Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCME - Mechanical Above Ceiling
Permit Number - T22CM06674
Inspection Description - COT - HCME - Mechanical Above Ceiling
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/04/2024 | COT - HCME - Mechanical Above Ceiling | Partial Pass | SMACNA pressure testing for ductwork in space serviced by ERU 201/202 approved. Okay to insulate. 1/4/2024 | |
01/10/2024 | COT - HCME - Mechanical Above Ceiling | Partial Pass | Main Exhaust Ductwork for AHU 211 - Tower 3 - SMACNA pressure test approved. Okay to insulate. 1/10/2024 | |
01/31/2024 | COT - HCME - Mechanical Above Ceiling | Partial Pass | Mechanical piping from area A tower 3 space up the shaft to the low roof under pressure. 1/31/2024 | |
02/22/2024 | COT - HCME - Mechanical Above Ceiling | Canceled | Canceled per contractor. 2/22/2024 | |
05/03/2024 | COT - HCME - Mechanical Above Ceiling | Not Ready | ||
05/06/2024 | COT - HCME - Mechanical Above Ceiling | Partial Pass | Area A, Ok to place ceiling tiles. | |
10/19/2023 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 10/18/23 preamp room 14513 ok to drywall ceiling | |
10/25/2023 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 10/18/23 preamp room 14513 ok to drywall ceiling 10/25/23: hydro pressure test at 150psi at HHW and CHW to AHU 009 Basement Tower 4. Ok to insulate |
|
11/13/2023 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 10/18/23 preamp room 14513 ok to drywall ceiling 10/25/23: hydro pressure test at 150psi at HHW and CHW to AHU 009 Basement Tower 4. Ok to insulate 11/13/23: Above ceiling hydronic pipe Tower 3 Area A, HHW piped to VAV's throughout Tower 3 Area A(Pressure Test), CHW pipe to FCU's to IDF room and Freezer room Tower 3 Area A (Pressure Test). |
|
11/15/2023 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 11/15/23 duct pressure test tower 3 as reflected on attached photos this date Supply Air Main Ductwork SMACNA pressure Testing - Tower 3 - Area A Above Ceiling | |
11/30/2023 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 10/18/23 preamp room 14513 ok to drywall ceiling 10/25/23: hydro pressure test at 150psi at HHW and CHW to AHU 009 Basement Tower 4. Ok to insulate 11/13/23: Above ceiling hydronic pipe Tower 3 Area A, HHW piped to VAV's throughout Tower 3 Area A(Pressure Test), CHW pipe to FCU's to IDF room and Freezer room Tower 3 Area A (Pressure Test). 11/15/23 duct pressure test tower 3 as reflected on attached photos this date 11/30/23: mechanical above ceiling in Area B passed (south of passage 13572S), pending Rooms 14518 and storage |
|
12/14/2023 | COT - HCME - Mechanical Above Ceiling | Partial Pass | Area C. All MEP’S above ceiling approved. EVS ROOM #14550. Tower 4 Area B MEP’S all above ceiling approved. #14518 AREA B (GLASS WASHROOM) MEP’S all above ceiling approved. 12/14/2023 |