Permit: T22CM06674

Parcel: 123100280


Addresses:

1625 N CAMPBELL AV

Inspection Status: Partial Pass

Inspection History: COT - HCEL - Electrical Intermediate

Date Description Inspector Results Comments
04/24/2024 COT - HCEL - Electrical Intermediate Partial Pass New panels installed on Level #1: 225 amp (2), 125 amp (1), 100 amp (5); Level #2: 90-100 amp (PC3-201), Roof VFD #5, AHU-211; Basement at S3N-BO1A, P3C-B26, L3S-BO1, T1C-BO1, SIN-BO1A. No electric clearance required at this time. Will recall when ready to,energize system.
07/16/2024 COT - HCEL - Electrical Intermediate Partial Pass Work station areas and cabinets in Lab #13571.
COT - HCEL - Electrical Intermediate Partial Pass 11/17/23: panels P3S-101,PLS-101, P3C-101, P1C-120,P1C-119 ok to energize.
11/22/2023 COT - HCEL - Electrical Intermediate Partial Pass 11/22/23 partial for area C electrical in offices and corridor walls, ok to 2 side in offices only
12/01/2023 COT - HCEL - Electrical Intermediate Partial Pass Electrical in wall at column N-30. Furniture connection. Area C. 12/1/2023
12/20/2023 COT - HCEL - Electrical Intermediate Partial Pass HCTT Lab #14526
HLA Molecular Lab #14516 furniture lab bench 12/20/2023
12/26/2023 COT - HCEL - Electrical Intermediate Partial Pass Electric intermediate for Area C is completed.