 | COMBO | ADDITION:KITCHEN SERVING AREA |
| T03CM02119 | FINAL | 05/01/2003 | 02/18/2004 | COMBO | INSTALL:FURNITURE | |
| T03CM02612 | C OF O | 05/29/2003 | 11/08/2004 | COMBO | TUNNEL CONNECTION OF TWO BUILDINGS | |
| T03CM04697 | FINAL | 09/29/2003 | 08/04/2004 | COMBO | NEW BRIDGE | |
| T03OT00205 | CLOSED | 02/07/2003 | 12/31/2003 | REGPLANT | REGISTERED PLANT | |
| T03OT02000 | EXPIRED | 11/12/2003 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
| T03PL00372 | FINAL | 02/25/2003 | 12/14/2003 | #848 | PLUMB | INSTALL:NEW WATER LINE |
| T04BU02844 | FINAL | 11/19/2004 | 01/30/2006 | #807H1 | SPKLR | FIRE SPRK: ADD 70 RELOCATE 64 |
| T04CM03056 | C OF O | 07/02/2004 | 07/24/2005 | COMBO | ADDITION:ELEVATOR BUILDING | |
| T04CM03582 | EXPIRED | 08/03/2004 | 07/24/2005 | #843 | COMBO | ADDITION:200 SQ FT FOR HYDRO PUMP |
| T04CM04001 | EXPIRED | 09/01/2004 | 03/29/2005 | #807H1 | COMBO | TI:PARTIAL INTERIOR DEMO - DEQ # NOT NEEDED |
| T04CM04336 | WITHDRWN | 09/28/2004 | N/A | #806 | COMBO | NEW:CAFETERIA |
| T04CM04337 | FINAL | 09/28/2004 | 05/21/2005 | #807H1 | COMBO | REMODEL:LOBBY |
| T04CM05419 | C OF O | 12/15/2004 | 12/03/2006 | #847 | COMBO | ADDITION:STORAGE:HIL CHAMBER |
| T04OT00415 | CLOSED | 03/01/2004 | 12/31/2004 | REGPLANT | REGISTERED PLANT | |
| T05BU00223 | EXPIRED | 02/02/2005 | 08/01/2005 | #805 | SPKLR | FIRE SPRINKLER:ADD 7 |
| T05BU00373 | WITHDRWN | 02/18/2005 | N/A | #806 | GRADING | GRADING: 100CY CUT 1100 CY FILL |
| T05BU00436 | FINAL | 02/24/2005 | 08/30/2005 | #843 | SPKLR | FIRE SPKR:ADD 2 |
| T05BU01454 | CLOSED | 06/08/2005 | 07/15/2009 | #808 | SPKLR | SPRINKLER:RELOCATE & ADD |
| T05BU01692 | SI_XPIRE | 07/05/2005 | 09/05/2007 | GRADING | GRADING | |
| T05CM00171 | C OF O | 01/13/2005 | 11/20/2006 | #850 | COMBO | NEW BARRELL STORAGE BLDG |
| T05CM03316 | CLOSED | 07/05/2005 | 06/21/2009 | #800 | COMBO | FOUNDATION AND UNDERGROUND PLUMBING |
| T05CM04146 | C OF O | 08/08/2005 | 08/12/2007 | #800 | COMBO | ADDITION: CAFETERIA |
| T05OT00468 | CLOSED | 03/04/2005 | 12/31/2005 | REGPLANT | REGISTERED PLANT | |
| T06BU00068 | FINAL | 01/11/2006 | 08/07/2007 | 800 | SPKLR | FIRE SPRK:138 NEW SPRINKLERS |
| T06BU00914 | CLOSED | 04/17/2006 | 10/14/2006 | SPKLR | FIRE SPKL: ADD 6 NEW AND RELOCATE 33 | |
| T06BU01249 | FINAL | 05/23/2006 | 11/27/2006 | BUILD | FIRE ALARM SYSTEM | |
| T06BU02540 | CLOSED | 10/23/2006 | 07/15/2009 | #808 | SPKLR | 3 NEW SPRINKLER HEADS 3 RELOCATE SPRINKLER HEAD |
| T06OT00794 | CLOSED | 03/20/2006 | 12/31/2006 | REGPLANT | REG PLANT 1,992,515 SQ FT | |
| T07BU00229 | WITHDRWN | 01/29/2007 | N/A | 800 | SPKLR | INSTALL HOOD SYSTEMS |
| T07BU00230 | FINAL | 01/29/2007 | 08/12/2007 | 800 | BUILD | INSTALL:3 HOODS |
| T07BU00231 | WITHDRWN | 01/29/2007 | N/A | BUILD | INST 3 HOOD SYSTEM | |
| T07BU02164 | FINAL | 10/11/2007 | 08/18/2008 | SPKLR | FIRE SPRINKLERS | |
| T07OT00905 | WITHDRWN | 04/18/2007 | N/A | REGPLANT | REG PLANT | |
| T08BU00100 | FINAL | 01/22/2008 | 10/29/2008 | 800 | BUILD | KITCHEN EXHAUST HOOD FIRE EXTINGUISHING SYSTEM |
| T08BU01836 | CLOSED | 10/14/2008 | 10/24/2009 | SPKLR | ADD 3 FIRE SPRINKLERS | |
| T08CM03630 | FINAL | 11/10/2008 | 09/02/2009 | COMBO | ADDITION:CANOPY | |
| T09BU00198 | FINAL | 02/10/2009 | 04/13/2011 | GRADSWPP | GRADING FOR NEW MANUFACTORING BUILDING Raytheon Low Frequnecy Chamber | |
| T09BU00268 | EXPIRED | 02/24/2009 | 08/30/2009 | SPKLR | Install 24 fire sprinkler heads. | |
| T09BU00287 | EXPIRED | 02/25/2009 | 08/30/2009 | #845 | SPKLR | FIRE SPRINKLER |
| T09BU00786 | FINAL | 06/01/2009 | 03/29/2011 | #850 | SPKLR | SPRINKLERS |
| T09BU00892 | FINAL | 06/19/2009 | 02/09/2010 | #850 | BUILD | U/G PIPING & 2 HYDRANTS |
| T09BU00943 | FINAL | 06/26/2009 | 08/30/2010 | SPKLR | ADD 79, RELOCATE 228 FIRE SPRINKLERS. | |
| T09BU01462 | FINAL | 09/29/2009 | 12/13/2010 | #805 | SPKLR | ADD 47 AND RELOACTE 307 FIRE SPRINKLER HEADS |
| T09BU01483 | FINAL | 10/01/2009 | 08/30/2010 | SPKLR | SPRINKLERS | |
| T09BU01582 | FINAL | 10/22/2009 | 05/18/2011 | #808 | SPKLR | Add 10, relocate 19 fire sprinklers |
| T09BU01618 | FINAL | 10/29/2009 | 04/27/2010 | TEMP-FBB | TEMP CONSTRUCTION TRAILER | |
| T09BU01664 | FINAL | 11/09/2009 | 06/15/2011 | #805 | BUILD | FIRE ALARM |
| T09BU01712 | EXPIRED | 11/16/2009 | 05/31/2010 | SPKLR | RELOCATE 40 AND ADD 23 FIRE SPRINKLER HEADS. | |
| T09BU01724 | CLOSED | 11/18/2009 | 05/17/2010 | TENTS | 30 X 50 CANOPY | |
| T09BU01750 | FINAL | 11/23/2009 | 12/12/2010 | #805 | SPKLR | Add 13, relocate 279 fire sprinklers |
| T09BU01785 | FINAL | 12/03/2009 | 08/25/2010 | #848 | BUILD | FIRE ALARM SYSTEM |
| T09BU01823 | FINAL | 12/14/2009 | 07/21/2010 | #847 | BUILD | FIRE ALARM |
| T09BU01842 | FINAL | 12/16/2009 | 09/04/2010 | TENTS | 30'X50' CANOPY | |
| T09BU01882 | EXPIRED | 12/24/2009 | 06/27/2010 | BUILD | FIRE ALARM | |
| T09BU01885 | EXPIRED | 12/24/2009 | 06/27/2010 | #807H1 | BUILD | MODIFICATIONS TO EXISTING FIRE ALARM |
| T09CM00308 | C OF O | 02/10/2009 | 04/12/2011 | #850 | COMBO | NEW: RAYTHEON METAL BUILDING, LOW FREQUENCY CHAMBER |
| T09CM01053 | C OF O | 04/29/2009 | 01/30/2011 | #848 | COMBO | TI:OFFICE/LAB SPACES & WALL:PATIO 58 LF OF 10' HIGH |
| T09CM01653 | C OF O | 06/26/2009 | 06/15/2011 | #805 | COMBO | TI: OFFICE |
| T09CM02282 | C OF O | 08/26/2009 | 07/31/2010 | #847 | COMBO | TI: LAB/OFFICE |
| T09CM02422 | C OF O | 09/09/2009 | 12/26/2010 | #848 | COMBO | TI: RAYTHEON BLDG 848 - UPPER LEVEL |
| T09OT01580 | FINAL | 07/29/2009 | 01/25/2010 | REGPLANT | REGISTERED PLANT | |
| T09PL00950 | FINAL | 06/01/2009 | 04/18/2011 | #850 | PLUMB | PRIVATE SEWER |
| T10AN00017 | ISSUED | 01/12/2010 | N/A | #844 | ADDRNEW | |
| T10BU00008 | FINAL | 01/05/2010 | 07/19/2010 | #847 | SPKLR | Install 30 new and relocate 24 fire sprinklers. |
| T10BU00110 | FINAL | 01/21/2010 | 12/11/2011 | GRADSWPP | GRADING: | |
| T10BU00265 | CLOSED | 02/11/2010 | 09/04/2010 | TENTS | 164' x 295' TENT WITH GENERATORS FOR POWER | |
| T10BU00266 | FINAL | 02/11/2010 | 09/04/2010 | TENTS | 50' x 180' CANOPY | |
| T10BU00303 | FINAL | 02/18/2010 | 07/26/2011 | #805 | SPKLR | Add 13, relocate 222 |
| T10BU00327 | FINAL | 02/23/2010 | 03/28/2011 | #850 | BUILD | FIRE ALARM SYSTEM |
| T10BU00525 | FINAL | 04/05/2010 | 10/05/2010 | TENTS | ONE 60' x 90' CANOPY | |
| T10BU00742 | FINAL | 05/06/2010 | 11/19/2012 | #850 | SPKLR | Install ECARO 25 clean agent suppression system (with alarms) |
| T10BU00974 | FINAL | 06/17/2010 | 02/23/2011 | #805 | SPKLR | Add 19, relocate 120 fire sprinklers |
| T10BU01344 | EXPIRED | 08/25/2010 | 02/21/2011 | SPKLR | Add 4, relocate 13 fire sprinklers | |
| T10BU01383 | EXPIRED | 08/31/2010 | 02/28/2011 | SPKLR | Add 18 fire sprinklers | |
| T10BU01590 | FINAL | 10/15/2010 | 06/15/2011 | #805 | SPKLR | Add 5, relocate 268 fire sprinklers |
| T10BU01651 | EXPIRED | 11/01/2010 | 05/16/2011 | SPKLR | INSTALL 2 NEW FIRE SPRINKLER HEADS. | |
| T10BU01682 | CLOSED | 11/08/2010 | 05/08/2011 | #845 | TENTS | INSTALL:40'X50' CANOPY |
| T10BU01805 | CLOSED | 12/08/2010 | 06/06/2011 | TENTS | TEMP TENT 40' X 60' | |
| T10BU01892 | EXPIRED | 12/21/2010 | 06/26/2011 | SPKLR | INSTALL 5 NEW AUTOMATIC FIRE SPRINKLERS. | |
| T10CM00312 | WITHDRWN | 02/11/2010 | N/A | COMBO | 164' x 295' TENT WITH GENERATORS FOR POWER | |
| T10CM02768 | C OF O | 10/04/2010 | 11/29/2011 | #844 | COMBO | ADDITION & TI:WORK OUT FACILITY |
| T10OT00879 | WITHDRWN | 04/22/2010 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
| T10OT01485 | FINAL | 07/12/2010 | 12/31/2011 | REGPLANT | REGISTERED PLANT | |
| T11BU00128 | FINAL | 01/27/2011 | 08/01/2011 | TENTS | TENT; 600SQ FT | |
| T11BU00254 | FINAL | 02/24/2011 | 10/26/2011 | #844 | SPKLR | INSTALL 130 FEET OF 6 INCH FIRE LINE. |
| T11BU00288 | FINAL | 03/02/2011 | 10/30/2011 | #844 | SPKLR | Install 152 fire sprinklers |
| T11BU00407 | EXPIRED | 03/30/2011 | 09/26/2011 | #845 | TENTS | 1 CONOPY: 40' X 50' |
| T11BU00424 | FINAL | 04/01/2011 | 10/30/2011 | #844 | BUILD | FIRE ALARM |
| T11BU00634 | FINAL | 05/12/2011 | 07/03/2012 | #800 | SPKLR | Add 9 fire sprinklers |
| T11BU00654 | FINAL | 05/17/2011 | 01/18/2012 | #842 | SPKLR | Relocate 4 fire sprinklers |
| T11BU01037 | CLOSED | 08/09/2011 | 02/05/2012 | TENTS | TENT:40 X 100 LUNCHEON | |
| T11BU01160 | EXPIRED | 09/08/2011 | 03/07/2012 | SPKLR | Add 3 fire sprinklers | |
| T11BU01184 | EXPIRED | 09/16/2011 | 03/14/2012 | TENTS | 30' x 60' CANOPY | |
| T11BU01336 | EXPIRED | 10/11/2011 | 04/21/2012 | BUILD | FIRE ALARM | |
| T11BU01578 | FINAL | 11/30/2011 | 06/13/2012 | #805 | SPKLR | Relocate 3 fire sprinklers and replace 69' of pipe |
| T11BU01634 | EXPIRED | 12/09/2011 | 06/09/2012 | 801 | SPKLR | Relocate 1 fire sprinkler |
| T11BU01635 | FINAL | 12/09/2011 | 07/29/2012 | #805 | SPKLR | Relocate 4 fire sprinklers |
| T11BU01637 | FINAL | 12/12/2011 | 06/13/2012 | #842 | SPKLR | Add 9 fire sprinklers |
| T11BU01639 | FINAL | 12/12/2011 | 06/13/2012 | #807H1 | SPKLR | Add 6, relocate 15 fire sprinklers |
| T11BU01724 | FINAL | 12/29/2011 | 06/27/2012 | #807H1 | SPKLR | Relocate 23 fire sprinklers |
| T11OT00986 | FINAL | 05/18/2011 | 12/31/2011 | REGPLANT | REGISTERED PLANT | |
| T11PL00355 | FINAL | 02/24/2011 | 10/31/2011 | #844 | PLUMB | PRIVATE SEWER AND LIFT STATION |
| T12BU00739 | FINAL | 06/12/2012 | 01/29/2013 | #840 | SPKLR | Add 9, relocate 11 fire sprinklers |
| T12BU00802 | CLOSED | 06/27/2012 | 04/03/2023 | SPKLR | Add meter for flow testing- RATHEON | |
| T12BU00837 | FINAL | 07/06/2012 | 02/27/2013 | #848 | SPKLR | Add 4, relocate 11 fire sprinklers |
| T12BU00975 | FINAL | 08/16/2012 | 09/22/2013 | #840 | BUILD | FIRE ALARM SYSTEM |
| T12BU01116 | FINAL | 09/21/2012 | 09/22/2013 | #840 | SPKLR | ADD 235 FIRE SPRINKLERS |
| T12BU01279 | CLOSED | 10/26/2012 | 04/24/2013 | #848 | TENTS | TENTS (6) 20 X 20 AND (1) 20 X 40 TENT FOR A COMPANY LUNCH |
| T12BU01390 | FINAL | 11/27/2012 | 07/02/2013 | #840 | SPKLR | Add 28 fire sprinklers |
| T12BU01494 | FINAL | 12/18/2012 | 07/02/2013 | #840 | SPKLR | Relocate 47 fire sprinklers |
| T12BU01515 | FINAL | 12/21/2012 | 07/14/2013 | #842 | SPKLR | Add 15 fire sprinklers |
| T12CM01566 | C OF O | 04/03/2012 | 09/18/2013 | #840 | COMBO | TI: 45,800 S.F. OFFICE |
| T12CM03112 | EXPIRED | 05/31/2012 | 03/16/2013 | #848 | COMBO | TI: BUILDING NUMBER 848: CREATE NEW CONTROLLED ACCESS AREAS WITH NEW SEPERTATION AND STC WALLS. |
| T12CM07582 | EXPIRED | 11/30/2012 | 07/22/2014 | #842 | COMBO | TI: LOBBY AND CONFERENCE ROOM |
| T12CM07585 | FINAL | 11/30/2012 | 05/04/2014 | COMBO | STAIRS, LANDINGS AND FENCING FOR MODULAR BUILDINGS | |
| T12OT00695 | CLOSED | 05/01/2012 | 12/31/2012 | REGPLANT | REGISTERED PLANT | |
| T13BU00019 | FINAL | 01/08/2013 | 07/14/2013 | SPKLR | Add 1, relocate 2 fire sprinklers | |
| T13BU00217 | FINAL | 02/26/2013 | 10/19/2013 | SPKLR | FIRE SPRINKLER | |
| T13BU00337 | CLOSED | 03/21/2013 | 04/05/2023 | #840 | SPKLR | FIRE SPRINKLER |
| T13BU00395 | FINAL | 04/03/2013 | 01/21/2014 | #M06 | SPKLR | INSTALL NEW RISER AND 2 UPRIGHT HEADS IN NEW MOBILE DATA CENTER. |
| T13BU00430 | FINAL | 04/10/2013 | 11/02/2013 | #840 | BUILD | FIRE ALARM |
| T13BU00445 | FINAL | 04/15/2013 | 05/05/2014 | #842 | SPKLR | SPRINKLER |
| T13BU00447 | FINAL | 04/15/2013 | 05/05/2014 | #842 | BUILD | FIRE ALARM |
| T13BU00522 | CLOSED | 05/06/2013 | 04/05/2023 | 810 | SPKLR | INSTALL 9 NEW PENDENT AND UPRIGHT HEADS IN NEW OFFICES |
| T13BU00579 | WITHDRWN | 05/16/2013 | N/A | SPKLR | FIRE SPRINKLERS RELOCATE 1 AND INSTALL 1 | |
| T13BU00586 | FINAL | 05/21/2013 | 11/19/2013 | #845 | TENTS | 40' X 50' CANOPY |
| T13BU00589 | FINAL | 05/21/2013 | 06/14/2014 | #842 | BUILD | FIRE ALARM |
| T13BU00637 | FINAL | 05/31/2013 | 04/26/2014 | #M06 | BUILD | ECARO CLEAN AGENT W/ ALARM |
| T13BU00721 | FINAL | 06/12/2013 | 06/14/2014 | #842M1 | SPKLR | SPRINKLER |
| T13BU00932 | CLOSED | 08/14/2013 | 04/05/2023 | #805 | SPKLR | ADD 11, RELOCATE 1 FIRE SPRINKLERS |
| T13BU01050 | CLOSED | 09/13/2013 | 04/05/2023 | 801 | SPKLR | ADD 3 FIRE SPRINKLERS |
| T13BU01222 | FINAL | 11/05/2013 | 05/21/2014 | #840 | SPKLR | FIRE SPRINKLER |
| T13BU01235 | FINAL | 11/07/2013 | 07/12/2014 | #840 | BUILD | ADD FIRE ALARM NOTIFICATIN DEVICES |
| T13BU01439 | FINAL | 12/23/2013 | 07/09/2014 | #807 | SPKLR | Relcate 13 sprinkler heads Bldg 807 |
| T13BU01442 | FINAL | 12/24/2013 | 09/27/2015 | #847 | SPKLR | ADD 5 NEW HEADS |
| T13BU01443 | CLOSED | 12/24/2013 | 04/05/2023 | #805 | SPKLR | ADD NEW 6 NEW |
| T13CM00994 | EXPIRED | 02/20/2013 | 05/20/2014 | #842 | COMBO | TI: RATHEON "CHAMBER CONSTRUCTION" |
| T13CM01405 | C OF O | 03/12/2013 | 06/14/2014 | #842 | COMBO | RAYTHEON |
| T13CM07260 | L OF C | 12/03/2013 | 07/05/2014 | #842 | COMBO | TI: OFFICE - RAYTHEON |
| T13CM07484 | EXPIRED | 12/10/2013 | 07/02/2014 | #M02 | COMBO | 4 SHADE CANOPIES FOR RAYTHEON |
| T13OT01011 | FINAL | 08/26/2013 | N/A | REGPLANT | REGISTERED PLANT | |
| T13OT01526 | FINAL | 12/31/2013 | 12/31/2014 | REGPLANT | REGISTERED PLANT | |
| T14BU00017 | FINAL | 01/09/2014 | 07/09/2014 | #807 | BUILD | FIRE ALARM |
| T14BU00373 | FINAL | 04/08/2014 | 10/15/2014 | #842 | BUILD | ADD 1 SMOKE AND 1 AV |
| T14BU00392 | FINAL | 04/15/2014 | 11/11/2014 | #M06 | BUILD | ALARM |
| T14BU00428 | FINAL | 04/22/2014 | 11/11/2014 | #M06 | BUILD | ADD FIRE SUPPRESSION SYSTEM |
| T14BU00997 | FINAL | 09/05/2014 | 06/15/2015 | 810 | BUILD | FIXED SYSTEM-CLEAN AGENT and VESDA |
| T14BU01166 | WITHDRWN | 10/23/2014 | 08/03/2015 | #808 | SPKLR | FIRE SPRINKLER |
| T14BU01199 | CLOSED | 11/04/2014 | 05/03/2015 | TENTS | TENT 40 X 100 | |
| T14BU01340 | FINAL | 12/04/2014 | 08/04/2015 | #808 | SPKLR | 27 NEW FIRE SPRINKLERS |
| T14BU01360 | FINAL | 12/10/2014 | 06/17/2015 | #M06 | BUILD | ADD FIRE SUPPRESSION SYSTEM |
| T14BU01363 | EXPIRED | 12/10/2014 | 06/15/2015 | #809 | SPKLR | FIRE SPRINKLER |
| T14BU01392 | EXPIRED | 12/17/2014 | 07/06/2015 | #811T | SPKLR | FIRE SPRINKLER |
| T14CM02527 | L OF C | 05/01/2014 | 08/23/2015 | #808 | COMBO | TI: OFFICE |
| T14CM08055 | L OF C | 11/25/2014 | 06/22/2015 | #848 | COMBO | EXTEND EXISTING STAIRS FOR ROOF ACCESS |
| T15BU00024 | EXPIRED | 01/13/2015 | 07/15/2015 | #805 | SPKLR | FIRE SPRINKLERS |
| T15BU00132 | FINAL | 02/05/2015 | 08/19/2015 | #808 | BUILD | FIRE ALARM |
| T15BU00133 | FINAL | 02/05/2015 | 08/19/2015 | #842 | BUILD | FIRE ALARM-ADD 1 HORN STROBE AND 1 PULL STATION |
| T15BU00134 | FINAL | 02/05/2015 | 08/19/2015 | #843 | BUILD | FIRE ALARM-RELOCATE EXISTING HORN/STROBE |
| T15BU00187 | EXPIRED | 02/18/2015 | 08/29/2015 | SPKLR | ADD 2 FIRE SPRINKLERS | |
| T15BU00318 | FINAL | 03/25/2015 | 09/30/2015 | #845 | SPKLR | ADD 10 NEW FIRE SPRINKLERS |
| T15BU00359 | EXPIRED | 04/02/2015 | 09/30/2015 | #845 | BUILD | FIRE ALARM |
| T15BU00899 | FINAL | 08/05/2015 | 04/18/2016 | #842 | BUILD | ALARM |
| T15BU00900 | FINAL | 08/05/2015 | 04/18/2016 | #842 | SPKLR | SPRINKLER NEW 4 |
| T15BU01015 | FINAL | 09/03/2015 | 04/27/2016 | #805 | SPKLR | FIRE SPRINKLER |
| T15BU01021 | EXPIRED | 09/03/2015 | 03/16/2016 | #807 | SPKLR | FIRE SPRKL |
| T15BU01022 | FINAL | 09/03/2015 | 04/18/2016 | #842 | SPKLR | ADDED 2 SPRKS AND 60 FEET 4 INCH LINE |
| T15BU01083 | FINAL | 09/18/2015 | 03/27/2016 | SPKLR | FIRE SPRKL | |
| T15BU01115 | FINAL | 09/24/2015 | 03/27/2016 | 841 | BUILD | FIRE ALARM |
| T15BU01139 | FINAL | 09/30/2015 | 04/10/2016 | #811T | BUILD | REMOVE WALL MOUNT A/V MOVE BOX TO CEILING. INSTALL CEILING DEVICE |
| T15BU01152 | EXPIRED | 10/02/2015 | 04/05/2016 | 814 | BUILD | FIRE ALARM |
| T15BU01153 | CLOSED | 10/02/2015 | 04/10/2023 | 817 | BUILD | FIRE ALARM |
| T15BU01163 | CLOSED | 10/07/2015 | 04/10/2023 | #807 | SPKLR | SPRINKLER PERMIT |
| T15BU01180 | FINAL | 10/08/2015 | 05/22/2016 | #845 | BUILD | ALARM PERMIT |
| T15BU01194 | FINAL | 10/14/2015 | 04/18/2016 | #842 | BUILD | ADD 1 HORN/STROBE AND TWO DUAL MONITOR MODULES ONTO EXISTING SYSTEM |
| T15BU01195 | FINAL | 10/14/2015 | 04/27/2016 | #805 | BUILD | RE-CONNECT DEVICES-NO PLANS |
| T15BU01306 | FINAL | 11/10/2015 | 05/10/2016 | TENTS | TENT 40 X 100 | |
| T15BU01414 | CLOSED | 12/07/2015 | 04/10/2023 | 801 | BUILD | FIRE ALARM |
| T15CM00727 | C OF O | 02/03/2015 | 10/05/2015 | #845 | COMBO | HANGER |
| T15CM05241 | FINAL | 07/30/2015 | 04/18/2016 | #842 | COMBO | TI: RATHEON "CHAMBER CONSTRUCTION" |
| T15CM05746 | EXPIRED | 08/18/2015 | 03/27/2016 | 841 | COMBO | RENOVATION |
| T15OT00489 | CLOSED | 04/13/2015 | 12/31/2015 | REGPLANT | REGISTERED PLANT | |
| T16BU00111 | CLOSED | 01/21/2016 | 04/10/2023 | #849 | BUILD | FIRE ALARM-TI |
| T16BU00367 | CLOSED | 03/09/2016 | 04/10/2023 | #849 | SPKLR | FIRE SPRKL |
| T16BU00504 | FINAL | 04/08/2016 | 03/19/2017 | # 917 | BUILD | FIRE ALARM |
| T16BU00581 | FINAL | 04/21/2016 | 03/22/2017 | #805 | SPKLR | FIRE SPRKL |
| T16BU00744 | FINAL | 05/11/2016 | 03/19/2017 | # 917 | SPKLR | FIRE SPRKL |
| T16BU00780 | CLOSED | 05/18/2016 | 04/10/2023 | #840 | SPKLR | FIRE SPRKL |
| T16BU00799 | CLOSED | 05/23/2016 | 04/10/2023 | 801 | SPKLR | FIRE SPRKL |
| T16BU01023 | CLOSED | 07/06/2016 | 04/10/2023 | #840 | BUILD | FIRE ALARM TENANT IMPROVEMENT |
| T16CM00478 | C OF O | 01/21/2016 | 03/29/2017 | # 917 | COMBO | NEW METAL BUILDING |
| T16FC00069 | FINAL | 09/22/2016 | 02/06/2022 | #M02 | FIRECONS | INSTALL NEW WET PIPE FIRE SPRINKLER SYSTEM |
| T16FO00027 | WITHDRWN | 09/27/2016 | N/A | FIREOPER | INSTALL 40X80 TENT OUTSIDE BUILDING 827C ON 9/27/2016 | |
| T16OT00141 | CLOSED | 02/01/2016 | 12/31/2016 | REGPLANT | REGISTERED PLANT | |
| T17CM02633 | EXPIRED | 04/05/2017 | 04/01/2020 | 919 | COMBO | CENTRAL UTILITY PERMIT |
| T17CM02634 | FINAL | 04/05/2017 | 04/01/2020 | COMBO | SITE UTILITY PLAN | |
| T17CM02636 | C OF O | 04/05/2017 | 03/22/2023 | 920 | COMBO | ADVANCED TEST FACILITY |
| T17CM03026 | L OF C | 04/19/2017 | 09/22/2019 | #921 | COMBO | FOUNDATION ONLY |
| T17CM03512 | C OF O | 05/04/2017 | 03/22/2023 | #921 | COMBO | NEW MULTI PURPOSE BLDG |
| T17CM04421 | WITHDRWN | 06/06/2017 | N/A | COMBO | NEW GUARD SHACK | |
| T17CM04422 | EXPIRED | 06/06/2017 | 12/13/2017 | COMBO | TEMP MODULAR BLDG (SMALL) | |
| T17CM04423 | EXPIRED | 06/06/2017 | 12/13/2017 | COMBO | TEMP MODULAR BLDG (LARGE) | |
| T17CM05939 | C OF O | 08/03/2017 | 10/30/2018 | #845 | COMBO | HANGER |
| T17CM07551 | EXPIRED | 10/05/2017 | 04/15/2018 | # 917 | COMBO | ELECTRICAL UPGRADE |
| T17CM07765 | C OF O | 10/16/2017 | 02/23/2020 | 918 | COMBO | NEW DATA CENTER |
| T17FC00038 | FINAL | 01/12/2017 | 03/12/2018 | #840 | FIRECONS | Install one fire alarm system for Raytheon Bldg 840 - Chiller Plant |
| T17FC00168 | FINAL | 03/01/2017 | 11/08/2017 | FIRECONS | BLDG 802 - MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM | |
| T17FC00530 | FINAL | 06/28/2017 | 02/26/2018 | #840 | FIRECONS | Modify Existing Wet Pipe Fire Sprinkler System |
| T17FC00764 | FINAL | 09/19/2017 | 09/17/2018 | #848 | FIRECONS | MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM |
| T17FC00772 | FINAL | 09/21/2017 | 09/04/2018 | #845 | FIRECONS | NEW AFFF FOAM SYSTEM |
| T17FC00773 | FINAL | 09/22/2017 | 10/15/2018 | 814 | FIRECONS | MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM |
| T17FC00854 | WITHDRWN | 10/17/2017 | N/A | #850 | FIRECONS | MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM |
| T17FC00855 | VOID | 10/17/2017 | N/A | #850 | FIRECONS | MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM |
| T17FC00856 | FINAL | 10/17/2017 | 03/07/2021 | #850 | FIRECONS | MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM |
| T17FC00923 | FINAL | 11/09/2017 | 09/24/2018 | 920 | FIRECONS | BLDG 920 - Fire Line Installation |
| T17FC00924 | FINAL | 11/09/2017 | 06/16/2018 | FIRECONS | BLDG 922 - Fire Line Installation | |
| T17FC00925 | FINAL | 11/09/2017 | 09/22/2019 | FIRECONS | BLDG 921- Fire Line Installation | |
| T17FC00954 | FINAL | 11/22/2017 | 10/26/2019 | 919 | FIRECONS | INSTALL ONE NEW NOTIFIER BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON - NORTH AIRPORT EXPANSION - B919 CENTRAL UTILITY PLANT. |
| T17FC01023 | FINAL | 12/15/2017 | 10/09/2018 | FIRECONS | Visitor Center - Install New Wet Fire Sprinkler System | |
| T17FO00049 | FINAL | 01/26/2017 | 07/29/2017 | #845 | FIREOPER | Raytheon Airport Site - BLDG 845 Set-up Catering Tent for Raytheon Event Set-up 01-27-2017 Tear-down 02-02-2017 Contact: Linwood 343-5390 |
| T18CM02106 | EXPIRED | 03/21/2018 | 04/30/2019 | 841 | COMBO | RESTROOM ADDITION |
| T18CM04356 | FINAL | 06/05/2018 | 04/15/2023 | 930 | COMBO | NEW SHELL BUILDING |
| T18CM04555 | FINAL | 06/12/2018 | 02/12/2020 | 930 | COMBO | UNDERGROUND UTILITIES |
| T18CM04589 | FINAL | 06/13/2018 | 04/15/2023 | 930 | COMBO | NES TEST FACILITY - SHELL PKG ONLY |
| T18CM05038 | EXPIRED | 06/27/2018 | 12/08/2019 | 920 | COMBO | TI: LSV LAB |
| T18CM05296 | FINAL | 07/09/2018 | 07/23/2019 | COMBO | PARKING LOT LIGHTING | |
| T18CM05772 | EXPIRED | 07/25/2018 | 03/19/2019 | COMBO | FOUNDATION ONLY - RANGER CHAMBER FOUNDATION | |
| T18CM06066 | C OF O | 08/06/2018 | 03/05/2023 | 930 | COMBO | RAYHEON ETF |
| T18FC00007 | FINAL | 01/03/2018 | 10/15/2018 | FIRECONS | BLDG 828 - Modify Existing Wet Pipe Fire Sprinkler system | |
| T18FC00031 | FINAL | 01/10/2018 | 09/04/2018 | #845 | FIRECONS | BLDG 845 - HANGAR D - Modification of (1) One existing Building Fire Alarm System for the Raytheon Missile Systems |
| T18FC00157 | FINAL | 02/20/2018 | 10/28/2018 | FIRECONS | INSTALL ONE (1) NEW NOTIFIES BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON - NORTH AIRPORT EXPANSION - B922, VISITORS CENTER | |
| T18FC00201 | FINAL | 03/08/2018 | 02/07/2022 | FIRECONS | INSTALL ONE NEW NOTIFIER BUILDING FIRE ALARM SYSTEM FOR THE RAYTHEON - NORTH AIRPORT EXPANSION - B922, RF TEST FACILITY. | |
| T18FC00403 | VOID | 05/10/2018 | N/A | 920 | FIRECONS | B920, RF Test Facility - Install One (1) new notifier Building Fire Alarm System for the Raytheon North Airport Expansion |
| T18FC00496 | FINAL | 06/13/2018 | 01/26/2019 | 919 | FIRECONS | INSTALLATION OF A NEW WET AUTOMATIC FIRE SPRINKLER SYSTEM. |
| T18FC00557 | FINAL | 07/06/2018 | 05/17/2022 | FIRECONS | Bldg #921 Provide 6" potable water line to Fire System | |
| T18FC00563 | FINAL | 07/10/2018 | 05/17/2022 | FIRECONS | Bldg #918 Provide 6" potable water line to Fire System (Backflow, PIV, FDC & Riser by Kazal Fire) | |
| T18FC00582 | FINAL | 07/18/2018 | 01/14/2019 | 919 | FIRECONS | INSTALL DUTILE UG FIRE RISER FROM EXIST PIV TO ABOVE GROUND WITH FLANGE & BLIND FLANGE. |
| T18FC00632 | FINAL | 08/02/2018 | 02/23/2019 | FIRECONS | 6" FIRE RISER AT CONTROL ROOM | |
| T18FC00994 | FINAL | 12/11/2018 | 05/17/2022 | FIRECONS | FIRELINE INSTALLATION REVISION 1. 01/07/19 | |
| T19CM03452 | FINAL | 05/15/2019 | 12/19/2022 | COMBO | ELECTRICAL FIT UP FOR RANGE CHAMBER | |
| T19CM03505 | L OF C | 05/17/2019 | 05/23/2020 | 920 | COMBO | TI: FOR CHAMBER IN EXSISTING BLDG |
| T19CM07266 | L OF C | 10/04/2019 | 03/22/2023 | 920 | COMBO | TI: LAB SPACE |
| T19FC00029 | FINAL | 01/10/2019 | 08/11/2019 | FIRECONS | MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM. | |
| T19FC00144 | FINAL | 02/21/2019 | 04/29/2020 | 930 | FIRECONS | INSTALL NEW WET FIRE PROTECTIONS SYSTEMS IN BUILDING 930 |
| T19FC00191 | FINAL | 03/14/2019 | 06/17/2020 | FIRECONS | FIRE ALARM | |
| T19FC00646 | FINAL | 08/15/2019 | 04/19/2020 | FIRECONS | MODIFY EXISITNG WET PIPE FIRE SPRINKLER SYSTEM. | |
| T19FC00762 | FINAL | 09/18/2019 | 08/03/2020 | FIRECONS | INSTALL PREACTION SPRINKLER SYSTEM FOR ANECHOIC CHAMBER #2 IN RAYTHEON BUILDING 927 | |
| T20FC00075 | FINAL | 01/29/2020 | 11/23/2020 | FIRECONS | BLDG 927 - Install Preaction Sprinkler System for ANechoic Chamber #3 | |
| T20FC00125 | FINAL | 02/20/2020 | 11/16/2020 | FIRECONS | Bldg 927 modify existing fire alarm | |
| T20FC00768 | FINAL | 11/12/2020 | 03/07/2023 | FIRECONS | B803 - Lab & Research - Install One (1) Existing Notifier Building Fire Alarm System | |
| T20FC00777 | FINAL | 11/13/2020 | 10/17/2021 | FIRECONS | Install One (1) Clean Agent System for the Raytheon 927 HIL Chamber | |
| T21FC00021 | FINAL | 01/12/2021 | 08/08/2021 | FIRECONS | B803 - Re-Install Two (1) Existing Chamber Fire Suppression Systems for the Raytheon | |
| T21FC00147 | FINAL | 02/24/2021 | 02/09/2022 | FIRECONS | Building 807 - Partial replacement of two Wet Pipe Sprinkler Systems on east side | |
| T21FC00176 | FINAL | 03/04/2021 | 02/26/2023 | FIRECONS | South Entry Control Facility - Underground line for New Bldg | |
| T21FC00281 | FINAL | 04/22/2021 | 12/07/2021 | FIRECONS | Bldg 846 - Re-install piping in relocated rack shelving. | |
| T21FC00485 | FINAL | 06/16/2021 | 02/09/2022 | FIRECONS | Partial replacement of North Bathroom Area within Raytheon 807, System 4 | |
| T21FC00654 | FINAL | 08/25/2021 | 02/26/2023 | FIRECONS | Modification to existing wet pipe sprinkler system . | |
| T21FC00752 | FINAL | 10/06/2021 | 03/07/2023 | FIRECONS | Install One (1) New Notifier Building Fire Alarm System for The Raytheon Technologies - South Entry Control Building. | |
| T22CM05517 | VOID | 07/20/2022 | N/A | COMBO | THIS PROJECT WILL BE COMPRISED OF: CHANGES ON THE EXISTING SELF SUPPORT TOWER: · POSITION 4- REMOVE (1) TMA PER SECTOR, (3) SECTOR, (3) TOTAL · POSITION 1-REMOVE (1) ANTENNA, PER SECTOR, (3) SECTOR, (3) TOTAL · POSITION 1-RELOCATE (3) RRH, PER SECTOR, (3) SECTOR, (9) TOTAL · POSITION 1-RELOCATE (1) WCS FILTER, PER SECTOR ALPHA & BETA, (2) SECTOR, (2) TOTAL · POSITION 1- INSTALL (2) STACKED ANTENNA/RRH, PER SECTOR, (3) SECTOR, (6) TOTAL · REPLACE (1) DC6 SURGE SUPPRESSOR W/(1) DC9 SURGE SUPPRESSOR TOTAL · REMOVE (2) EXISTING DC TRUNKS · INSTALL (3) 6AWG DC TRUNKS & (1) 24-PAIR FIBER TRUNK | |
| T22FC00344 | FINAL | 05/16/2022 | 12/27/2022 | FIRECONS | Add/Relocate 169 existing pendent sprinklers to new tenant finish. | |
| T22FO00795 | FINAL | 09/21/2022 | 04/17/2023 | FIREOPER | RAYTHEON NEW HIRE EVENT 60' X 100' 10/20/22 | |
| T97OT00131 | FINAL | 07/15/1997 | 12/31/1997 | REGPLANT | REGISTERED PLANT FOR: HUGHES AIRCRAFT | |
| T98BU02454 | FINAL | 10/08/1998 | 05/17/1999 | SPKLR | FIRE SPKR:NEW 117 | |
| T98CM02312 | FINAL | 05/27/1998 | 07/04/1999 | #843 | COMBO | ADDITION:2ND FLOOR -SHELL ONLY |
| T98CM03071 | C OF O | 07/16/1998 | 07/04/1999 | #843 | COMBO | TI:INDUSTRIAL:2ND FLOOR SHELL UNDER T98CM02312 |
| T98ME00613 | FINAL | 08/12/1998 | 02/17/1999 | MECH | BOILER:BLOW DOWN TANK | |
| T98ME00995 | FINAL | 12/10/1998 | 11/07/1998 | MECH | PRESSURE VESSEL CERTIFICATE:TUC-21324,21323 | |
| T98OT00123 | FINAL | 05/11/1998 | 12/31/1998 | REGPLANT | REGISTERED PLANT FOR:RAYTHEON SYSTEMS CO | |
| T99BU00560 | WITHDRWN | 03/03/1999 | N/A | SPKLR | SPKLR: | |
| T99BU00561 | FINAL | 03/03/1999 | 08/20/2007 | #800 | GRADING | GRADING:0 CY CUT & 2200 CY FILL |
| T99BU00891 | FINAL | 04/05/1999 | 03/25/2000 | #843 | SPKLR | FIRE SPKR:UNDERGROUND PIPE 30 OF 6" |
| T99BU01256 | FINAL | 05/10/1999 | 03/25/2000 | SPKLR | FIRE SPKR:NEW 79 &10 NEW | |
| T99BU01376 | FINAL | 05/19/1999 | 12/08/1999 | 800 | SPKLR | FIRE SPKR:NEW 197 & 75 OF 6" PIPING |
| T99BU01655 | FINAL | 06/21/1999 | 01/25/2000 | #805 | SPKLR | FIRE SPKR:NEW 19 |
| T99BU02119 | FINAL | 08/03/1999 | 03/22/2000 | #843 | SPKLR | FIRE SPKR:NEW 8 |
| T99BU02627 | FINAL | 09/20/1999 | 03/25/2000 | #843 | SPKLR | FIRE SPKR:NEW 10 |
| T99BU02629 | FINAL | 09/20/1999 | 04/05/2000 | #843 | SPKLR | FIRE SPKR:NEW 22 |
| T99BU02659 | FINAL | 09/23/1999 | 04/19/2000 | #843M2 | SPKLR | FIRE SPKR:91012" 1856" 608" UNDERGROUND PIPE |
| T99BU02820 | FINAL | 10/12/1999 | 04/11/2000 | #843 | SPKLR | FIRE SPKR:ADD 7 RELOCATE 4 |
| T99BU02864 | FINAL | 10/18/1999 | 08/20/2007 | #807H1 | GRADING | GRADING:28,960 CY CUT & 25,185 CY FILL |
| T99BU02917 | EXPIRED | 10/22/1999 | 04/22/2000 | #843M2 | SPKLR | FIRE SPKR:ADD 110 |
| T99BU03079 | FINAL | 11/08/1999 | 06/06/2000 | 842M1 | SPKLR | FIRE SPKR:852 NEW |
| T99CM00513 | EXPIRED | 02/05/1999 | 10/24/2009 | #800 | COMBO | CONFERENCE CENTER |
| T99CM00956 | CLOSED | 03/05/1999 | 10/24/2009 | #800 | COMBO | CONFERENCE CENTER:FOUNDATION ONLY |
| T99CM01195 | EXPIRED | 03/18/1999 | 09/27/1999 | #843 | COMBO | FOUNDATION:ADDITION:LABORATORY |
| T99CM01464 | C OF O | 04/01/1999 | 01/17/2000 | #805 | COMBO | REMODEL AND ADDITION TO RESEARCH & DEV LABORATORY |
| T99CM01599 | EXPIRED | 04/09/1999 | 10/27/1999 | #843 | COMBO | SHELL COMPLETION |
| T99CM01828 | C OF O | 04/16/1999 | 04/05/2000 | #843 | COMBO | T.I.:ADDITION LABORATORY:COMPLETION |
| T99CM02754 | C OF O | 06/08/1999 | 02/16/2002 | #843 | COMBO | MODULAR:OFFICE |
| T99CM03087 | C OF O | 06/28/1999 | 10/17/2000 | #842 | COMBO | MODULAR:OFFICE |
| T99CM04787 | FINAL | 10/07/1999 | 12/20/2000 | #842 | COMBO | TI:OFFICE |
| T99CM05309 | EXPIRED | 11/05/1999 | 11/19/2000 | #845 | COMBO | AIRCRAFT HANGAR FOUNDATION ONLY |
| T99ME00047 | FINAL | 01/11/1999 | 03/15/1999 | MECH | PRESSURE VESSEL CERTIFICATE:TUC-20080 | |
| T99PL00678 | CLOSED | 03/30/1999 | 09/27/1999 | PLUMB | SEWER:PRIVATE | |
| TUC-20080 | CERTIFIC | 01/11/1999 | 08/06/1999 | VESSEL | ||
| TUC-21323 | CERTIFIC | 07/11/1997 | 05/10/2000 | VESSEL | ||
| TUC-21324 | CERTIFIC | 07/11/1997 | 05/10/2000 | VESSEL | ||
| TUC-22779 | RENEWAL | 11/19/1997 | 06/03/1998 | VESSEL |
Plans
Address: 1151 E HERMANS RD
Date - 12/07/2025 1:01 a.m.
Total Number Of Plans - (5)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CWH-16-0015 | Active | 01/22/2016 | 04/22/2017 | -- Commercial Water Harvesting Ordinance | SITE/GRADING | |
| CWH-17-0052 | Active | 03/13/2017 | 12/15/2019 | -- Commercial Water Harvesting Ordinance | DEV PKG- SITE/GRADING/SWPPP- NORTH AIRPORT EXPANSION1st Revision approved 12/04/17 (page 1-4, 8- | |
| CWH-18-0130 | Active | 05/31/2018 | 08/10/2020 | -- Commercial Water Harvesting Ordinance | E SITE/GRADE/SWPPP - Raytheon Environmental Test Facility, Bldg. 930 (phase 1) | |
| T17BA00010 | Inactive | 11/13/2017 | N/A | -- Stormwater Basin | ||
| T18BA00079 | Submitted | 02/20/2018 | N/A | -- Stormwater Basin |
Record Requests
Address: 1151 E HERMANS RD
Date - 12/07/2025 1:01 a.m.
Total Number Of Requests - (10)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-0124-00139 | Complete | 01/05/2024 | 01/10/2024 | Requests | Interior only Demolition Package Phase 1 for Building 808 |
| REQ-0124-00140 | Complete | 01/05/2024 | 01/10/2024 | Requests | INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREASIN (E) OFFICE AREAS. |
| REQ-0124-00538 | Complete | 01/17/2024 | 02/02/2024 | Requests | Remodeling of existing building and adding new single use restroom |
| REQ-0224-01466 | Denied | 02/22/2024 | N/A | Requests | This project is not complete all finals and any open inspections need to be approved. Please re-request LofC/CofO once all inspections are in approved status. Interior only Demolition Package Phase 1 for Building 808 |
| REQ-0224-01467 | Complete | 02/22/2024 | 02/27/2024 | Requests | INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREASIN (E) OFFICE AREAS. |
| REQ-0224-01468 | Complete | 02/22/2024 | 03/01/2024 | Requests | INTERIOR RENOVATION OF PORTION OF BUILDING TO CREATE NEW SECURE AREAS IN (E) OFFICE AREAS. |
| REQ-0324-01741 | Complete | 03/01/2024 | 03/11/2024 | Requests | Interior only Demolition Package Phase 1 for Building 808. Demolition completed 10/22. Build back under separate permit has been completed as well. |
| REQ-0325-01841 | Complete | 03/19/2025 | 03/19/2025 | Requests | *THE FILES FOR THIS ADDRESS ARE RESTRICTED. PLEASE EMAIL “PDSDINQUIRIES@TUCSONAZ.GOV” FOR FURTHER ASSISTANCE. * TD# 12-88-29 |
| REQ-0824-05523 | Complete | 08/15/2024 | 08/16/2024 | Requests | INTERIOR RENOVATION OF A PORTION OF THE BUILDING TO PROVIDE NEW CONFERENCE ROOMS IN (E) OFFICE AREAS. |
| REQ-0925-05779 | Approved | 09/18/2025 | 09/22/2025 | Requests | Remove existing upright sprinklers and add pendents using existing outlets. |