Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCBU - Interior Shear Bracing
Permit Number - TC-COM-0423-01131
Inspection Description - COT - HCBU - Interior Shear Bracing
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/22/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
02/22/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/16/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 7/10/2 Room L0200 corridor wall, second layer |
|
07/16/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer |
|
07/26/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, |
|
08/02/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. | |
08/07/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer |
|
08/11/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall |
|
08/15/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft |
|
08/18/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer |
|
08/21/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall |
|
08/23/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall |
|
08/25/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall |
|
08/31/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. |
|
09/06/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. |
|
09/08/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. 9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall. |
|
09/12/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer |
|
09/14/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. 9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall. 9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall. |
|
09/20/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. 9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall. 9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall. 9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room. |
|
09/22/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. |
|
09/28/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. 9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall. 9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall. 9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room. 9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side. |
|
10/02/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules |
|
10/04/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. 9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall. 9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall. 9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room. 9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side. 10/4/23: J0330 second layer drywall, D0315 second layer drywall west and north wall. D0305 East, west and north wall second layer drywall.B0300 south wall first layer drywall. |
|
10/09/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/21/23. West wall corridor side in room L0300.. 6/29/23. Room L0300 second layer, west wall and half half of south wall. 7/10/2 Room L0200 corridor wall, second layer 7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer, 8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall 8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer 8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. 9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall. 9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall. 9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room. 9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side. 10/4/23: J0330 second layer drywall, D0315 second layer drywall west and north wall. D0305 East, west and north wall second layer drywall.B0300 south wall first layer drywall. 10/9/23: D0300 vestibule second layer drywall, B0300 vestibule second layer drywall, B0300 east and west second layer drywall. |
|
10/12/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules 10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall. |
|
10/18/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules 10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall. 10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall. |
|
10/20/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules 10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall. 10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall. 10/20/23: A0300 west and east wall second layer drywall, A0300 Vestibule east wall second layer drywall. |
|
10/24/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules 10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall. 10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall. 10/20/23: A0300 west and east wall second layer drywall, A0300 Vestibule east wall second layer drywall. 10/24/23: A0300 conference room second layer drywall complete. |
|
10/26/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/25/23: J0215 and J0220 single layer drywall 8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall. 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. 9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall. 9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall. 9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room. 9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side. 10/4/23: J0330 second layer drywall, D0315 second layer drywall west and north wall. D0305 East, west and north wall second layer drywall.B0300 south wall first layer drywall. 10/9/23: D0300 vestibule second layer drywall, B0300 vestibule second layer drywall, B0300 east and west second layer drywall. 10/26/23: D0300 west side column second layer drywall, east side break room single layer drywall, bathroom lobby lid single layer drywall, East side lounge area single layer drywall. |
|
11/01/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules 10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall. 10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall. 10/20/23: A0300 west and east wall second layer drywall, A0300 Vestibule east wall second layer drywall. 10/24/23: A0300 conference room second layer drywall complete. 11/1/23: F0200 exterior west side wall double layer complete. |
|
11/03/2023 | COT - HCBU - Interior Shear Bracing | Not Ready | 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer. 8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer 8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft 8/23/23: D0205 IT room 1 layer drywall 9/12/23: H0305 east wall second layer 9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall. 10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules 10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall. 10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall. 10/20/23: A0300 west and east wall second layer drywall, A0300 Vestibule east wall second layer drywall. 10/24/23: A0300 conference room second layer drywall complete. 11/1/23: F0200 exterior west side wall double layer complete. |
|
11/06/2023 | COT - HCBU - Interior Shear Bracing | Partial Pass | 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed. 9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall. 9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall. 9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room. 9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side. 10/4/23: J0330 second layer drywall, D0315 second layer drywall west and north wall. D0305 East, west and north wall second layer drywall.B0300 south wall first layer drywall. 10/9/23: D0300 vestibule second layer drywall, B0300 vestibule second layer drywall, B0300 east and west second layer drywall. 10/26/23: D0300 west side column second layer drywall, east side break room single layer drywall, bathroom lobby lid single layer drywall, East side lounge area single layer drywall. 11/6/23: F0200 south double layer drywall. Ok to proceed |