Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Progress
Permit Number - T22CM01378
Inspection Description - COT - LCPL - Plumbing Progress
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2024 | COT - LCPL - Plumbing Progress | Not Ready | 5/13/24: not ready needed information on sewer connection | |
07/23/2024 | COT - LCPL - Plumbing Progress | Not Ready | 5/13/24: not ready needed information on sewer connection Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. |
|
07/26/2024 | COT - LCPL - Plumbing Progress | Canceled | Canceled per contractor. 7/26/2024 | |
07/29/2024 | COT - LCPL - Plumbing Progress | Canceled | ||
08/01/2024 | COT - LCPL - Plumbing Progress | Partial Pass | 5/13/24: not ready needed information on sewer connection Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. Canceled per contractor. 7/26/2024 7/29/24: Canceled by Erich 8/1/24: domestic water tie in per plans ok to backfill. Shading required |
|
08/08/2024 | COT - LCPL - Plumbing Progress | Partial Pass | 5/13/24: not ready needed information on sewer connection Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 6/7/24: partial approval from manhole to clean out at tie-in. Air pressure conducted and passed. 7/23/24: called Erich at 6:55am (no answer, left message stating I was in route for inspection), arrived on site at 7:03am called Erich (no answer), not ready. Canceled per contractor. 7/26/2024 7/29/24: Canceled by Erich 8/1/24: domestic water tie in per plans ok to backfill. Shading required Partial approval for site sewer line from manhole to cleanout only OK to cover cover at your own wrist. No leak test has been performed at this time. Air test to be done after manhole is installed. 8/8/24: plumbing underground at rooms 102,103,106 passed. Ok to backfill. |