Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCEL - Electrical Underground
Permit Number - T22CM02219
Inspection Description - COT - LCEL - Electrical Underground
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCEL - Electrical Underground | Not Ready | ||
09/27/2022 | COT - LCEL - Electrical Underground | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Conduits for Temporary Power (1 1/2" - 4" conduits). Ok to cover progress areas. |
09/21/2022 | COT - LCEL - Electrical Underground | JBURGE | Partial Approval | Entered by VVERA1 - Partial. 4” conduits (4 each), for building and tower cranes. Ok to cover progress areas. |
01/03/2023 | COT - LCEL - Electrical Underground | Partial Pass | Eight 2” electrical conduits at GL: M.E - N/11 - 14. Ok to cover progress areas. | |
01/05/2023 | COT - LCEL - Electrical Underground | Partial Pass | Eight each 2” conduits at GL: M - M.3/10. Ok to cover progress areas. | |
01/13/2023 | COT - LCEL - Electrical Underground | Partial Pass | Secondary service conduit lines (12) each 6” conduits from electric room to transformer in Nevada area and 12 lines from transformer to electric room in Colorado area. OK to cover progress areas. | |
07/15/2024 | COT - LCEL - Electrical Underground | Passed | ||
11/22/2022 | COT - LCEL - Electrical Underground | Partial Pass | Conduit lines into grease interceptor pumping system | |
11/23/2022 | COT - LCEL - Electrical Underground | Partial Pass | Conduits (2 each at 2”) for pumping system to drainage area. Ok to cover progress areas. | |
12/20/2022 | COT - LCEL - Electrical Underground | Partial Pass | Colorado East central section; 8 each 3” electric conduits. Ok to cover progress areas. | |
12/22/2022 | COT - LCEL - Electrical Underground | Partial Pass | 8 each 2’ conduits in Colorado area; GL; 15/M - Q; M.3/13-15. Ok to cover progress areas. | |
12/27/2022 | COT - LCEL - Electrical Underground | Canceled | Contractor cancelled inspection. |