Inspection Status: Passed

Inspection History: COT - HCBU - Interior Shear Bracing 

Permit Number - TC-COM-0423-01131

Inspection Description - COT - HCBU - Interior Shear Bracing 

Inspection Status - Passed

Date Description Inspector Results Comments
02/22/2024 COT - HCBU - Interior Shear Bracing  Passed
02/22/2024 COT - HCBU - Interior Shear Bracing  Passed
07/16/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

7/10/2 Room L0200 corridor wall, second layer
07/16/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer
07/26/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,
08/02/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.
08/07/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer
08/11/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall
08/15/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft
08/18/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer
08/21/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall
08/23/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall
08/25/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall
08/31/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.
09/06/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.

9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.
09/08/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.

9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.

9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall.
09/12/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer
09/14/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.

9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.

9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall.

9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall.
09/20/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.

9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.

9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall.

9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall.

9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room.
09/22/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.
09/28/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.

9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.

9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall.

9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall.

9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room.

9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side.
10/02/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules
10/04/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.

9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.

9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall.

9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall.

9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room.

9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side.

10/4/23: J0330 second layer drywall, D0315 second layer drywall west and north wall. D0305 East, west and north wall second layer drywall.B0300 south wall first layer drywall.
10/09/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 6/21/23. West wall corridor side in room L0300..

6/29/23. Room L0300 second layer, west wall and half half of south wall.

7/10/2 Room L0200 corridor wall, second layer

7/26/23: G0315 north shaft wall 1" purple drywall, Room L0300 second layer, Room L0310 East wall second layer, J0225 corridor north exterior second layer,

8/11/23: Area G4 single layer interior walls, L0320 second layer drywall East wall

8/18/23: G0300 south west wall second layer. G0300 south east 10' second layer complete, G0300 exterior vestibule second layer

8/21/23: L0300 east wall second layer, K0315 second layer drywall, G0300 south East remaining section second layer drywall

8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.

9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.

9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall.

9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall.

9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room.

9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side.

10/4/23: J0330 second layer drywall, D0315 second layer drywall west and north wall. D0305 East, west and north wall second layer drywall.B0300 south wall first layer drywall.

10/9/23: D0300 vestibule second layer drywall, B0300 vestibule second layer drywall, B0300 east and west second layer drywall.
10/12/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules

10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall.
10/18/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules

10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall.

10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall.
10/20/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules

10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall.

10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall.

10/20/23: A0300 west and east wall second layer drywall, A0300 Vestibule east wall second layer drywall.
10/24/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules

10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall.

10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall.

10/20/23: A0300 west and east wall second layer drywall, A0300 Vestibule east wall second layer drywall.

10/24/23: A0300 conference room second layer drywall complete.
10/26/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/25/23: J0215 and J0220 single layer drywall

8/31/23:second layer drywall North wall G0315, second layer south east corner G0300 vestibule and east wall of G0300, D0205 west exterior single layer drywall.

9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.

9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall.

9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall.

9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room.

9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side.

10/4/23: J0330 second layer drywall, D0315 second layer drywall west and north wall. D0305 East, west and north wall second layer drywall.B0300 south wall first layer drywall.

10/9/23: D0300 vestibule second layer drywall, B0300 vestibule second layer drywall, B0300 east and west second layer drywall.

10/26/23: D0300 west side column second layer drywall, east side break room single layer drywall, bathroom lobby lid single layer drywall, East side lounge area single layer drywall.
11/01/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules

10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall.

10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall.

10/20/23: A0300 west and east wall second layer drywall, A0300 Vestibule east wall second layer drywall.

10/24/23: A0300 conference room second layer drywall complete.
11/1/23: F0200 exterior west side wall double layer complete.
11/03/2023 COT - HCBU - Interior Shear Bracing  Not Ready 8/2/23: J0225 corridor second layer, L0320 second layer, L0200 second layer, K0200 first layer.

8/7/23: L0200 phone rooms first layer drywall, L0300 south wall second layer

8/15/23: E0215 Area H corridor second layer drywall both sides, K0310 single layer drywall East wall exterior 9ft

8/23/23: D0205 IT room 1 layer drywall

9/12/23: H0305 east wall second layer

9/22/23: E3-C3 second layer drywall, G0300 west wall second layer drywall, L0220 second layer drywall.

10/02/23: C0305 second layer drywall west and south wall, C0310 east and south second layer drywall, D0315 south wall, Second layer drywall column A to C north side except vestibules

10/12/23:B0300 south wall second layer drywall. B0310 second layer drywall. East Corridor A0315 second layer drywall.

10/18/23: J0310 second layer drywall, G0300 West exterior wall second layer drywall, B0300 Interior vestibule second layer drywall.

10/20/23: A0300 west and east wall second layer drywall, A0300 Vestibule east wall second layer drywall.

10/24/23: A0300 conference room second layer drywall complete.
11/1/23: F0200 exterior west side wall double layer complete.
11/06/2023 COT - HCBU - Interior Shear Bracing  Partial Pass 9/5/23: second layer H03010 exit alcove ok to proceed, G0315 west wall second layer ok to proceed.

9/8/23: G0310 second layer East and west wall, G0305 second layer East and west wall, H0300 second layer East and west wall.

9/14/23: D0300 west wall second layer drywall, D0300 south wall vestibule second layer drywall.

9/20/23: Second layer drywall D0300 west vestibule wall, second layer drywall corridor 2B first expansion joint D0300 to vestibule, second layer corridor 2B to D2 break room.

9/28/23: Second layer south of corridor column C to A, Second layer A0300 corridor south wall, single layer drywall D0200 south corridor side.

10/4/23: J0330 second layer drywall, D0315 second layer drywall west and north wall. D0305 East, west and north wall second layer drywall.B0300 south wall first layer drywall.

10/9/23: D0300 vestibule second layer drywall, B0300 vestibule second layer drywall, B0300 east and west second layer drywall.

10/26/23: D0300 west side column second layer drywall, east side break room single layer drywall, bathroom lobby lid single layer drywall, East side lounge area single layer drywall.

11/6/23: F0200 south double layer drywall. Ok to proceed