Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCME - Mechanical Final
Permit Number - T22CM01378
Inspection Description - COT - LCME - Mechanical Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | COT - LCME - Mechanical Final | Not Ready | Mechanical intermediate not ready. 6/12/2025 | |
| 06/26/2025 | COT - LCME - Mechanical Final | Not Ready | Mechanical intermediate not ready. 6/12/2025 6/26/25: not ready, seal duct and complete rough-in, drain pans required at air handlers, call once rough-in is complete. |
|
| 07/16/2025 | COT - LCME - Mechanical Final | Partial Pass | 7-16-25: partial pass on mechanical above ceiling for sales, janitor, men/woman's restrooms, and breakroom. Add R-3 insulation to hot water piping on water heater located in restroom and any hot copper lines 3/4" or larger. | |
| 08/07/2025 | COT - LCME - Mechanical Final | Re-inspection required | Seal all joints and provide secondary per plan. 8/7/2025 | |
| 08/25/2025 | COT - LCME - Mechanical Final | Re-inspection required (with fee) | 8-25-25: wrap hot water copper line with R3 insulation above ceiling at restroom, missing restroom fan covers, and paint all exterior PVC/ABS. | |
| 08/27/2025 | COT - LCME - Mechanical Final | Re-inspection required | 8-27-25: secure water heater disconnect box to wall above ceiling men's restroom, baby changers must be installed at 2' 3" AFF-see plans for details, paint all exterior pvc, missing mini split covers on exterior side of elevator equipment rooms, provide access to northeast electrical room. | |
| 08/28/2025 | COT - LCME - Mechanical Final | Passed | 8-28-25: approved. |