Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Address:
127 S 5TH AV
Address NEW:
127 S 5TH AV
Apply Date:
01/16/2020
Applicant:
SBBL ARCHITECTURE + PLANNING *C
Description:
7 STORY APARTMENT BUILDING

Permit Reviews

Permit Number - T20CM00360
Permit Status: C of o
Permit Description: 7 STORY APARTMENT BUILDING
Start Date Submittal Complete Date Status  
01/16/2020 PLANS OK TO SUBMIT - COMM 01/23/2020 COMPLETED Review Details
01/23/2020 COMMERCIAL - NEW 02/28/2020 COMPLETED Review Details
02/01/2021 RESUBMITTAL 02/03/2021 COMPLETED Review Details
02/28/2020 RESUBMITTAL 05/11/2020 COMPLETED Review Details
04/14/2021 REVISION - - 4TH 04/27/2021 COMPLETED Review Details
05/13/2020 REVISION - - 1ST 06/01/2020 COMPLETED Review Details
06/01/2020 REVISION - - 1ST 06/01/2020 COMPLETED Review Details
07/09/2020 REVISION - - 2ND 02/01/2021 COMPLETED Review Details
10/26/2020 REVISION - - 3RD 02/03/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM00360
Permit Status: C of o
Permit Description: 7 STORY APARTMENT BUILDING
Total Outstanding Activity Conditions - 1
Date Name
01/16/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: C of o
Permit Number: T20CM00360
Permite Description: 7 STORY APARTMENT BUILDING
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/15/2021 BUILDING - FINAL N/A Partial Approval Partial. Ok to move in equipment for staff and allow staff in for training. Ok to make application for TCO on 1June 2021 for occupancy of room units 202, 204, 207 304, 306, 402, 406. Pending Fire Finals.

Completed Inspections

Permit Status: C of o
Permit Number: T20CM00360
Permit Description: 7 STORY APARTMENT BUILDING
Total Completed Inspections - 41
Date Description Inspector Results Comments
02/28/2020 MECHANICAL - FINAL RSHERRY Approved AIR BALANCE REPORT REQUIRED
06/15/2020 TEP CLEARANCE - PM JBURGE Approved CODE TMPP
06/15/2020 ELECTRIC - TEMPORARY SERVICE JBURGE Approved Partial. Temporary power for crane only. Ok to energize.

Clearance; Code: TMPP
07/21/2020 STEM WALL/RETAINING WALL JBURGE Approved Partial. Stem wall at elevator pad. Ok to place grout in progress areas.
09/01/2020 ELECTRIC - UNDERGROUND JBURGE Approved Partial. 4" conduits for cable; phone service and SES lines. Ok to cover progress areas.
09/14/2020 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved . Partial. Level #7 West; Shear wall #1 at GL: A.5-B/2; Elevator Walls at GL:A-A.75/3.5-3.9. Columns at GL: A/1; A/2; A/3; A/4.4; B/4.4; B/1; B/3. Ok to place concrete in progress areas.
09/16/2020 PLUMBING - ROUGH, SOIL JBURGE Approved Partial. HCS connection in place; two way clean out in place.
09/23/2020 FIRE - FINAL wmotto1 Approved 1. See notes under the sprinkler final regarding temp standpipe
09/23/2020 FIRE SPKLR - FINAL wmotto1 Approved 1. A temp standpipe must be installed next the the temporary stairs. Need to place a sign that reads dry standpipe connection. This must be visible from the street. This must be completed by 9.29.20.
09/28/2020 BUILDING PRE-SLAB JBURGE Approved Partial. Roof Level East, Post Tension Cable System. Ok to place concrete in progress areas.
10/12/2020 SHEET ROCK NAILING JBURGE Approved Level #5; vertical shafts; first layer of sheet rock. Ok to place second layer and fire caulk.
12/03/2020 BUILDING ABOVE CEILING JBURGE Approved Partial. Level #3; corridors. Ok to cover progress areas. Ensure penetrations at East end of main corridor are properly fire caulked.
12/08/2020 STUCCO MESH JBURGE Approved Partial. Level #7 shafts fire caulk. Ok to sheet rock second layer for two hour rating.
12/10/2020 FIREWALL/FIREBARRIER/FIRESTOP ESTEVENS Approved Canceled by contractor.
12/10/2020 REINFORCED MASONRY PRE-GROUT ESTEVENS Approved Canceled by contractor.
12/23/2020 ELECTRIC - ABOVE CEILING JBURGE Approved Not ready. Contractor cancelled.
12/31/2020 FRAMING JBURGE Approved Partial. Level #6; Room Units 605; 606; 609; 610; 613; 614; 615. Ok to insulate and cover walls.
12/31/2020 ELECTRIC - INTERMEDIATE JBURGE Approved Partial. Level #6; Room Units 605; 606; 609: 610; 613; 614; 615. Ensure putty packs are properly place as per code require.
12/31/2020 PLUMBING - INTERMEDIATE JBURGE Approved Partial. Level #6; Room Units 605; 606; 609; 610; 613; 614; 615.
12/31/2020 MECHANICAL - INTERMEDIATE JBURGE Approved Partial. Level #6; Room Units 605; 606; 609; 610; 613; 614; 615.
05/20/2021 PLUMBING - SEWER HCS CONNECT JBURGE Approved
05/20/2021 PLUMBING - YARD WTR LINE/TEST JBURGE Approved
05/20/2021 PLUMBING - ROOF DRAINS JBURGE Approved
05/20/2021 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved
05/20/2021 ELECTRIC - CONSTRUCTION POWER JBURGE Approved
05/20/2021 ELECTRIC - UFER JBURGE Approved
05/20/2021 U VALUE FOR WINDOW JBURGE Approved
05/20/2021 ROOF NAILING JBURGE Approved
05/20/2021 ROOF NAILING JBURGE Approved
05/20/2021 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved
05/26/2021 PLUMBING - BACK WATER VALVE JBUIRGE Approved 3090
05/26/2021 ZONING PROGRESS RSALDAT1 Approved OK FOR TCO IN REGRDS TO ZONING, C OF O WILL BE CONDUCTED ON ZONING FINAL 9033. RICK SALDATE CONDUCTED INSPECTION FOR HARDSCAPE/LANDSCAPE/HISTORIC SIGN AND FINAL ARCHITECTURAL ELEVATION DETAILS. ALL MATCH APPROVALS SUBMITTED. REPORT SENT TO ALL FOUR ASSOCIATED ZONING REVIEWERS, WILL COMMUNICATE WITHNIN ONE TO TWO DAYS IN CASE OF ANY CONCERNS ENCOUNTERED IN REPORT.
05/26/2021 PLUMBING - FINAL JBURGE Approved Approved. Bacteria test results forwarded to Robert Sherry.
05/27/2021 ELECTRIC - FINAL JBUIRGE Approved
05/27/2021 OUTDOOR LIGHTING FINAL JBUIRGE Approved
06/01/2021 BUILDING - PROGRESS JBURGE Approved Approved
06/02/2021 ZONING - FINAL RSALDAT1 Approved ZONING FINAL APPROVED, OK FOR C OF O ZONING.
06/10/2021 CERTIFICATE OF OCCUPANCY JBURGE Approved Approved. Ok to apply for Certificate of Occupancy.
06/10/2021 ENGINEERING - FINAL DROBERTS Approved APPROVED, THIS INSPECTION HAS ALREADY BEEN PUT INTO PERMITS PLUS BY DAVID
06/10/2021 ENGINEERING - FINAL DROBERTS Approved
06/10/2021 FIRE - ALARM FINAL wmotto1 Approved

Documents

File Name Document Type  
T20CM00360 AIR BALANCE1.PDF DOCUMENTS VIEW
T20CM00360 WATER REPORT1.PDF DOCUMENTS VIEW
REVISED APPLICAITON.PDF DOCUMENTS VIEW
REVISION NARRATIVE_2.PDF DOCUMENTS VIEW
SIC DOUBLE STAMPED.PDF DOCUMENTS VIEW
SIGNED SEWER MH RESPONSE LETTER.PDF DOCUMENTS VIEW
TEMPORARY COFO.PDF DOCUMENTS VIEW
TEMPORARY COFO REQUEST.PDF DOCUMENTS VIEW
PLAN PSK-1.PDF CONSTRPLANS VIEW
REV1_PLAN SET.PDF CONSTRPLANS VIEW
REV2_PLAN SET.PDF CONSTRPLANS VIEW
REV2_PLUMBING.PDF CONSTRPLANS VIEW
REV3_1 FORMWORK & SHORING DESIGN.PDF CONSTRPLANS VIEW
REV3_1 POST TENSION CONCRETE - FRICTION LOSSES AND ELONGATION CALCULATIONS.PDF DOCUMENTS VIEW
REV4_PLAN SET.PDF CONSTRPLANS VIEW
COFO.PDF CERT OF OCC VIEW
REV3_PLUMBING.PDF CONSTRPLANS VIEW
PERMIT.PDF DOCUMENTS VIEW
1_ PERMIT APPLICATION.PDF DOCUMENTS VIEW
1_ PROJECT MANUAL 2-28-2020.PDF DOCUMENTS VIEW
1_GUD27ESS DRYER INSTALLATION INSTRUCTION.PDF DOCUMENTS VIEW
A STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
A_ LOAD CALCS 1-13-2020.PDF DOCUMENTS VIEW
A_SPEC INSP CERT.PDF DOCUMENTS VIEW
GC LETTER.PDF DOCUMENTS VIEW
REV1_1 DEFERRED SUBMITTAL.PDF DOCUMENTS VIEW
REV1_2 DEFERRED CALCS.PDF DOCUMENTS VIEW
A_PLAN_SET 2.28.20.PDF CONSTRPLANS VIEW
REV1_2 DEFERRED PLANS.PDF CONSTRPLANS VIEW