Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T22CM01378

Parcel: 13727991E

Inspection Status: Partial Pass

Inspection History: COT - HCPL - Sewer 

Permit Number - T22CM01378

Inspection Description - COT - HCPL - Sewer 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
06/03/2024 COT - HCPL - Sewer  Partial Pass
06/07/2024 COT - HCPL - Sewer  Partial Pass Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed.
6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed.
07/23/2024 COT - HCPL - Sewer  Not Ready Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed.
6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed.
7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready.
07/29/2024 COT - HCPL - Sewer  Canceled Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed.
6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed.
7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready.
7/29/24: Canceled by Erich
08/01/2024 COT - HCPL - Sewer  Partial Pass Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed.
6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed.
7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready.
7/29/24: Canceled by Erich
8/1/24: Domestic water tie in passed ok to backfill. Shading required
08/08/2024 COT - HCPL - Sewer  Partial Pass Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed.
6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed.
7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready.
7/29/24: Canceled by Erich
8/1/24: Domestic water tie in passed ok to backfill. Shading required
8/8/24: plumbing underground at rooms 102,103,106 passed. Ok to backfill.