Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0123-00490
Permit Details
Apply Date:
01/17/2023
Applicant:
Cody Conca
Description:
Replacement Fire Station No. 14 for the City of Tucson, located on an undeveloped piece of property recently purchased and subdivided by the City of Tucson. The county APN has not been assigned but the new address will be 5500 South Nogales Highway.
Permit Reviews
Permit Number - TC-COM-0123-00490
Permit Status: Issued
Permit Description: Replacement Fire Station No. 14 for the City of Tucson, located on an undeveloped piece of property recently purchased and subdivided by the City of Tucson. The county APN has not been assigned but the new address will be 5500 South Nogales Highway.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/28/2025 | APPROVED |
| 05/05/2023 | COMMERCIAL REVIEW - FULL v.3 | 05/23/2023 | REQUIRES RESUBMIT |
| 12/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/23/2025 | REQUIRES RESUBMIT |
| 11/01/2023 | COMMERCIAL REVIEW - FULL v.4 | 11/14/2023 | APPROVED |
| 12/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/30/2025 | APPROVED |
| 03/24/2023 | COMMERCIAL REVIEW - FULL v.2 | 04/26/2023 | REQUIRES RESUBMIT |
| 10/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/04/2025 | APPROVED |
| 02/01/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/06/2023 | REQUIRES RESUBMIT |
| 11/14/2023 | RESTAMP - COMMERCIAL v.1 | 11/15/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0123-00490
Permit Status: Issued
Permit Description: Replacement Fire Station No. 14 for the City of Tucson, located on an undeveloped piece of property recently purchased and subdivided by the City of Tucson. The county APN has not been assigned but the new address will be 5500 South Nogales Highway.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/22/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0123-00490
Permit Status: Issued
Permit Description: Replacement Fire Station No. 14 for the City of Tucson, located on an undeveloped piece of property recently purchased and subdivided by the City of Tucson. The county APN has not been assigned but the new address will be 5500 South Nogales Highway.
| Date | Description | Comments |
|---|---|---|
| 02/01/2023 | Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512 | |
| 12/22/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 06/27/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/15/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 06/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/27/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 06/27/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 06/27/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 06/27/2024 | Masonry Inspection Report submittal review is required. | |
| 12/22/2025 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 06/27/2024 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. | |
| 06/27/2024 | Prior to project being finalized applicant must provide REPLACE THIS SECTION WITH THE REQUIRED DOCUMENT(S). |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0123-00490
Permite Description: Replacement Fire Station No. 14 for the City of Tucson, located on an undeveloped piece of property recently purchased and subdivided by the City of Tucson. The county APN has not been assigned but the new address will be 5500 South Nogales Highway.
Total Outstanding Inspections - 14
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | 4/17/25: electrical above ceiling approved in rooms (112,116,108) Hard lid areas only. |
| 04/01/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 4-1-25, partial pass on firewall inspection-verified fire caulking on 5/8" drywall up to the deck on dorm room's 122, 123, 124, 125, 126, 127, 136, 137, 138, 139, 140, 141. Okay to insulate at progress areas. |
| 12/02/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 8/20/24: North half of building Plumbing underground per plans. Pending corrections at laundry room and missing Clean out at dining room. Ok to backfill approved areas. Shading required. 8/21/24: North half of building plumbing underground per plans. Corrections were made . Ok to backfill. 9/6/24: plumbing Underground at Apparatus Bay per plans ok to backfill. Shading required. Turnout room, decon shower , workshop. Approved. Okay to backfill progress areas. Shading required. 9/10/2024 11/15/24: county inspection at tap passed ok to cover the first 60 feet. Passed test at first section. 11/21/24: not ready 12/2/24: inspection of sanitary to cover on south east corner partial pass for 3" under test. |
| 12/03/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 12-3-25: not applicable. |
| 12/23/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 6/28/24: reinforcement per plan at exterior footings (Dorm Rooms, Day Room, Electric, Lobby, Training(excluding N. Wall), Secured Patio, Captains Office, kitchen, pantry, EMS, Staff patio) 7/3/24: phase 2 reinforcement at footings around exterior perimeter at rooms (144,143,145,146,147 and 149), footing type WF1 and WF2. 7/24/24: phase 3 reinforcement at footings per plan ok to proceed with concrete pour. 8/2/24: reinforcement per plan at perimeter wall West side of project and Half way of North side. 11/25/24: vertical and horizontal rebar reinforcement at Dorms South, North, East and West wall at 15'4" per plan ok to proceed. 12/23/24: inspection requested fell under DP inspector for site wall. |
| 09/19/2024 | COT - HCBU - Preslab | N/A | Partial Pass | 9/19/2024: first pour north wing phase 1. Okay for concrete placement. |
| 10/28/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | Reinforcing steel, horizontal and vertical rebar for north wing cmu walls. N, S, and W walls of dorms, N, S, and W walls of day room, S wall of gym, N walls of public lobby, N, E, and S walls of training room, N, E, and W walls of captain's office; all from 0-4'8". N, E, and W walls of gym from 0-3'5". Okay to grout 1st lift. 10/28/2024 |
| 10/04/2024 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 10/4/24: okay to back fill feeder area. |
| 12/22/2025 | COT - HCBU - CofO | N/A | Partial Pass | 12-22-25: okay for Level 1 TCO. NOTE: pending 3rd party for outdoor lighting. |
| 12/22/2025 | COT - HCEL - Outdoor Lighting | N/A | Partial Pass | 12-22-25: pending 3rd party inspection report. |
| 12/22/2025 | COT - HCBU - Building Final | N/A | Re-inspection required | 12-22-25: Decon room-is not label, extractor not installed, tail piece condensate is after p-trap to sink at Decon room ( must be installed before), missing light cover on recessed light in Decon bathroom, adjust restroom door to 5 pounds of pressure at restroom- check all interior doors-must be at 5 pounds of pressure, copper line for evap. cooler required a 1" air gap, water heater condensation lines require 1" air gap, F4 receptacle in workshop keeps tripping, add plastic bushings on 2-junction boxes for low voltage at E3 in apparatus bay, missing hammer arrestors for dishwashers, ADA restroom doors at 10 pounds of pressure-adjust to 5 pounds of pressure, cap galvanized pipe northwest exit of fitness room, install gfci receptacles next to drinking fountain of fitness room, adjust restroom door at dorm to 5 pounds of pressure, add labels to receptacles in EMS room,label for fire pump room missing, RTU disconnect boxes must be labeled, missing fuses at AC-7, MicroMeti at AC-7 is over amped, AC-6 over amped, label receptacle st roof, all rooftop units are over amped, flex duct connector must be protected from sun damage, properly support liquid tight from roof, extension bar required at roof hatch. Okay for Level 1 TCO. |
| 12/22/2025 | COT - HCEL - Electrical Final | N/A | Re-inspection required | 12-22-25: Decon room-is not label, extractor not installed, tail piece condensate is after p-trap to sink at Decon room ( must be installed before), missing light cover on recessed light in Decon bathroom, adjust restroom door to 5 pounds of pressure at restroom- check all interior doors-must be at 5 pounds of pressure, copper line for evap. cooler required a 1" air gap, water heater condensation lines require 1" air gap, F4 receptacle in workshop keeps tripping, add plastic bushings on 2-junction boxes for low voltage at E3 in apparatus bay, missing hammer arrestors for dishwashers, ADA restroom doors at 10 pounds of pressure-adjust to 5 pounds of pressure, cap galvanized pipe northwest exit of fitness room, install gfci receptacles next to drinking fountain of fitness room, adjust restroom door at dorm to 5 pounds of pressure, add labels to receptacles in EMS room,label for fire pump room missing, RTU disconnect boxes must be labeled, missing fuses at AC-7, MicroMeti at AC-7 is over amped, AC-6 over amped, label receptacle st roof, all rooftop units are over amped, flex duct connector must be protected from sun damage, properly support liquid tight from roof, extension bar required at roof hatch. Okay for Level 1 TCO. |
| 12/22/2025 | COT - HCME - Mechanical Final | N/A | Re-inspection required | 12-22-25: Decon room-is not label, extractor not installed, tail piece condensate is after p-trap to sink at Decon room ( must be installed before), missing light cover on recessed light in Decon bathroom, adjust restroom door to 5 pounds of pressure at restroom- check all interior doors-must be at 5 pounds of pressure, copper line for evap. cooler required a 1" air gap, water heater condensation lines require 1" air gap, F4 receptacle in workshop keeps tripping, add plastic bushings on 2-junction boxes for low voltage at E3 in apparatus bay, missing hammer arrestors for dishwashers, ADA restroom doors at 10 pounds of pressure-adjust to 5 pounds of pressure, cap galvanized pipe northwest exit of fitness room, install gfci receptacles next to drinking fountain of fitness room, adjust restroom door at dorm to 5 pounds of pressure, add labels to receptacles in EMS room,label for fire pump room missing, RTU disconnect boxes must be labeled, missing fuses at AC-7, MicroMeti at AC-7 is over amped, AC-6 over amped, label receptacle st roof, all rooftop units are over amped, flex duct connector must be protected from sun damage, properly support liquid tight from roof, extension bar required at roof hatch. Okay for Level 1 TCO. |
| 12/22/2025 | COT - HCPL - Plumbing Final | N/A | Re-inspection required | 12-22-25: Decon room-is not label, extractor not installed, tail piece condensate is after p-trap to sink at Decon room ( must be installed before), missing light cover on recessed light in Decon bathroom, adjust restroom door to 5 pounds of pressure at restroom- check all interior doors-must be at 5 pounds of pressure, copper line for evap. cooler required a 1" air gap, water heater condensation lines require 1" air gap, F4 receptacle in workshop keeps tripping, add plastic bushings on 2-junction boxes for low voltage at E3 in apparatus bay, missing hammer arrestors for dishwashers, ADA restroom doors at 10 pounds of pressure-adjust to 5 pounds of pressure, cap galvanized pipe northwest exit of fitness room, install gfci receptacles next to drinking fountain of fitness room, adjust restroom door at dorm to 5 pounds of pressure, add labels to receptacles in EMS room,label for fire pump room missing, RTU disconnect boxes must be labeled, missing fuses at AC-7, MicroMeti at AC-7 is over amped, AC-6 over amped, label receptacle st roof, all rooftop units are over amped, flex duct connector must be protected from sun damage, properly support liquid tight from roof, extension bar required at roof hatch. Okay for Level 1 TCO. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0123-00490
Permit Description: Replacement Fire Station No. 14 for the City of Tucson, located on an undeveloped piece of property recently purchased and subdivided by the City of Tucson. The county APN has not been assigned but the new address will be 5500 South Nogales Highway.
Total Completed Inspections - 26
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2025 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 02/26/2025 | COT - HCBU - Framing | Passed | ||
| 07/28/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 08/21/2025 | BULD - Electrical Clearance | Passed | Approved 1000A 3-phase Service panel - ECO Clearance to TEP is required for the new service | |
| 10/27/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 10/24/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | 10-24-25: previously inspected and approved. | |
| 10/24/2025 | COT - HCPL - Backwater Valve | Passed | 10-24-25: backwater valve approved. | |
| 10/24/2025 | COT - HCPL - Plumbing Progress | Passed | 10-24-25: approved. | |
| 10/30/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 10/30/2025 | COT - HCBU - Building Above Ceiling | Passed | Ok to set ceiling tiles | |
| 10/30/2025 | COT - HCME - Mechanical Above Ceiling | Passed | Ok to set ceiling tiles | |
| 10/30/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | Ok to set ceiling tiles. | |
| 12/03/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | 12-3-25: approved. | |
| 12/03/2025 | COT - HCBU - Preslab | Passed | 12-3-25: approved. | |
| 12/03/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | 12-3-25: approved. | |
| 12/03/2025 | COT - HCBU - Masonry Pregrout | Passed | 12-3-25: previously inspected & approved. | |
| 12/03/2025 | COT - HCBU - Roof Nailing | Passed | 12-3-25: approved. | |
| 12/03/2025 | COT - HCEL - Electrical Progress | Passed | 12-3-25: approved. | |
| 12/03/2025 | COT - HCEL - Electrical Underground | Passed | 12-3-25: previously inspected. | |
| 12/03/2025 | COT - HCME - Mechanical Intermediate | Passed | 12-3-25: mechanical intermediate approved. | |
| 12/03/2025 | COT - HCME - Mechanical Progress | Passed | 12-3-25: approved. | |
| 12/03/2025 | COT - HCPL - Plumbing Intermediate | Passed | 12-3-25: approved. | |
| 12/22/2025 | COT - FCON - Fire - Final | Passed | ||
| 12/22/2025 | COT - HCEL - Grounding/Bonding | Passed | 12-22-25: approved. | |
| 12/22/2025 | COT - HCBU - Building Progress | Passed | 12-22-25: approved. | |
| 12/30/2025 | ENGR Engineering Final | Passed |