Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Apply Date:
08/29/2022
Applicant:
Andrew Suby
Description:
This project consists of replacing the main lab located on the basement and first floors of the exis

Permit Reviews

Permit Number - T22CM06674
Permit Status: Inspections complete
Permit Description: This project consists of replacing the main lab located on the basement and first floors of the exis
Start Date Submittal Complete Date Status  
08/29/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 10/03/2022 COMPLETED Review Details
10/18/2022 RESUBMITTAL 10/18/2022 ACTIVE Review Details
06/13/2024 COMMERCIAL REVIEW - FULL v.1 07/16/2024 APPROVED Review Details
03/18/2024 COMMERCIAL REVIEW - FULL v.1 04/18/2024 REQUIRES RESUBMIT Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 11/01/2022 REQUIRES RESUBMIT Review Details
01/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/05/2024 REQUIRES RESUBMIT Review Details
12/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/27/2023 APPROVED Review Details
11/07/2023 RESTAMP - COMMERCIAL v.1 11/07/2023 APPROVED Review Details
11/02/2023 COMMERCIAL REVIEW - FULL v.2 11/07/2023 APPROVED Review Details
11/25/2022 COMMERCIAL REVIEW - FULL v.2 01/04/2023 APPROVED Review Details
08/31/2023 COMMERCIAL REVIEW - FULL v.1 10/03/2023 REQUIRES RESUBMIT Review Details
10/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/09/2024 REQUIRES RESUBMIT Review Details
04/30/2024 RESTAMP - COMMERCIAL v.1 05/01/2024 APPROVED Review Details
04/26/2024 COMMERCIAL REVIEW - FULL v.2 04/30/2024 APPROVED Review Details
10/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/28/2024 APPROVED Review Details

Conditions

Permit Number - T22CM06674
Permit Status: Inspections complete
Permit Description: This project consists of replacing the main lab located on the basement and first floors of the exis
Date Description Comments
12/08/2022 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
05/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/28/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/28/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/15/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
10/28/2024 FIREPROOFING THICKNESS INSPECTION
10/28/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
10/28/2024 SPECIAL INSPECTION FOR STEEL FRAMES IS REQUIRED.
12/08/2022 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: T22CM06674
Permite Description: This project consists of replacing the main lab located on the basement and first floors of the exis
Total Outstanding Inspections - 20
Last Inspection Date Description Inspector Results Comments
06/21/2023 COT - HCME - Mechanical Intermediate N/A Partial Pass partial approval for curb attachments and 3rd party for curb anchors
12/18/2023 COT - FCON - Sprinkler - Final N/A Partial Pass Approved tower 4 only.
12/20/2023 COT - FCON - Alarm - Final N/A Not Ready
05/31/2023 COT - HCME - Mechanical Progress N/A Partial Pass partial approval for supply air shaft to first floor from AH009 IN BASEMENT and relief duct, and outside air duct to air intake, ok to insulate
08/31/2023 COT - HCBU - Framing N/A Partial Pass Tower 4, Rooms 14513, 14518, 14539.
12/14/2023 COT - HCEL - Electrical Above Ceiling N/A Partial Pass Area C. All MEP’S above ceiling approved.
EVS ROOM #14550. Tower 4 Area B MEP’S all above ceiling approved.
#14518 AREA B (GLASS WASHROOM) MEP’S all above ceiling approved. 12/14/2023
11/30/2023 COT - HCME - Mechanical Above Ceiling N/A Partial Pass 10/18/23 preamp room 14513 ok to drywall ceiling
10/25/23: hydro pressure test at 150psi at HHW and CHW to AHU 009 Basement Tower 4. Ok to insulate
11/13/23: Above ceiling hydronic pipe Tower 3 Area A, HHW piped to VAV's throughout Tower 3 Area A(Pressure Test), CHW pipe to FCU's to IDF room and Freezer room Tower 3 Area A (Pressure Test).
11/15/23 duct pressure test tower 3 as reflected on attached photos this date
11/30/23: mechanical above ceiling in Area B passed (south of passage 13572S), pending Rooms 14518 and storage
12/26/2023 COT - HCEL - Electrical Intermediate N/A Partial Pass Electric intermediate for Area C is completed.
11/30/2023 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass 9/13/23: compressed air in tower 3 to exterior yard. Tested at 150 PSI
11/30/23: plumbing above ceiling in Area B passed (south of passage 13572S), pending Rooms 14518 and storage
07/16/2024 COT - HCPL - Plumbing Intermediate N/A Partial Pass Sinks and eye wash stations in Lab #13571.
09/06/2023 COT - HCPL - Plumbing Progress N/A Partial Pass 8/24/23 - Partial approvals for 1st floor Tower 4 - rooms 14505, 14506, 14550, 14511, 14512, double doors at corridor 14554E, labs storage, mens and woman's restrooms * this completes framing at Tower 4
9/6/23: Tower 4- level 1- area B. CO2 tested at 150 psi. Compressed air tested at 150 psi. Domestic water tested at 120 psi. All areas tested and approved were high-lighted on page P301B.
01/18/2024 COT - HCBU - Interior Shear Bracing N/A Not Ready
08/31/2023 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Canceled
05/03/2024 COT - HCBU - Building Above Ceiling N/A Not Ready
12/21/2023 COT - HCEL - Electrical Final N/A Partial Pass Partial pass. Tower 4 approved. 12/21/2023
12/27/2023 COT - HCME - Mechanical Final N/A Partial Pass Partial Final Tower 4 - Area B and C
12/27/2023 COT - HCPL - Plumbing Final N/A Partial Pass Partial Final Tower 4 - Area B and C
Pending 14518 glass wash room (furniture tie in) 12/27/2023
10/14/2024 COT - FCON - Fire - Final N/A Partial Pass ok for tco per tucson fire. still need to walk and check exit signs.
12/29/2023 COT - HCBU - Building Final N/A Partial Pass Partial Final for TCO level 4 - For Tower 4 Area B and C of Project. 12/29/2023
12/29/2023 COT - HCBU - Building Progress N/A Partial Pass Partial Final for TCO level 4 - For Tower 4 Area B and C of Project. 12/29/2023

Completed Inspections

Permit Status: Inspections Complete
Permit Number: T22CM06674
Permit Description: This project consists of replacing the main lab located on the basement and first floors of the exis
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/25/2023 FCON – Fire – Intermediate Passed
09/09/2023 COT - HCME - Mechanical Intermediate Passed
09/18/2023 COT - HCEL - Electrical Progress Passed
12/27/2023 COT - FCON - Alarm - Final Passed
01/17/2024 COT - HCME - Mechanical Progress Passed
03/21/2024 COT - HCEL - Electrical Above Ceiling Passed Tower #3, Area A; circuits for lab furniture to be dropped when furniture is installed.
08/06/2024 COT - HCPL - Plumbing Above Ceiling Passed DI water lines and compressed air lines as per RFI #180 and #207.
08/06/2024 COT - HCPL - Plumbing Intermediate Passed
08/06/2024 COT - HCPL - Plumbing Progress Passed DI water lines and compressed air lines as per RFI #180 and #207.
10/10/2024 COT - HCBU - Interior Shear Bracing Passed
10/10/2024 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
10/10/2024 COT - HCBU - Building Above Ceiling Passed Ok to set remaining ceiling tiles.
10/15/2024 COT - HCEL - Electrical Final Passed
10/15/2024 COT - HCPL - Rough Soil Passed
10/15/2024 COT - HCME - Mechanical Final Passed
10/15/2024 COT - HCPL - Plumbing Final Passed
11/07/2024 COT - FCON - Fire - Final Passed
11/08/2024 COT - HCBU - Building Final Passed signage to be completed by Banner
11/08/2024 COT - HCBU - Building Progress Passed

Documents

File Name Document Type  
SIC - CONCRETE AND STRUCTURAL - FINAL-2024-10-24_V2.PDF DOCUMENTS VIEW
TOWER 3 FIREPROOFING - SIC - BUMCT-MAIN LAB.NY.ITR.FINAL - CLERESTORY -2024-10-24_V2.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
20240607_BUMCT_MAIN_LAB-PR-05-CALCS_V1.PDF DOCUMENTS VIEW
20240607_BUMCT_MAIN_LAB-PR-05-DRAWINGS_V1.PDF DOCUMENTS VIEW
20240607_BUMCT_MAIN_LAB-PR-05-NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
20240315_BUMCT_MAIN_LAB-PR-04-CALCS_V2.PDF DOCUMENTS VIEW
20240315_BUMCT_MAIN_LAB-PR-04-SPECIFICATIONS_V2.PDF DOCUMENTS VIEW
CONS-2024-04-25 BUMCT LAB - ASI-03_V2.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
BUMC MAIN LAB REPLACEMENT TOWER 4 - TEST AND BALANCE REPORT_V1.PDF DOCUMENTS VIEW
BUMC MAIN LAB TOWER 4 WATER TEST - 23L0628_1 TURNER 12 22 2023 1423-2023-12-26_V1.PDF DOCUMENTS VIEW
MEDICAL GAS INSTALLATION_V1.PDF DOCUMENTS VIEW
MTA J63708 BUMCT TOWER 4 OXYGEN RE-ROUTE AND VALVE ADDITION_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-20215740_PR03_DRAWINGS_20231030_V2_V1.PDF DOCUMENTS VIEW
2_COMMENT LETTER_V1.PDF DOCUMENTS VIEW
2_COMMENT LETTER_V1.PDF DOCUMENTS VIEW
2_COMMENT LETTER_V1.PDF DOCUMENTS VIEW
2_COMMENT LETTER_V1.PDF DOCUMENTS VIEW
2_COMMENT LETTER_V1.PDF DOCUMENTS VIEW
3_COMMENT RESPONSE LETTER_T22CM06674-BUMCT MAIN LAB REPLACEMENT_CITY REVIEW COMMENTS 2_V1.PDF DOCUMENTS VIEW
3_PLAN SET_BUMCT MAIN LAB REPLACEMENT_CITY REVIEW COMMENTS 2_V1.PDF DOCUMENTS VIEW
20215740_PR03_DRAWINGS_20230821_V1.PDF DOCUMENTS VIEW
20215740_PR03_SPECIFICATIONS_20230821_V1.PDF DOCUMENTS VIEW
20215740_PR03_NARRATIVE_20230821_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SPECS_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL_SPECIAL_INSPECTION_CERT_V1.PDF DOCUMENTS VIEW
2_STRUCTURAL CALCULATIONS_BUMCT LAB REPLACEMENT_CALCULATION PACKAGE_CITY REVIEW COMMENTS 1_V1.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_BUMCT MAIN LAB REPLACEMENT_CITY REVIEW COMMENTS 02_V2.PDF DOCUMENTS VIEW
1_STRUCTURAL_SPECIAL_INSPECTION_CERT_V1.PDF DOCUMENTS VIEW