Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Sewer
Permit Number - T22CM01378
Inspection Description - COT - HCPL - Sewer
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/03/2024 | COT - HCPL - Sewer | Partial Pass | ||
06/07/2024 | COT - HCPL - Sewer | Partial Pass | Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. |
|
07/23/2024 | COT - HCPL - Sewer | Not Ready | Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. |
|
07/29/2024 | COT - HCPL - Sewer | Canceled | Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. 7/29/24: Canceled by Erich |
|
08/01/2024 | COT - HCPL - Sewer | Partial Pass | Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. 7/29/24: Canceled by Erich 8/1/24: Domestic water tie in passed ok to backfill. Shading required |
|
08/08/2024 | COT - HCPL - Sewer | Partial Pass | Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. 7/29/24: Canceled by Erich 8/1/24: Domestic water tie in passed ok to backfill. Shading required 8/8/24: plumbing underground at rooms 102,103,106 passed. Ok to backfill. |