Permit: TC-COM-0123-00490

Parcel: 13701005H


Addresses:

5500 S NOGALES HY

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Preslab  

Date Description Inspector Results Comments
06/09/2025 COT - HCBU - Preslab   Partial Pass 6/9/2025 Detail 104&105 page S4.01 approved in field inspection per south wing of apparatus bay. Okay for concrete placement.
06/18/2025 COT - HCBU - Preslab   Partial Pass 6-18-25: reinforcements on apparatus bay verified per plans-okay to pour concrete.
07/24/2024 COT - HCBU - Preslab   Partial Pass 6/28/24: reinforcement per plan at exterior footings (Dorm Rooms, Day Room, Electric, Lobby, Training(excluding N. Wall), Secured Patio, Captains Office, kitchen, pantry, EMS, Staff patio)
7/3/24: phase 2 reinforcement at footings around exterior perimeter at rooms (144,143,145,146,147 and 149), footing type WF1 and WF2.
7/24/24: phase 3 reinforcement at footings per plan ok to proceed with concrete pour.
09/19/2024 COT - HCBU - Preslab   Partial Pass 9/19/2024: first pour north wing phase 1. Okay for concrete placement.
10/01/2024 COT - HCBU - Preslab   Partial Pass South wing. ( 144,143,145,146,147,148,149) okay for concrete placement. 10/1/2024
12/03/2025 COT - HCBU - Preslab   Passed 12-3-25: approved.