Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 211 N 4TH AV
Search
Parcel Attributes
Parcel | 11706077R 11706077U 11706077P 11706077Q 11706078A |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | PAD-33 |
Tucson Ward | Ward 6 |
Tucson Downtown Incentive Zone | Downtown Infill Incentive District |
Tucson Registered Neighborhood | Pie Allen |
Major Streets & Routes | Arterial or Collector |
National Register Historic District | Warehouse Historic District |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 211 N 4TH AV
Date - 12/22/2024 2:42 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
Original Town Of Tucson | ORIGINAL | None |
Rezoning Cases
Date - 12/22/2024 2:42 p.m.
Total Number Of Rezone Cases - (2)
Special Development Requests & Requirements
Address: 211 N 4TH AV
Date - 12/22/2024 2:42 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T22SA00296 | COMPLETE | 06/14/2022 | N/A | Zoning Adminstration Letter | Zoning Compliance Letter for proposed multi-story mixed use project |
Permits
Address: 211 N 4TH AV
Date - 12/22/2024 2:42 p.m.
Total Number Of Permits - (57)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-1223-01450 | Complete | 12/13/2023 | 05/01/2024 | Right-of-Way (ROW) | ROAD CLOSURE TO INSTALL UNDERGROUND RETENTION SYSTEM AND STORM DRAIN, TIE INTO EXISTING STORM DRAIN | |
TR-ROW-1122-00090 | Complete | 11/23/2022 | 01/18/2023 | Right-of-Way (ROW) | Pedestrian tunnel along 4th Ave - construction of tunnel will take only a couple of hours so flaggers will be used for pedestrian traffic in the area. | |
TR-UTL-1023-02758 | Complete | 10/24/2023 | 03/03/2024 | UNIT 631 | Right-of-Way (ROW) - Utility | P.174933 - ACCESS MH 1069 FOR SPLICING, PLACE (1) NEW HH, DIG (4) PITS, BORE 144' AND TRENCH 65' |
T22FC00687 | Complete | 10/05/2022 | 07/18/2024 | Fire Construction Permit | Flammable & Combustible Liquid - INSTALLATION OF GENERATOR WITH A 524 GALLON BASE TANK.; Other Construction Permit | |
T22FO00855 | Complete | 10/05/2022 | 10/10/2023 | Fire Operational Permit | Flammable & Combustible Liquid - CO2; Other Operational Permit | |
T22FO00856 | Complete | 10/05/2022 | 10/20/2024 | Fire Operational Permit | Hot Work Operations - OPUS DESIGN BUILD - POST TENSION CONCRETE CONSTRUCTION AND ENCLOSURE CONSTRUCTION.; Other Operational Permit | |
T22RW03215 | Complete | 09/06/2022 | 11/08/2022 | Right-of-Way (ROW) | Installing 2-8" fire protection services and 8" fife hydrant.** PROOF OF NOTIFICATION IS REQUIRED; Work Order: N/A | |
T22RW02910 | Complete | 08/13/2022 | 12/27/2022 | Right-of-Way (ROW) | INSTALLATION OF SANITARY SEWER MANHOLES AND CONNECTIONS INTO EXISTING SEWER. PER DP19-0125, PARTNERS | |
TC-CFO-0724-00151 | Issued | 07/25/2024 | 01/25/2025 | Certificate of Occupancy | T22CM04922 New Mixed Use building with Apartment & Retail | |
TR-ROW-0724-00825 | Complete | 07/18/2024 | 08/17/2024 | Right-of-Way (ROW) | Ari on Fourth Av Grand Opening Move In Our move-in date for this new development is on August 16th. We are working with East Desert Barricades for the traffic control plan and just need the permit secured. The only barricades that will be used are on 8th Street in between Herbert and Fourth Ave west bound leaving east bound open. We will also be having Ari on Fourth detour signs to prevent our residents moving in driving on Fourth Ave and backing it up. TRAFFIC CONTROL SET UP AND TAKE DOWN: 7AM - 7PM | |
T22RW02481 | Complete | 07/12/2022 | 10/18/2022 | Right-of-Way (ROW) | pulling underground cable into pull boxes** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF TH; Work Order: 6257816 | |
T22CM04922 | Issued | 06/29/2022 | 04/27/2025 | Commercial Building | New Mixed Use building with Apartment & Retail | |
T22FC00436 | Complete | 06/29/2022 | 01/27/2025 | Fire Construction Permit | Automatic Fire Extingshing Sys - Underground fire line for new building.; Commercial Fire Sprinkler Systems - Underground Fire Line Supply; Additional Plan Reviews: 1 | |
TR-ROW-0623-00873 | Complete | 06/14/2023 | 07/26/2024 | Right-of-Way (ROW) | CLOSURE OF STEVENS AV FOR PARTNERS ON FOURTH PAD.STEVENS AV TO BE OPENED DURING 4TH AV STREET FA; Work Order: DP19-0125. Extension for T22RW01780 Associated with DP19-0125 | |
T22RW02058 | Complete | 06/07/2022 | 08/21/2022 | Right-of-Way (ROW) | PARTNERS ON FOURTH PAD, DP19-0125TEMPORARY SCAFFOLDING AROUND BUILDING PERIMETER FOR ENCLOSURE W; Work Order: DP19-0125 | |
T22RW02032 | Complete | 06/01/2022 | 10/14/2022 | Right-of-Way (ROW) | DRY UTILITY AN CONDUIT INSTALLATION ASSOCIATED WITH TEP WORK PER DP19-0125, PARTNERS ON FOURTH PAD. | |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. | |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 1030 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 1031 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 1032 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 331 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 332 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 431 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 432 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 531 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 532 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 631 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 632 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 730 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 731 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 732 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 830 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 831 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 832 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 930 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 931 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
DP19-0125 | Issued | 05/20/2019 | 10/08/2027 | UNIT 932 | Development Package | *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building. |
T22RW01780 | Complete | 05/10/2022 | 07/27/2023 | Right-of-Way (ROW) | CLOSURE OF STEVENS AV FOR PARTNERS ON FOURTH PAD.STEVENS AV TO BE OPENED DURING 4TH AV STREET FA; Work Order: DP19-0125 | |
TS-PRM-0524-00190 | Fees Paid | 05/02/2024 | 10/29/2024 | Sign - Permanent | New sign for Ari on 4th | |
T22CM03148 | Complete | 04/27/2022 | 01/12/2025 | UNIT 816 | Commercial Building | Underground Site Utility for water/sewer/elec |
TR-PIA-0424-00003 | Complete | 04/05/2024 | 12/14/2024 | Private Improvement Agreement (PIA) | Reconstruction of Herbert Ave, PIA Associated with DP19-0125 | |
TR-UTL-0424-00694 | Complete | 04/03/2024 | 06/14/2024 | Right-of-Way (ROW) - Utility | (2) 3' x 3' bell holes in pavement, and an approximate 2' x 90' trench in pavement. Crews will be excavating along North side of E Stevens Ave. | |
TR-ROW-0423-00590 | Complete | 04/03/2023 | 07/16/2023 | Right-of-Way (ROW) | Sidewalk Closure on 4th Ave | |
T22CM02219 | Issued | 03/29/2022 | 03/30/2025 | Commercial Building | Foundation Only for Future Apartment Building | |
T22CM02222 | Complete | 03/29/2022 | 01/12/2025 | Commercial Building | Soil Nail and Shoring Plan for Future Apartment Building | |
TF-FCP-0324-00187 | Void | 03/08/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0223-00376 - Installation of new Stair Pressurization Panel in 13-Story R-2 residential building. | |
TC-COM-0223-00725 | Complete | 02/27/2023 | 01/15/2025 | Commercial Building | Construction of an Elevated Pool & Spa | |
TF-FCP-0223-00417 | Complete | 02/23/2023 | 12/18/2024 | Fire Construction Permit | Emergency Responder Radio Communications Design/Install for Opus 4th Avenue Project in Tucson. | |
TF-FCP-0223-00376 | Complete | 02/08/2023 | 12/18/2024 | Fire Construction Permit | Installation of new Fire Alarm/Voice Evacuation System in 13-Story R-2 residential building. | |
TF-FCP-0123-00325 | Complete | 01/24/2023 | 12/07/2024 | Fire Construction Permit | Install new Fire Sprinkler System throughout the building. | |
TR-ROW-0124-00059 | Complete | 01/11/2024 | 07/31/2024 | Right-of-Way (ROW) | Installation of Hardscape and Landscape in RofW per DP plan, including water line connection Updated - 5/21/2024 - Renewal Requested for 60 day as of 5/30/2024. | |
T22RW00032 | Complete | 01/05/2022 | 01/05/2024 | Right-of-Way (ROW) | PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Work Order: DP19-0125 | |
TR-ROW-0124-00007 | Complete | 01/03/2024 | 05/06/2024 | Right-of-Way (ROW) | PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. Renewal of T22RW00032 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Work Order: DP19-0125 | |
T22RW00694 | FINAL | 02/28/2022 | 07/17/2022 | ROW | 5 SYSTEM ABANDONMENTS PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
T22RW01565 | FINAL | 04/20/2022 | 08/27/2022 | ROW | Main replacement and reroute (10' INSTALLED IN DIRT AND 500' UNDER PAVEMENT) SEE ATTACHED DRAWINGS ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. N 4TH AV MITZ 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 3. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 4. MAINTAIN PEDESTRIAN ACCESS 5. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | |
T22RW01679 | FINAL | 04/28/2022 | 06/08/2022 | ROW | SIDEWALK AND ROADWAY CLOSURE FOR POTHOLING EXISTING UTILITIES FOR DESIGN OF TEP FEEDER RUNNING LINE PER ATTACHED DRAWING. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. CONTRACTOR SHALL COORDINATE STREET CLOSURES WITH SUN LINK, PARK TUCSON AND ABBUTING PROPERTY OWNERS. | |
T22RW02273 | FINAL | 06/22/2022 | 09/05/2022 | ROW | PARTNERS ON FOURTH PAD, DP19-0125 INSTALLATION OF CONTILEVERED BEAM SHORING OUTSIDE PROPERTY LINE. APPROVED SHORING PERMIT T22CM02222. APPLICANT/PROPERTY OWNER SHALL OBTAIN AN EASEMENT FROM THE CITY OF TUCSON FOR PILES AND SOIL NAILS TO REMAIN WITHIN THE PUBLIC RIGHTS-OF-WAY. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Plans
Address: 211 N 4TH AV
Date - 12/22/2024 2:42 p.m.
Total Number Of Plans - (5)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TP-AMD-0424-00005 | Void | 04/05/2024 | N/A | -- Plan Amendment | Minor Amendment to PAD-33 | |
TP-MOD-0424-000004 | Complete | 04/09/2024 | 10/06/2024 | -- Modifications to Previous Zoning Approvals | Minor Amendment to PAD-33 | |
TP-MOD-0524-000007 | Complete | 05/06/2024 | 11/02/2024 | -- Modifications to Previous Zoning Approvals | Minor Amendment to PAD-33 | |
C9-18-01 | EFFECTED | 01/17/2018 | N/A | REZONING PROCEDURES -- REZONE | ||
T17PRE0085 | CLOSED | 10/03/2017 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS |
Record Requests
Address: 211 N 4TH AV
Date - 12/22/2024 2:42 p.m.
Total Number Of Requests - (30)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0124-00518 | Complete | 01/17/2024 | 01/17/2024 | Requests | EXTEND 60 DAYS |
REQ-0224-01379 | Complete | 02/20/2024 | 02/20/2024 | Requests | *ALL HISTORICAL DATA UPLOADED FOR ADDRESS RANGE 211-225. FOR NEWER/CURRENT INFO, PLEASE CHECK PRO.* |
REQ-0424-02708 | Denied | 04/08/2024 | N/A | Requests | ** DENIED NO PRE ACTIVITY FIELD MEETING** Please extend through 7/31/2024 PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. Renewal of T22RW00032 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Work Order: DP19-0125 |
REQ-0424-02882 | Approved | 04/16/2024 | 04/16/2024 | Requests | T22FC00687 Flammable & Combustible Liquid - INSTALLATION OF GENERATOR WITH A 524 GALLON BASE TANK.; Other Construction Permit |
REQ-0424-03237 | Denied | 04/30/2024 | N/A | Requests | ** DENIED DUE TO NO PRE-ACTIVITY MEETING HELD/ SHEDULED** Please extend through July 31, 2024 Installation of Hardscape and Landscape in RofW per DP plan, including water line connection |
REQ-0523-02655 | Denied | 05/11/2023 | N/A | Requests | Denied - Please resubmit for a new permit as we are finalizing all legacy permits. Please extend for an additional year to July of 2024 |
REQ-0524-03780 | Complete | 05/21/2024 | 05/21/2024 | Requests | Please extend through 7/31/2024 - - Installation of Hardscape and Landscape in RofW per DP plan, including water line connection |
REQ-0623-03427 | Complete | 06/20/2023 | 06/25/2024 | Requests | Please extend |
REQ-0723-03685 | Denied | 07/05/2023 | N/A | Requests | DENIED – DUE TO NO PRE-ACTIVITY MEETING SCHEDULED VIA THE ONLINE PORTAL. please extend through 12-1-2023 |
REQ-0724-04693 | Approved | 07/02/2024 | 07/02/2024 | Requests | Automatic Fire Extingshing Sys - Underground fire line for new building.; Commercial Fire Sprinkler Systems - Underground Fire Line Supply; Additional Plan Reviews: 1 |
REQ-0724-04717 | Approved | 07/03/2024 | 07/03/2024 | Requests | Install new Fire Sprinkler System throughout the building. |
REQ-0724-04934 | Denied | 07/16/2024 | N/A | Requests | This Project is not complete all conditions need to be satisfied and Reviews need to be completed. Once all Reviews/Revision are approved and conditions are satisfied re-request for CofO/LOC. Sent message to Sonya and josh about DP final inspection next week - Foundation Only for Future Apartment Building |
REQ-0724-04935 | Complete | 07/16/2024 | 07/17/2024 | Requests | Soil Nail and Shoring Plan for Future Apartment Building |
REQ-0724-04949 | Complete | 07/17/2024 | 07/17/2024 | Requests | Underground Site Utility for water/sewer/elec |
REQ-0823-04404 | Complete | 08/15/2023 | 09/01/2023 | Requests | Construction of an Elevated Pool & Spa. General Contractor will not be ready for Cimarron Circle to work on the pool & spa for another month. |
REQ-0824-05449 | Complete | 08/12/2024 | 08/13/2024 | Requests | TC-COM-0223-00725 Construction of an Elevated Pool & Spa |
REQ-0824-05472 | Complete | 08/13/2024 | 08/14/2024 | Requests | Requesting Level 4 TCO New Mixed Use building with Apartment & Retail |
REQ-0923-05089 | Approved | 09/19/2023 | 09/20/2023 | Requests | Flammable & Combustible Liquid - INSTALLATION OF GENERATOR WITH A 524 GALLON BASE TANK.; Other Construction Permit |
REQ-0923-05128 | Complete | 09/21/2023 | 09/21/2023 | Requests | Hot Work Operations - OPUS DESIGN BUILD - POST TENSION CONCRETE CONSTRUCTION AND ENCLOSURE CONSTRUCTION.; Other Operational Permit |
REQ-0924-06258 | Complete | 09/17/2024 | 09/17/2024 | Requests | T22CM04922 New Mixed Use building with Apartment & Retail |
REQ-1024-07188 | Complete | 10/22/2024 | 10/22/2024 | Requests | T22CM04922 New Mixed Use building with Apartment & Retail |
REQ-1123-06195 | Approved | 11/13/2023 | 11/14/2023 | Requests | Emergency Responder Radio Communications Design/Install for Opus 4th Avenue Project in Tucson. |
REQ-1123-06230 | Approved | 11/14/2023 | 11/14/2023 | Requests | Install new Fire Sprinkler System throughout the building. |
REQ-1124-07950 | Denied | 11/20/2024 | N/A | Requests | This Project is not complete all related permits need to be in completed status DP19-0125. Please re-request once all associated projects are in completed status. Foundation Only for Future Apartment Building |
REQ-1124-07951 | Complete | 11/20/2024 | 11/20/2024 | Requests | T22CM04922 New Mixed Use building with Apartment & Retail |
REQ-1222-00471 | Complete | 12/20/2022 | 01/04/2023 | Requests | Please extend for an additional 6 months |
REQ-1222-00511 | Complete | 12/23/2022 | 01/06/2023 | Requests | Please extend for an additional year |
REQ-1223-06582 | Approved | 12/04/2023 | 12/05/2023 | Requests | Installation of new Fire Alarm/Voice Evacuation System in 13-Story R-2 residential building. |
REQ-1223-07092 | Denied | 12/22/2023 | N/A | Requests | DENIED – DUE TO NO PRE-ACTIVITY MEETING SCHEDULED VIA THE ONLINE PORTAL. P.174933 - ACCESS MH 1069 FOR SPLICING, PLACE (1) NEW HH, DIG (4) PITS, BORE 144' AND TRENCH 65' |
REQ-1224-08643 | Complete | 12/19/2024 | 12/19/2024 | Requests | T22CM04922 New Mixed Use building with Apartment & Retail |