Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM01378
Permit Details
Apply Date:
02/24/2022
Applicant:
William Shipley
Description:
New Storage Facility
Permit Reviews
Permit Number - T22CM01378
Permit Status: In review
Permit Description: New Storage Facility
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/24/2022 | 3RD PARTY REVIEW - COMMERCIAL | 07/15/2022 | COMPLETED |
03/04/2024 | COMMERCIAL REVIEW - FULL v.2 | 04/09/2024 | APPROVED |
02/21/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/21/2024 | REQUIRES RESUBMIT |
07/12/2023 | RESTAMP - COMMERCIAL v.1 | 07/13/2023 | APPROVED |
05/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/06/2024 | APPROVED |
01/23/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/13/2024 | APPROVED |
06/30/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/12/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM01378
Permit Status: In review
Permit Description: New Storage Facility
Total Outstanding Activity Conditions - 15
Date | Name |
---|---|
04/10/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
04/10/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
04/10/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
04/10/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
04/10/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
04/10/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
07/15/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
07/15/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
07/15/2022 | SPECIAL INSPECTION IS REQUIRED FOR EFIS. |
07/15/2022 | SHOP DRAWINGS REQUIRED FOR METAL STAIRS. |
07/15/2022 | SHOP DRAWINGS REQUIRED FOR METAL STUD DESIGN. |
07/15/2022 | SHOP DRAWINGS REQUIRED FOR AUTOMTIC FIRE SPRINKLERS. |
07/15/2022 | SHOP DRAWINGS REQUIRED FOR FIRE ALARM. |
07/15/2022 | SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT. |
07/15/2022 | SPECIAL INSPECTION IS REQUIRED FOR AIR BALANCE REPORT. |
Conditions
Permit Number - T22CM01378
Permit Status: In review
Permit Description: New Storage Facility
Date | Description | Comments |
---|---|---|
04/10/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
07/13/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
05/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: In Review
Permit Number: T22CM01378
Permite Description: New Storage Facility
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - FCON - Fire - Final | N/A | Not Ready | Ok to backfill Underground. Will Hydro test another day. | |
08/08/2024 | COT - LCPL - Plumbing Progress | N/A | Partial Pass | 5/13/24: not ready needed information on sewer connection Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. Canceled per contractor. 7/26/2024 7/29/24: Canceled by Erich 8/1/24: domestic water tie in per plans ok to backfill. Shading required Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 8/8/24: plumbing underground at rooms 102,103,106 passed. Ok to backfill. |
08/08/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
08/01/2024 | COT - HCPL - Sewer | N/A | Partial Pass | Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. 7/29/24: Canceled by Erich 8/1/24: Domestic water tie in passed ok to backfill. Shading required |
08/08/2024 | COT - LCPL - Plumbing Final | N/A | Partial Pass | Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. 7/29/24: Canceled by Erich 8/1/24: Domestic water tie in passed ok to backfill. Shading required 8/8/24: plumbing underground at rooms 102,103,106 passed. Ok to backfill. |
08/22/2024 | BULD - Electrical Clearance | N/A | Not Ready | |
08/22/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | X2 4” schedule 40 at 48” depth. From disconnect switch feeding panel “MDP”. Okay to backfill progress areas. 8/22/2024 |
09/12/2024 | COT - LCPL - Rough Soil | N/A | Canceled | |
09/26/2024 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 8/8/24: perimeter footing reinforcement per plans. Ok to pour GL W/18-27, C-W/13-1, C/18-27, Stairwell footing at south west corner GL T-X/1-2 ok to proceed. 8/19/24: reinforcement at elevator slab per plans ok to proceed. Partial pass. #2 west end Elevator pit. (Sump pit) s3-00 typical elevator pit section. Screen wall south end from east to west. Okay for concrete placement in footings. 8/22/2024 8/30/24: West elevator pit reinforcement per plan ok to proceed. 9/6/24: East Elevator pit reinforcement per plans ok to proceed. 9/11/24: vapor barrier has been placed at west half of 8" slab on grade. F40 at GL 10/H ok to pour. 9/12/24: footing F40. COL 18,R AND T; COL 28, U AND V 9/20/24: not ready for first lift at elevator for CMU wall. Will recall Monday 9/24/24: elevator stem walls reinforcement per plan ok to proceed with grout. 9/26/24: west half GL A-X/ 1-14 reinforcement per plan ok to proceed. |
Scheduled Inspections
Scheduled Inspections - T22CM01378
Status: In Review
Description: New Storage Facility
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/08/2024 | COT - LCBU - Excavation/Rebar/Zoning | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.