Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 1625 N CAMPBELL AV
Search
Parcel Attributes
Parcel | 123100280 12310001C 12310001H |
---|---|
City of Tucson Zoning | NR-2, PAD-28, R-1, NR-1, R-2 |
Tucson Ward | Ward 6, Ward 3 |
Tucson Registered Neighborhood | Jefferson Park, North University |
Major Streets & Routes | Gateway Route ,Intersection Buffer |
National Register Historic District | Jefferson Park Historic District |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Rezoning Cases
Date - 12/24/2024 6:04 p.m.
Total Number Of Rezone Cases - (3)
Permits
Address: 1625 N CAMPBELL AV
Date - 12/24/2024 6:04 p.m.
Total Number Of Permits - (99)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TF-FOP-1222-00278 | Complete | 12/27/2022 | 02/29/2024 | Fire Operational Permit | Banner Main Hospital I-2 692 Beds | |
TF-FOP-1222-00279 | Complete | 12/27/2022 | 03/20/2024 | Fire Operational Permit | TFC 105.6.16 Flammable and Combustibel Liquids - FO Permit | |
TF-FCP-1224-01086 | Approved | 12/16/2024 | N/A | Fire Construction Permit | MODIFY THE EXISTING BUILDING FIRE ALARM SYSTEM FOR THE BUMCT - SPD LAB TRAILER ADDITION - NORTH TOWER - 1st FLOOR PROJECT. | |
T21FC00918 | Expired | 12/15/2021 | 05/03/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM.; Commercial Fire Sprinkler Systems - Standpipe New Outlets: 1 | |
TF-FCP-1224-01060 | Complete | 12/09/2024 | 06/12/2025 | Fire Construction Permit | EXPEDITE - Add 1 pendent for new doorway added in corridor. | |
TC-CFO-1224-00242 | Complete | 12/06/2024 | 01/08/2025 | Certificate of Occupancy | TCO ISSUED The scope of work for this project is completed and an existing set of exterior doors needs to now be replaced. We are requesting a TCO Level 4 for a 180 days to allow for Patient use of the space and once the doors are replaced we will submit for C of O. | |
TF-FCP-1224-01047 | Inspections | 12/05/2024 | 06/11/2025 | Fire Construction Permit | Relocate 4 pendents for new room configuration | |
TC-CFO-1224-00238 | Issued | 12/04/2024 | 01/08/2025 | Certificate of Occupancy | A Level 4 TCO is requested for this project that consists of a temporary, wood walk-way and utility connections for a Steris Mobile SPD Trailer System. The Trailer is installed in the parking area just west of the Main Hospital, outside of the Main Lab in Tower 3 and 4. An additional permit has been required by TFD for the integration of the existing Fire Alarm System in the Mobile Trailer to reflect on the Hospitals Front-End. While that permit is being processed a TCO has been suggested by TFD as to not impact Banner operations. | |
TC-CFO-1122-00006 | Complete | 11/22/2022 | 12/28/2022 | Certificate of Occupancy | Full occupancy for 7W | |
TF-FOP-1124-01349 | Void | 11/21/2024 | N/A | Fire Operational Permit | VOID-Duplicate Permit#TF-FOP-1124-01278 - I2 Hospital 649 beds | |
TF-FCP-1124-00992 | Complete | 11/20/2024 | 06/03/2025 | Fire Construction Permit | Relocate 5 Sprinkler Heads | |
TF-FCP-1124-00994 | Needs Resubmittal | 11/20/2024 | N/A | Fire Construction Permit | Attach pre engineered Mobile SPD trailer to existing Fire Alarm | |
TF-FCP-1122-00118 | Complete | 11/18/2022 | N/A | Fire Construction Permit | Description; Job, Banner 6E Modification of existing wet fire sprinkler system | |
T19CM08437 | Expired | 11/14/2019 | 07/21/2021 | Commercial Building | E - 3RD PACKAGE; RENOVATION OF EXISTING TOWER | |
TF-FCP-1122-00047 | Complete | 11/08/2022 | 04/24/2025 | Fire Construction Permit | Modify sprinkler system by removing and replacing mains and branchlines. Adding and relocating 361 sprinklers. | |
TC-CFO-1124-00226 | Issued | 11/07/2024 | 01/08/2025 | Certificate of Occupancy | C OF O ISSUED. PLEASE REQUEST TCO REFUND UNDER TC-CFO-1124-00226 The Work of this portion of the Project, includes the interior renovation on the first floor of Banner University Medical Center in Tucson, Arizona. | |
TC-CFO-1124-00223 | Denied | 11/06/2024 | N/A | Certificate of Occupancy | This project needs the okay for a Temporary Certificate of Occupancy from an Engineering Inspector and the TCO level for the building. Please schedule SITE - Engineering Final inspection. Once you get the okay from Engineering please re-request TCO. The Work of this portion of the Project, includes the interior renovation on the first floor of Banner University Medical Center in Tucson, Arizona. We are requesting a Temp C of O Level 3 in order for the owner to move in equipment and supplies. Lacking a final test and balance for the space and hope to have this by the end of November. | |
TF-FOP-1124-01278 | Fees Paid | 11/05/2024 | N/A | Fire Operational Permit | Annual fire permit for Banner Health Tucson Central hospital I-2 679 Beds | |
TC-CFO-1124-00221 | Inspections Complete | 11/04/2024 | 12/05/2024 | Certificate of Occupancy | THE PROPOSED PROJECT CONSISTS OF RENOVATIONS TO THE EXISTING AND VACANT DIAMOND CHILDREN'S HOSPITAL LOBBY (IN TOWER 3, PREVIOUSLY SERVING TOWER 2 OF BUMC-T). SCOPE OF WORK IS APPROXIMATELY 7,500 SF ON THE FIRST FLOOR OF TOWER 3. THE SCOPE OF THIS PROJECT IS MOSTLY INTERIOR FINISHES WITH TWO MODIFICATIONS TO THE EXTERIOR WALL. SCOPE INCLUDES ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL. | |
TC-CFO-1124-00222 | Issued | 11/04/2024 | 12/05/2024 | Certificate of Occupancy | SCOPE OF WORK IS LIMITED TO TWO AREAS: INSPIRATION GARDEN AND THE EXTERIOR PLAYZONE PLAYSPACE. INSPIRATION GARDEN IS AN EXISTING SPACE THAT WILL RECEIVE NEW HARDSCAPE, PLANTINGS, AND SEATING. ACCESS AND PERIMETER FENCING, WALLS, ETC ARE EXISTING TO REMAIN. NO AREA OR USE CHANGES TO THIS SPACE. SCOPE ARE IS APPROXIMATELY 6,500 SF. PLAYZONE EXTERIOR PLAYSPACE IS A RENOVATION OF THE EXISTING, NO USED, OLD ENTRANCE TO DIAMOND CHILDRENS. THE SPACE IS CURRENTLY NOT BEING USED AND DOES NOT PROVIDE ACCESS TO THE BUILDING. THIS 1,300 SF RENOVATION WILL PROVIDE A SECURE EXTERIOR PLAYSPACE THAT SUPPORTS THE REMODELED INTERIOR SPACE. THERE WILL BE EXTERNAL ACCESS TO THIS SPACE, IT SOLELY SUPPORTS THE PROGRAM OF THE INTERIOR SPACE AND PROVIDES EMERGENCY EXITING. SCOPE OF WORK INCLUDES CIVIL, ARCHITECTURAL, ELECTRICAL AND LANDSCAPE SCOPES. SCOPE OF WORK IS CONFINED TO THESE TWO SPACES. ALL WORK IS EXTERIOR TO THE BUILDING - NO INTERIOR MODIFICATIONS AS PART OF THIS PROJECT. | |
TF-FCP-1122-00034 | Complete | 11/03/2022 | N/A | Fire Construction Permit | State License I-2 Banner Hospital Outdoor Fuel tank | |
TF-FOP-1122-00029 | Complete | 11/03/2022 | 11/07/2023 | Fire Operational Permit | State License I-2 Banner Hospital 642 Beds | |
TF-FOP-1122-00030 | Complete | 11/03/2022 | 03/05/2024 | Fire Operational Permit | State License I-2 Banner Heliport | |
TF-FOP-1122-00019 | Complete | 11/02/2022 | 03/05/2024 | Fire Operational Permit | Compressed Gas Permit | |
TC-COM-1124-02102 | Approved | 11/01/2024 | 04/30/2025 | Commercial Building | The scope of this project consists of the following: 1. New CT, Control Room, Supply, and Equipment will occupy 838 SF of the existing shell space. 2. The total remodeled area of existing Corridor is 234 SF. 3. The total remodeled area of existing Control Room is 142 SF. 4. The ADD ALT Patient Hold will occupy 327 SF of existing shell space. 5. The new CT to be comprised of the following: a. (1) Class 1 CT and its associated support spaces. b. (1) Shared Control Room with existing CT. c. (1) Equipment Room for New CT. d. (1) Clean Supply e. (1) Equipment Room with (6) lockers. f. (1) Equipment Alcove. g. (1) CT Sub Waiting Alcove. | |
TF-FOP-1124-01249 | Void | 11/01/2024 | N/A | Fire Operational Permit | VOID-Submit a Fire State Licensed Facility Permit - Fire Permit for hospital operation | |
T19FC00861 | Expired | 10/17/2019 | 10/20/2020 | Fire Construction Permit | Automatic Fire Extingshing Sys - Modify Existing wet Pipe system; Commercial Fire Sprinkler Systems - Modification of heads: 4 | |
TR-ROW-1024-01200 | Void | 10/14/2024 | N/A | Right-of-Way (ROW) | Vacuum truck to remove dirt 3' down, to fix a reclaimed waterline/irrigation line, for the U of A. | |
TC-COM-1024-01962 | In Review | 10/11/2024 | 04/09/2025 | Commercial Building | The scope of this project consists of the following: 1. New Peds ED will occupy approximately 7,910 SF of the existing shell space. 2. The total remodeled area of existing ED is about 5,470 SF. 3. Separate Peds from Adults Entrance, Vestibule and Waiting. 4. The new Peds ED to be comprised of the following: a. (22) Treatments rooms. b. (1) Isolation/Treatment room with private TLT. c. (1) Play / Observation space with a family TLT. d. (1) Centrally located Nurse Station. e. Dictation space, adjacent to the Nurse Station, with room for (5) workstations. f. Support spaces as required by the program. 5. A new Peds Waiting Room to accommodate up to 32 visitors 6. The existing Waiting Room will expand to accommodate up to 60 visitors for Adult ED. 7. New registration will be placed between the two new Waiting Spaces. 8. The new result waiting will accommodate up to 18 patients. 9. Additional Toilets will be provided to meet code requirement. | |
TC-COM-0923-02293 | Complete | 09/27/2023 | 08/26/2024 | Commercial Building | ADD POWER AND CONTROLS FOR TWO ENTRY GATES AND ONE EXIT GATE. | |
TC-COM-0923-02280 | Void | 09/26/2023 | 03/24/2024 | Commercial Building | VOID - WRONG WORK CLASS -Please resubmit utilizing the Commercial Trade Work Class ADD POWER AND CONTROLS FOR TWO ENTRY GATES AND ONE EXIT GATE | |
TC-COM-0924-01819 | Issued | 09/19/2024 | 06/17/2025 | Commercial Building | Phase 2 New roof paver system and re-roofing at North Tower Expansion Level 2 pedestrian deck | |
TC-COM-0923-02229 | Void | 09/19/2023 | 03/17/2024 | Commercial Building | *VOID: YL-Unable to process. According to the plans submitted please apply for a Commercial Addition/Alteration Permit. This permit will be voided as it is not the correct permit type. * -ADD POWER AND CONTROLS FOR TWO ENTRY GATES AND ONE EXIT GATE | |
TF-FCP-0923-01094 | Expired | 09/11/2023 | 03/28/2024 | Fire Construction Permit | Remove existing pendent sprinklers and add new upright sprinklers for coverage in new IDF room. | |
T22CM06674 | Issued | 08/29/2022 | 05/12/2025 | Commercial Building | This project consists of replacing the main lab located on the basement and first floors of the exis | |
TD-DEV-0823-00368 | Issued | 08/21/2023 | 03/19/2027 | Development Package | Restricted Access - New exterior kid playzone | |
TC-DMO-0824-00184 | Fees Paid | 08/20/2024 | N/A | Demolition Permit | Phase 1 Demolition scope of work is selective demolition of walk deck and roofing pavers systems at the North Expansion Tower 3 & 4. | |
TC-COM-0823-02016 | Complete | 08/18/2023 | 06/09/2025 | Commercial Building | THE PROPOSED PROJECT CONSISTS OF RENOVATIONS TO THE EXISTING AND VACANT DIAMOND CHILDREN'S HOSPITAL LOBBY (IN TOWER 3, PREVIOUSLY SERVING TOWER 2 OF BUMC-T). SCOPE OF WORK IS APPROXIMATELY 7,500 SF ON THE FIRST FLOOR OF TOWER 3. THE SCOPE OF THIS PROJECT IS MOSTLY INTERIOR FINISHES WITH TWO MODIFICATIONS TO THE EXTERIOR WALL. SCOPE INCLUDES ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL. | |
TC-COM-0823-01947 | Issued | 08/09/2023 | 06/02/2025 | Commercial Building | SCOPE OF WORK IS LIMITED TO TWO AREAS: INSPIRATION GARDEN AND THE EXTERIOR PLAYZONE PLAYSPACE. INSPIRATION GARDEN IS AN EXISTING SPACE THAT WILL RECEIVE NEW HARDSCAPE, PLANTINGS, AND SEATING. ACCESS AND PERIMETER FENCING, WALLS, ETC ARE EXISTING TO REMAIN. NO AREA OR USE CHANGES TO THIS SPACE. SCOPE ARE IS APPROXIMATELY 6,500 SF. PLAYZONE EXTERIOR PLAYSPACE IS A RENOVATION OF THE EXISTING, NO USED, OLD ENTRANCE TO DIAMOND CHILDRENS. THE SPACE IS CURRENTLY NOT BEING USED AND DOES NOT PROVIDE ACCESS TO THE BUILDING. THIS 1,300 SF RENOVATION WILL PROVIDE A SECURE EXTERIOR PLAYSPACE THAT SUPPORTS THE REMODELED INTERIOR SPACE. THERE WILL BE EXTERNAL ACCESS TO THIS SPACE, IT SOLELY SUPPORTS THE PROGRAM OF THE INTERIOR SPACE AND PROVIDES EMERGENCY EXITING. SCOPE OF WORK INCLUDES CIVIL, ARCHITECTURAL, ELECTRICAL AND LANDSCAPE SCOPES. SCOPE OF WORK IS CONFINED TO THESE TWO SPACES. ALL WORK IS EXTERIOR TO THE BUILDING - NO INTERIOR MODIFICATIONS AS PART OF THIS PROJECT. | |
TF-FCP-0823-00948 | Complete | 08/08/2023 | 02/24/2024 | Fire Construction Permit | Install one new Notifier fire alarm and voice evacuation system | |
TC-COM-0823-01886 | Complete | 08/02/2023 | 06/09/2025 | Commercial Building | The Work of this portion of the Project, includes the interior renovation on the first floor of Banner University Medical Center in Tucson, Arizona. | |
T20FC00477 | Expired | 07/17/2020 | 08/31/2021 | Fire Construction Permit | Automatic Fire Extingshing Sys - *** NO PLANS *** two head relocate; Commercial Fire Sprinkler Systems - Modification of heads: 2 | |
T21CM05770 | Expired | 07/14/2021 | 03/02/2022 | Commercial Building | Equipment replacement. Scope includes architectural and structural scopes. | |
TF-FCP-0724-00554 | Complete | 07/11/2024 | 02/01/2025 | Fire Construction Permit | Banner Acute Care TI - Level 1 Area B Floor Plan. Provide duct detectors, speaker strobes, and test switches to Acute Care TI | |
TC-COM-0624-01267 | Inspections Complete | 06/28/2024 | 06/09/2025 | Commercial Building | This 100 sf renovation to the Emergency Department includes adding a new smoke partition and single door. | |
TF-FCP-0624-00485 | Complete | 06/24/2024 | 01/30/2025 | Fire Construction Permit | modify the existing fire alarm system | |
TF-FCP-0624-00478 | Inspections | 06/19/2024 | 01/03/2025 | Fire Construction Permit | Upgrade CPU and power supplies on Node 12. Remaining cards to stay the same. | |
TC-COM-0524-01041 | Inspections | 05/29/2024 | 05/20/2025 | Commercial Building | Conversion of 6th floor (north) to MOSU. These modifications increase the quantity of patient rooms capable of receiving BMT patients. | |
TF-FCP-0524-00408 | Complete | 05/29/2024 | 02/05/2025 | Fire Construction Permit | Add protection to a temporary trailer with a egress ramp, and temporary relocate FDC for zone 4 | |
TF-FCP-0524-00398 | Complete | 05/22/2024 | 11/30/2024 | Fire Construction Permit | BUMCT Main Lab Replacement CO#14 | |
T22FC00351 | Expired | 05/18/2022 | 06/06/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - Modify existing fire sprinkler system to conform to new floor plan.; Commercial Fire Sprinkler Systems - Modification of heads: 79 | |
TC-COM-0524-00935 | Inspections Complete | 05/15/2024 | 03/18/2025 | Commercial Building | PROJECT: (3) COLUMNS & (1) SAIL, APPROX. (235) TOTAL SF OF SHADE | |
TF-FOP-0523-00967 | Complete | 05/02/2023 | 05/12/2023 | Fire Operational Permit | 40'x100' standard white tent anchored by water ballast | |
TC-DMO-0423-00096 | Complete | 04/20/2023 | 03/20/2024 | Demolition Permit | SELECTIVE DEMOLITION FOR EXPLORATORY/DOCUMENTATION. OCCUR IN CEILING TO OBSERVE ABOVE CEILING CONDITIONS SUCH AS WALL CONSTRUCTION & RATING INTEGRITY, BUILDING SYSTEMS CONDITIONS & STRUCTURAL CONFIGURATIONS OF MEDICAL BOOM MOUNTS. | |
T22CM02645 | Issued | 04/12/2022 | 01/08/2024 | Commercial Building | Fit out of two existing shell spaces to operating rooms within Tower 1 of Banner Health Medical Cent | |
TF-FCP-0424-00264 | Complete | 04/03/2024 | 11/08/2024 | Fire Construction Permit | Relocate existing sprinkler drops throughout renovated area. | |
TF-FCP-0423-00550 | Complete | 04/03/2023 | N/A | Fire Construction Permit | Replace 4 and modify 2 sprinkler heads | |
TF-FCP-0423-00551 | Complete | 04/03/2023 | N/A | Fire Construction Permit | Relocate 5 Sprinkler Heads | |
T19CM01996 | Expired | 03/20/2019 | 11/01/2020 | Commercial Building | E - BUMCT RENOVATION PACKAGE #2-CONSTRUCTION PACKAGE | |
TZ-PMT-0324-00019 | Complete | 03/13/2024 | 05/20/2025 | Zoning Permit Annual | -THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4. | |
T21CM01700 | Expired | 02/26/2021 | 10/02/2021 | Commercial Building | Renovation of 1,778 SF of existing storage spaces within Tower 4 of Banner Hospital to new IDF rooms | |
TF-FCP-0224-00128 | Complete | 02/19/2024 | 09/22/2024 | Fire Construction Permit | Relocate 45 Add 3 Sprinkler Heads | |
T22CM01071 | Expired | 02/11/2022 | 08/13/2022 | Commercial Building | Fire pump replacement in Tower 3 | |
T22FC00099 | Expired | 02/08/2022 | 05/03/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - Modify existing fire sprinkler system to conform to new floor plan.; Commercial Fire Sprinkler Systems - Modification of heads: 5 | |
TC-FBB-0224-00011 | Issued | 02/05/2024 | 06/04/2025 | Factory Built Buildings | -THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4. | |
T22CM00861 | Complete | 02/04/2022 | 10/31/2023 | Commercial Building | Remodel Tower 4 6E and 7W Med/Surg Nursing Units | |
TC-COM-0224-00223 | Void | 02/01/2024 | N/A | Commercial Building | *VOID: YL-Unable to process, wrong permit type. Submit a new application under Temporary Structures Permit. This permit will be voided as it is not the correct permit type. * -THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4. | |
TC-COM-0223-00567 | Issued | 02/01/2023 | 12/13/2024 | Commercial Building | Equipment replacement of an existing MRI Equipment with minor renovations of finishes within MRI Exam Room #3 within Tower #1 of the Banner University Medical Center Campus. | |
T22FC00059 | Expired | 01/25/2022 | 05/03/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - Replacement of a existing fire protection pump.; Commercial Fire Pumps and Related Equipment - New Pumps: 1 | |
T20CM00263 | Expired | 01/14/2020 | 04/26/2021 | Commercial Building | TI - STORAGE | |
TC-COM-0123-00423 | Complete | 01/05/2023 | 12/03/2023 | Commercial Building | This project will replace the existing X-Ray equipment with new X-Ray equipment on the first floor of the hospital. The project will also include new interior finishes, electrical and HVAC ceiling fixtures, and plumbing for a new hand wash sink. | |
TC-CFO-0124-00003 | Issued | 01/04/2024 | 02/01/2025 | Certificate of Occupancy | Replacement of the the Main Lab located on the Basement, Low Roof and Level 1 of the existing Tower 4 - Area B and C only. Tower 3 - Area A will be turned over separately. | |
T22CM00014 | Expired | 01/03/2022 | 08/15/2022 | Commercial Building | This submission is for demolition work only. This project consists of replacing the main lab located | |
T16CM02176 | C OF O | 03/23/2016 | 10/07/2020 | COMBO | NEW HOSPITAL | |
T18CM08866 | L OF C | 11/06/2018 | 05/24/2020 | COMBO | E- FIT-OUT OF SHELLED AREAS: LEVEL 3 PACU/OR 15 & 23, AND TOWER 4 LEVEL 9 PATIENT WING | |
T19CM07933 | FINAL | 10/28/2019 | 09/21/2020 | COMBO | RENOVATION | |
T19CM08434 | VOID | 11/14/2019 | N/A | COMBO | E - BUMCT RENOVATION PACKAGE #2-CONSTRUCTION PACKAGE | |
T19FC00811 | FINAL | 09/30/2019 | 07/05/2020 | FIRECONS | Modify existing wet pipe fie sprinkler system. | |
T19FO00975 | FINAL | 11/06/2019 | 05/04/2020 | FIREOPER | 625 BEDS | |
T19FO00976 | FINAL | 11/06/2019 | 11/05/2020 | FIREOPER | COMPRESSED GAS | |
T20CM02240 | L OF C | 04/13/2020 | 08/21/2021 | COMBO | TI: Remodel Pediatric Hematology & Oncology at UMC | |
T20CM02241 | FINAL | 04/13/2020 | 08/02/2021 | COMBO | TI: RELOCATE GYM IN HOSPITAL WORK IS IN TOWER 3 | |
T20CM02432 | FINAL | 04/20/2020 | 11/22/2021 | COMBO | TI LAB SPACE ON LEVEL 3 | |
T20FC00461 | FINAL | 07/14/2020 | 06/06/2021 | FIRECONS | TI - 30 Head | |
T20FC00510 | FINAL | 08/04/2020 | 04/20/2021 | FIRECONS | Modify existing wet pipe Fire Sprinkler System | |
T20FC00618 | FINAL | 09/22/2020 | 08/21/2021 | FIRECONS | REPLACE ALL HEADS WITHIN AREA OF WORK ON LEVEL-2 | |
T21CM00169 | FINAL | 01/06/2021 | 02/13/2022 | COMBO | TI: HOSPITAL | |
T21CM04454 | L OF C | 05/26/2021 | 02/13/2023 | COMBO | Remodel 2 med/surg nursing units on 3 East and 4 West Sections of BUMC Tower 4 | |
T21FC00211 | FINAL | 03/19/2021 | 02/07/2022 | FIRECONS | Modify existing wet pipe fire sprinkler system | |
T21FC00488 | FINAL | 06/17/2021 | 06/28/2022 | FIRECONS | Replacement of a existing fire protection pump | |
T21FC00696 | FINAL | 09/13/2021 | 07/13/2022 | FIRECONS | Modify existing wet pipe fire sprinkler system. | |
T21FC00697 | FINAL | 09/13/2021 | 08/03/2022 | FIRECONS | Modify existing wet pipe fire sprinkler system. | |
T21FO00016 | FINAL | 01/06/2021 | 02/25/2022 | FIREOPER | BANNER UMC 649 BEDS | |
T21FO00873 | FINAL | 12/13/2021 | 07/19/2022 | FIREOPER | BANNER UMC 649 BEDS | |
T22BU00001 | VOID | 01/03/2022 | N/A | DEMO | This submission is for demolition work only. This project consists of replacing the main lab located on the basement and first floors of the existing medical center and relocating it to the vacated radiology space on the first floor. | |
T22FC00265 | FINAL | 04/12/2022 | 04/15/2023 | FIRECONS | 3RD FLOOR - Relocate 12 sprinklers for new operating rooms. | |
T22FC00272 | FINAL | 04/12/2022 | 11/05/2022 | FIRECONS | BANNER HEALTH MECH RM AHU 15, 16, * 18 - Removal/Demo of (3) Duct Detectors from AHU 15, 16, & 18 as units are being removed. | |
T22FC00390 | FINAL | 06/06/2022 | 01/08/2023 | FIRECONS | Modify existing fire sprinkler system to conform to new floor plan. | |
T22FC00556 | FINAL | 08/10/2022 | 04/18/2023 | FIRECONS | Modify existing fire sprinkler system to conform to new floor plan. |
Plans
Address: 1625 N CAMPBELL AV
Date - 12/24/2024 6:04 p.m.
Total Number Of Plans - (1)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
S20-057 | Approved | 09/23/2020 | N/A | -- Subdivision/Plats | BANNER UNIVERSITY MEDICAL CTR |
Record Requests
Address: 1625 N CAMPBELL AV
Date - 12/24/2024 6:04 p.m.
Total Number Of Requests - (18)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0124-00858 | Complete | 01/30/2024 | 01/31/2024 | Requests | Replacement of the the Main Lab located on the Basement, Low Roof and Level 1 of the existing Tower 4 - Area B and C only. Tower 3 - Area A will be turned over separately. |
REQ-0124-00913 | Complete | 01/31/2024 | 01/31/2024 | Requests | REQ-0124-00858 duplicate request -Replacement of the the Main Lab located on the Basement, Low Roof and Level 1 of the existing Tower 4 - Area B and C only. Tower 3 - Area A will be turned over separately. |
REQ-0224-01601 | Complete | 02/26/2024 | 03/15/2024 | Requests | THE PROPOSED PROJECT CONSISTS OF RENOVATIONS TO THE EXISTING AND VACANT DIAMOND CHILDREN'S HOSPITAL LOBBY (IN TOWER 3, PREVIOUSLY SERVING TOWER 2 OF BUMC-T). SCOPE OF WORK IS APPROXIMATELY 7,500 SF ON THE FIRST FLOOR OF TOWER 3. THE SCOPE OF THIS PROJECT IS MOSTLY INTERIOR FINISHES WITH TWO MODIFICATIONS TO THE EXTERIOR WALL. SCOPE INCLUDES ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL. |
REQ-0224-01602 | Complete | 02/26/2024 | 03/13/2024 | Requests | SCOPE OF WORK IS LIMITED TO TWO AREAS: INSPIRATION GARDEN AND THE EXTERIOR PLAYZONE PLAYSPACE. INSPIRATION GARDEN IS AN EXISTING SPACE THAT WILL RECEIVE NEW HARDSCAPE, PLANTINGS, AND SEATING. ACCESS AND PERIMETER FENCING, WALLS, ETC ARE EXISTING TO REMAIN. NO AREA OR USE CHANGES TO THIS SPACE. SCOPE ARE IS APPROXIMATELY 6,500 SF. PLAYZONE EXTERIOR PLAYSPACE IS A RENOVATION OF THE EXISTING, NO USED, OLD ENTRANCE TO DIAMOND CHILDRENS. THE SPACE IS CURRENTLY NOT BEING USED AND DOES NOT PROVIDE ACCESS TO THE BUILDING. THIS 1,300 SF RENOVATION WILL PROVIDE A SECURE EXTERIOR PLAYSPACE THAT SUPPORTS THE REMODELED INTERIOR SPACE. THERE WILL BE EXTERNAL ACCESS TO THIS SPACE, IT SOLELY SUPPORTS THE PROGRAM OF THE INTERIOR SPACE AND PROVIDES EMERGENCY EXITING. SCOPE OF WORK INCLUDES CIVIL, ARCHITECTURAL, ELECTRICAL AND LANDSCAPE SCOPES. SCOPE OF WORK IS CONFINED TO THESE TWO SPACES. ALL WORK IS EXTERIOR TO THE BUILDING - NO INTERIOR MODIFICATIONS AS PART OF THIS PROJECT. |
REQ-0324-01890 | Complete | 03/07/2024 | 03/12/2024 | Requests | SELECTIVE DEMOLITION FOR EXPLORATORY/DOCUMENTATION. OCCUR IN CEILING TO OBSERVE ABOVE CEILING CONDITIONS SUCH AS WALL CONSTRUCTION & RATING INTEGRITY, BUILDING SYSTEMS CONDITIONS & STRUCTURAL CONFIGURATIONS OF MEDICAL BOOM MOUNTS. |
REQ-0523-02501 | Denied | 05/03/2023 | N/A | Requests | The Project is not complete all related permits need to be in completed status TF-FCP-1122-00118. Please re-request once all associated projects are in completed status - please issue LofC |
REQ-0523-02747 | Complete | 05/16/2023 | 05/22/2023 | Requests | Fire permit has now been completed, please issue appropriate closeout document |
REQ-0524-03686 | Approved | 05/15/2024 | 06/14/2024 | Requests | Modify sprinkler system by removing and replacing mains and branchlines. Adding and relocating 361 sprinklers. -CONSTRUCTION IS STILL ONGOING |
REQ-0623-03220 | Complete | 06/09/2023 | 06/13/2023 | Requests | This project will replace the existing X-Ray equipment with new X-Ray equipment on the first floor of the hospital. The project will also include new interior finishes, electrical and HVAC ceiling fixtures, and plumbing for a new hand wash sink. |
REQ-0624-04291 | Complete | 06/13/2024 | 06/26/2024 | Requests | Equipment replacement of an existing MRI Equipment with minor renovations of finishes within MRI Exam Room #3 within Tower #1 of the Banner University Medical Center Campus. |
REQ-1024-07034 | Complete | 10/15/2024 | 10/16/2024 | Requests | Replacement of the the Main Lab located on the Basement, Low Roof and Level 1 of the existing Tower 4 - Area B and C and including Tower 3 - Area A. Due to the phasing of this project, with TCO, a demising wall will be removed to allow for final TAB as required for Substantial Completion of the entire space. This TCO extension duration will for 30 days. CofO will be requested on 10/31/24. |
REQ-1124-07793 | Submitted - Online | 11/15/2024 | N/A | Requests | THE PROPOSED PROJECT CONSISTS OF RENOVATIONS TO THE EXISTING AND VACANT DIAMOND CHILDREN'S HOSPITAL LOBBY (IN TOWER 3, PREVIOUSLY SERVING TOWER 2 OF BUMC-T). SCOPE OF WORK IS APPROXIMATELY 7,500 SF ON THE FIRST FLOOR OF TOWER 3. THE SCOPE OF THIS PROJECT IS MOSTLY INTERIOR FINISHES WITH TWO MODIFICATIONS TO THE EXTERIOR WALL. SCOPE INCLUDES ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL. |
REQ-1124-07807 | Complete | 11/18/2024 | 11/25/2024 | Requests | Replacement of the the Main Lab located on the Basement, Low Roof and Level 1 of the existing Tower 4 - Area B and C only. Tower 3 - Area A will be turned over separately. |
REQ-1224-08269 | Complete | 12/05/2024 | 12/05/2024 | Requests | The Work of this portion of the Project, includes the interior renovation on the first floor of Banner University Medical Center in Tucson, Arizona. |
REQ-1224-08346 | Complete | 12/09/2024 | 12/09/2024 | Requests | TCO ISSUED The Work of this portion of the Project, includes the interior renovation on the first floor of Banner University Medical Center in Tucson, Arizona. |
REQ-1224-08358 | Approved | 12/09/2024 | 12/22/2024 | Requests | C OF O ISSUED. PLEASE REQUEST TCO REFUND UNDER TC-CFO-1124-00226 The Work of this portion of the Project, includes the interior renovation on the first floor of Banner University Medical Center in Tucson, Arizona. |
REQ-1224-08515 | Complete | 12/13/2024 | 12/13/2024 | Requests | THE PROPOSED PROJECT CONSISTS OF RENOVATIONS TO THE EXISTING AND VACANT DIAMOND CHILDREN'S HOSPITAL LOBBY (IN TOWER 3, PREVIOUSLY SERVING TOWER 2 OF BUMC-T). SCOPE OF WORK IS APPROXIMATELY 7,500 SF ON THE FIRST FLOOR OF TOWER 3. THE SCOPE OF THIS PROJECT IS MOSTLY INTERIOR FINISHES WITH TWO MODIFICATIONS TO THE EXTERIOR WALL. SCOPE INCLUDES ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL. |
REQ-1224-08598 | Complete | 12/17/2024 | 12/18/2024 | Requests | Replacement of the the Main Lab located on the Basement, Low Roof and Level 1 of the existing Tower 4 - Area B and C and Tower 3 - Area A. This extension request if for an additional 30-days to allow for the final Test and Balance of all Areas. |