Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCME - Mechanical Final
Permit Number - TC-COM-0123-00490
Inspection Description - COT - HCME - Mechanical Final
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2025 | COT - HCME - Mechanical Final | Re-inspection required | 12-22-25: Decon room-is not label, extractor not installed, tail piece condensate is after p-trap to sink at Decon room ( must be installed before), missing light cover on recessed light in Decon bathroom, adjust restroom door to 5 pounds of pressure at restroom- check all interior doors-must be at 5 pounds of pressure, copper line for evap. cooler required a 1" air gap, water heater condensation lines require 1" air gap, F4 receptacle in workshop keeps tripping, add plastic bushings on 2-junction boxes for low voltage at E3 in apparatus bay, missing hammer arrestors for dishwashers, ADA restroom doors at 10 pounds of pressure-adjust to 5 pounds of pressure, cap galvanized pipe northwest exit of fitness room, install gfci receptacles next to drinking fountain of fitness room, adjust restroom door at dorm to 5 pounds of pressure, add labels to receptacles in EMS room,label for fire pump room missing, RTU disconnect boxes must be labeled, missing fuses at AC-7, MicroMeti at AC-7 is over amped, AC-6 over amped, label receptacle st roof, all rooftop units are over amped, flex duct connector must be protected from sun damage, properly support liquid tight from roof, extension bar required at roof hatch. Okay for Level 1 TCO. | |
| 12/30/2025 | COT - HCME - Mechanical Final | Partial Pass | 12-30-25: paint plastic on rooftop, AC units on rooftop are over amped, MicroMeti at AC-7 is not grounded, adjust lobby restroom door to 5 pounds of pressure, equipment not yet installed includes, extractor & ice machine with hammer arrestor. -OKAY FOR LEVEL 4 TCO. |