Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
211 N 4TH AV
Apply Date:
03/29/2022
Applicant:
Description:
Foundation Only for Future Apartment Building

Permit Reviews

Permit Number - T22CM02219
Permit Status: Issued
Permit Description: Foundation Only for Future Apartment Building
Start Date Submittal Complete Date Status  
03/29/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 04/27/2022 COMPLETED Review Details
05/23/2022 RESUBMITTAL 06/14/2022 COMPLETED Review Details
06/24/2022 RESUBMITTAL 07/18/2022 COMPLETED Review Details
08/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/20/2024 REQUIRES RESUBMIT Review Details
09/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/23/2024 APPROVED Review Details
09/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/01/2024 APPROVED Review Details

Conditions

Permit Number - T22CM02219
Permit Status: Issued
Permit Description: Foundation Only for Future Apartment Building
Date Description Comments
07/17/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/17/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/17/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
07/17/2024 NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER MANHOLES ARE ACCEPTED AND RELEASED BY PCRWRD
07/16/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
10/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/17/2024 SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED.
07/17/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
07/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/17/2024 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02219
Permite Description: Foundation Only for Future Apartment Building
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
09/29/2023 COT - HCBU - Masonry Pregrout N/A Not Ready Contractor cancelled.
01/18/2024 COT - HCBU - Interior Shear Bracing N/A Partial Pass Level #10. Area C, Mechanical, Electrical, Plumbing in units 1023, 1025, 1026, 1027, 1027 (except for kitchen duct system)
10/23/2023 COT - LCBU - Preslab N/A Not Ready Contractor cancelled, will reschedule for 25 October.
10/04/2023 COT - LCEL - Electrical Progress N/A Partial Pass Level #5, Batch C Mechanical, Electrical, Plumbing in rooms 530, 531, 532. Ok to Sheetrock progress areas.
10/26/2022 COT - LCEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - LCEL - Temporary Service N/A Not Ready
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
03/27/2024 COT - HCBU - Building Progress N/A Partial Pass Level #3 corridors above ceiling. Ensure All penetrations are properly Fire caulked.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02219
Permit Description: Foundation Only for Future Apartment Building
Total Completed Inspections - 16
Date Description Inspector Results Comments
07/12/2023 COT - LCPL - Rough Soil Passed
03/11/2024 COT - HCBU - Masonry Pregrout Passed Pool/spa area is complete. Fire place topped out; Ok to grout progress areas.
07/15/2024 COT - HCBU - Interior Shear Bracing Passed
07/15/2024 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
07/15/2024 COT - LCBU - Preslab Passed
07/15/2024 COT - LCEL - Electrical Progress Passed
07/15/2024 COT - LCEL - Electrical Final Passed
07/15/2024 COT - LCEL - Construction Power Passed
07/15/2024 COT - LCEL - Grounding/Bonding Passed
07/15/2024 COT - LCEL - Temporary Service Passed
07/15/2024 COT - LCEL - Electrical Underground Passed
07/15/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
07/15/2024 BULD - Electrical Clearance Passed No clearance required.
07/15/2024 COT - BULD - SWG Clearance Passed No clearance required.
07/15/2024 COT - HCBU - TCO Passed TCO is not required to.
07/16/2024 COT - HCBU - Building Progress Passed

Documents

File Name Document Type  
FINAL SIC 2219_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTIONS LETTER FOR CITY OF TUCSON - SIGNED-2024-09-20_V2.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
APPROVED DP FOR REFERENCE ONLY.PDF DOCUMENTS VIEW
GEO TECH.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW
STRUC CALCS.PDF DOCUMENTS VIEW