Inspection Status: Not Ready
Inspection History: COT - LCBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - LCBU - Preslab |
|
Not Ready |
|
| 01/09/2023 |
COT - LCBU - Preslab |
|
Partial Pass |
Post tension cable system in upper area, GL: 4.5 - 8/A - D, center area, GL:3 - 8.5/D - H. OK to place concrete in progress areas. |
| 01/12/2023 |
COT - LCBU - Preslab |
|
Partial Pass |
Post tension cable system on Level #1; Area B at GL: G.5 - L.5/4.4 - 8.5. Ok to place concrete in progress areas. |
| 01/26/2023 |
COT - LCBU - Preslab |
|
Not Ready |
Contractor cancelled. Will reschedule for 27 January |
| 01/30/2023 |
COT - LCBU - Preslab |
|
Partial Pass |
Ramp areas #107 - 112; columns CC1 (7 each), CC5 (4 each). Ok to set forms and place concrete in progress areas. |
| 07/15/2024 |
COT - LCBU - Preslab |
|
Passed |
|
| 09/06/2023 |
COT - LCBU - Preslab |
|
Partial Pass |
Vertical columns on Level #13: A/1, A/2, A/3, A/4, B/1, B/2, B/3, B/4, C/1, C/2, C/3, C/E, E/4.5, E/5.5, F/4.5, F/5.5, F/3.5, F/3, F.8/1, G/2, G.6/2.4, G.6/3, G/3, G/4, G.6/4,G.6/5, G/5. OK to set forms and place concrete in progress areas. |
| 09/18/2023 |
COT - LCBU - Preslab |
|
Partial Pass |
Level #14, placement,#1: Post Tension Cable system. Ok to place concrete in progress areas. |
| 10/23/2023 |
COT - LCBU - Preslab |
|
Not Ready |
Contractor cancelled, will reschedule for 25 October. |
| 12/19/2022 |
COT - LCBU - Preslab |
|
Canceled |
Contractor cancelled inspection |
| 12/22/2022 |
COT - LCBU - Preslab |
|
Partial Pass |
Garage first floor and ramp to level 1 at GL; 1 - 3/G.6; 1 -8/E - A. Ok to place concrete in progress areas. |