Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCPL - Plumbing Final
Permit Number - T22CM01378
Inspection Description - COT - LCPL - Plumbing Final
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2024 | COT - LCPL - Plumbing Final | Partial Pass | Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. 7/29/24: Canceled by Erich 8/1/24: Domestic water tie in passed ok to backfill. Shading required 8/8/24: plumbing underground at rooms 102,103,106 passed. Ok to backfill. |
|
| 08/20/2025 | COT - LCPL - Plumbing Final | Partial Pass | 8-20-25: roof drains height located on west side not per plans, paint all exterior PVC/abs, lower reflective mirror on both restrooms to 40" to reflective surface and lower baby changers to 2' 3" aff. Also, see previous notes from 8/8/24: Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. |
|
| 08/22/2025 | COT - LCPL - Plumbing Final | Re-inspection required | 8-22-25: pending sewer test & roof drain on west side of building-see previous plumbing notes, paint all exterior pvc/abs, label junction box at 1st floor northeast stair case, above ceiling at in restrooms, wrap hot water copper line above ceiling in men's restroom, lower restroom mirrors to 40" to reflective surface, lower baby changers to 2' 3" AFF, missing restroom fan covers & at janitors closet, lower all ADA signage to 48" to the base of braille, missing mini split at drive-thru and finish tying HVAC on second floor, missing label on panel in 1st floor electrical room, firefoam vertical penetrations above electrical conduits above panel in janitors closet, firefoam all penetrations around elevator shaft cmu walls. | |
| 08/26/2025 | COT - LCPL - Plumbing Final | Passed | 8-26-25: pressure test from sewer to manhole verified. Plumbing final approved. |