Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
Permit Number - T22CM02219
Inspection Description - COT - LCBU - Excavation/Rebar/Zoning
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCBU - Excavation/Rebar/Zoning | Not Ready | ||
10/20/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Columns at GL: G/5 CC4, CF16-6. CC4 CF16-04 at GL: H/6.6 - 7. Concrete wall at GL: 6.5/H - J. OK to form up and place concrete in progress areas. |
10/19/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by VVERA1 - Partial. Column footings at CF6-0A (16’ 6’ x 10’6” x 4’6”; CF6-16A (16’ x 30’ x 4’6”. Columns: CC4 at GL: G/6, CC4 at GL: G/7, CC4 at GL:H/7, CC1 at GL: H/6.6. OK to place concrete in progress areas. |
10/18/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Retaining wall at GL: 8.5/G - H; shear wall at GL: 12.1/N - P. OK to place concrete in progress areas. |
10/17/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by VVERA1 - Partial. Double rebar mat at GL; 3 - 4/G.6 - F.8. Columns at GL: 4.4/G.6; 3-4/G.5; 3 - 4/G.6 (F27-6). Ok to place concrete in progress areas. |
10/14/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Footing #WF 3-6; Mat #10 with 2 each #CC8 Columns; Mat #9 with 3 each CC8 column footings and 1 CC 13 column footing. Column footing CF-0A with 1 each column footing CC9 and CC13. Ok to place concrete in progress areas. |
10/13/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Rebar mat: CF-16OA, 16’ x 30’ x 4’ 6” at GL: J/6.6 - 7. Columns : CC1 at GL: 16/K; CC4 at GL: 17/L. Ok to place concrete in progress areas. |
10/13/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Rebar mat: CF-16OA, 16’ x 30’ x 4’ 6" at GL: J/6.6 - 7. Columns : CC1 at GL: 16/K; CC4 at GL: 17/L. Ok to place concrete in progress areas. |
10/11/2022 | COT - LCBU - Excavation/Rebar/Zoning | IVR USER | Cancelled | Entered by IVR USER - IVRS - RI canceled |
10/07/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by RSALDAT1 - Partial. Rebar mat #3 at GL: 7.8 - 9.5/J.5 - M.3 (42’ x 47, x 5’6”), detail page S12.1, details #1, 2, 3. 5. Ok to place concrete in progress areas. |
10/06/2022 | COT - LCBU - Excavation/Rebar/Zoning | IVR USER | Cancelled | Entered by IVR USER - IVRS - RI canceled |
10/04/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Double matted slab at GL: H.5 - J.5/7.5 - 9; CF-18 at 18’ 4" x 30’ x 4’ 6". Grade beam at GL: H.5/7.5. Ok to place concrete in progress areas. |
09/27/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Mat footings: 12-W at GL: G/8; 12-W at GL; H/8: 12-E at GL: H/8.5; 12-E at GL: G/8.5. Crane mat at GL; 7.5 - 9.5. Column footings CC27 (2); CF9. Foundation footing at GL: L/16 - 17. Columns: GL; L/16 - 17; M.3 - R/16 - 17; 15.8/L - R; 15/L - R; 14/L - R; 13/L - R; 12/L - R; 11/N - P. |
09/21/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Not ready for Inspection | Entered by VVERA1 - Not ready. Inspection should have been 02010. |
09/19/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Column footings: CC23-CF9-6, 2’10" at, GL 12/L; CC2#-CD7-6 , 2’10" at GL: 14/L; CC25-CF6-0, 2’ at GL: 14/L; CC24-CR7-6, 2’4" at GL: 14/M. Ok to place concrete in progress areas. |
09/16/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by VVERA1 - Partial. Column footing CC23-CF12-0 at GL: 13/M. Ok to place concrete in progress area. |
09/15/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Column footings CC22 CF12-6 at GL: 11/N; CC21-CF14-6 at GL: 12/M. Ok to place concrete in progress areas. |
09/14/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by RSALDAT1 - . Partial. Column footings; CC24 CF9-0 at GL: 14/N; CC23 CF12-O at GL: 13/N; CC15 CF5 -0 at 16/P.8; CC27 CF6-O at GL: 15/L; CC23 CF12-0A at GL: N.7/11; CC23 CF12-0A at GL: P/11; CC23-CF12-OA at GL: 12/P-N. Mat #04 at GL: 12/P-N, CC23 CF12-OA. OK to place concrete in progress areas. |
09/13/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by VVERA1 - Partial. Column footings: C23-CF12-0 at GL: P/13; CC24-CF9-0 at GL: N/15; CC25-CF7-6. OK to place concrete in progress areas. |
09/12/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Column footings: CC26 CF9-OB at GL: P/16 - 17; CC26 CF9 -OB at GL: M.3/16 - 17; CC27 CF9 -OB at N/16 - 17. Column footings: CC-24 CF9-O. at GL: P/14; CC-24 CF9-O at GL: P/15. OK to place concrete in progress areas. |
09/09/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Column footing #CF22-0B at GL: Q - R/16 - 17; 22’ x 30’ x 2’ 4". Ok to place concrete in progress areas. |
09/08/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Column footings at GL: R/13, CF10-8; R/14; CF10-8. ; R/15; (10’ x 26’ x 3’ 8”); CF9-0A. (9’ x 22’ x 3). Ok to place concrete in progress areas. |
09/01/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Not ready for Inspection | Entered by NGARCIA3 - Not ready. Inspection should read 03005. Contractor unable to call in plumbing rough soil. Please ensure that 03005 is added to this permit, |
08/29/2022 | COT - LCBU - Excavation/Rebar/Zoning | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Information only. Partial schedule for plumbing rough soil (03005). Please ensure 03005 is attached to this permit. Contractor is unable to call this inspection in for service. |
10/21/2022 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass |