| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2020 | PLANS OK TO SUBMIT - COMM | 01/23/2020 | COMPLETED |
| 01/23/2020 | COMMERCIAL - NEW | 02/28/2020 | COMPLETED |
| 02/01/2021 | RESUBMITTAL | 02/03/2021 | COMPLETED |
| 02/28/2020 | RESUBMITTAL | 05/11/2020 | COMPLETED |
| 04/14/2021 | REVISION - - 4TH | 04/27/2021 | COMPLETED |
| 05/13/2020 | REVISION - - 1ST | 06/01/2020 | COMPLETED |
| 06/01/2020 | REVISION - - 1ST | 06/01/2020 | COMPLETED |
| 07/09/2020 | REVISION - - 2ND | 02/01/2021 | COMPLETED |
| 10/26/2020 | REVISION - - 3RD | 02/03/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T20CM00360
Permit Status: C of o
Permit Description: 7 STORY APARTMENT BUILDING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/16/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: C of o
Permit Number: T20CM00360
Permite Description: 7 STORY APARTMENT BUILDING
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2021 | BUILDING - FINAL | N/A | Partial Approval | Partial. Ok to move in equipment for staff and allow staff in for training. Ok to make application for TCO on 1June 2021 for occupancy of room units 202, 204, 207 304, 306, 402, 406. Pending Fire Finals. |
Completed Inspections
Permit Status: C of o
Permit Number: T20CM00360
Permit Description: 7 STORY APARTMENT BUILDING
Total Completed Inspections - 41
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2020 | MECHANICAL - FINAL | RSHERRY | Approved | AIR BALANCE REPORT REQUIRED |
| 06/15/2020 | TEP CLEARANCE - PM | JBURGE | Approved | CODE TMPP |
| 06/15/2020 | ELECTRIC - TEMPORARY SERVICE | JBURGE | Approved | Partial. Temporary power for crane only. Ok to energize. Clearance; Code: TMPP |
| 07/21/2020 | STEM WALL/RETAINING WALL | JBURGE | Approved | Partial. Stem wall at elevator pad. Ok to place grout in progress areas. |
| 09/01/2020 | ELECTRIC - UNDERGROUND | JBURGE | Approved | Partial. 4" conduits for cable; phone service and SES lines. Ok to cover progress areas. |
| 09/14/2020 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | . Partial. Level #7 West; Shear wall #1 at GL: A.5-B/2; Elevator Walls at GL:A-A.75/3.5-3.9. Columns at GL: A/1; A/2; A/3; A/4.4; B/4.4; B/1; B/3. Ok to place concrete in progress areas. |
| 09/16/2020 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | Partial. HCS connection in place; two way clean out in place. |
| 09/23/2020 | FIRE - FINAL | wmotto1 | Approved | 1. See notes under the sprinkler final regarding temp standpipe |
| 09/23/2020 | FIRE SPKLR - FINAL | wmotto1 | Approved | 1. A temp standpipe must be installed next the the temporary stairs. Need to place a sign that reads dry standpipe connection. This must be visible from the street. This must be completed by 9.29.20. |
| 09/28/2020 | BUILDING PRE-SLAB | JBURGE | Approved | Partial. Roof Level East, Post Tension Cable System. Ok to place concrete in progress areas. |
| 10/12/2020 | SHEET ROCK NAILING | JBURGE | Approved | Level #5; vertical shafts; first layer of sheet rock. Ok to place second layer and fire caulk. |
| 12/03/2020 | BUILDING ABOVE CEILING | JBURGE | Approved | Partial. Level #3; corridors. Ok to cover progress areas. Ensure penetrations at East end of main corridor are properly fire caulked. |
| 12/08/2020 | STUCCO MESH | JBURGE | Approved | Partial. Level #7 shafts fire caulk. Ok to sheet rock second layer for two hour rating. |
| 12/10/2020 | FIREWALL/FIREBARRIER/FIRESTOP | ESTEVENS | Approved | Canceled by contractor. |
| 12/10/2020 | REINFORCED MASONRY PRE-GROUT | ESTEVENS | Approved | Canceled by contractor. |
| 12/23/2020 | ELECTRIC - ABOVE CEILING | JBURGE | Approved | Not ready. Contractor cancelled. |
| 12/31/2020 | FRAMING | JBURGE | Approved | Partial. Level #6; Room Units 605; 606; 609; 610; 613; 614; 615. Ok to insulate and cover walls. |
| 12/31/2020 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | Partial. Level #6; Room Units 605; 606; 609: 610; 613; 614; 615. Ensure putty packs are properly place as per code require. |
| 12/31/2020 | PLUMBING - INTERMEDIATE | JBURGE | Approved | Partial. Level #6; Room Units 605; 606; 609; 610; 613; 614; 615. |
| 12/31/2020 | MECHANICAL - INTERMEDIATE | JBURGE | Approved | Partial. Level #6; Room Units 605; 606; 609; 610; 613; 614; 615. |
| 05/20/2021 | PLUMBING - SEWER HCS CONNECT | JBURGE | Approved | |
| 05/20/2021 | PLUMBING - YARD WTR LINE/TEST | JBURGE | Approved | |
| 05/20/2021 | PLUMBING - ROOF DRAINS | JBURGE | Approved | |
| 05/20/2021 | ELECTRIC - OUTDOOR LIGHTING | JBURGE | Approved | |
| 05/20/2021 | ELECTRIC - CONSTRUCTION POWER | JBURGE | Approved | |
| 05/20/2021 | ELECTRIC - UFER | JBURGE | Approved | |
| 05/20/2021 | U VALUE FOR WINDOW | JBURGE | Approved | |
| 05/20/2021 | ROOF NAILING | JBURGE | Approved | |
| 05/20/2021 | ROOF NAILING | JBURGE | Approved | |
| 05/20/2021 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | |
| 05/26/2021 | PLUMBING - BACK WATER VALVE | JBUIRGE | Approved | 3090 |
| 05/26/2021 | ZONING PROGRESS | RSALDAT1 | Approved | OK FOR TCO IN REGRDS TO ZONING, C OF O WILL BE CONDUCTED ON ZONING FINAL 9033. RICK SALDATE CONDUCTED INSPECTION FOR HARDSCAPE/LANDSCAPE/HISTORIC SIGN AND FINAL ARCHITECTURAL ELEVATION DETAILS. ALL MATCH APPROVALS SUBMITTED. REPORT SENT TO ALL FOUR ASSOCIATED ZONING REVIEWERS, WILL COMMUNICATE WITHNIN ONE TO TWO DAYS IN CASE OF ANY CONCERNS ENCOUNTERED IN REPORT. |
| 05/26/2021 | PLUMBING - FINAL | JBURGE | Approved | Approved. Bacteria test results forwarded to Robert Sherry. |
| 05/27/2021 | ELECTRIC - FINAL | JBUIRGE | Approved | |
| 05/27/2021 | OUTDOOR LIGHTING FINAL | JBUIRGE | Approved | |
| 06/01/2021 | BUILDING - PROGRESS | JBURGE | Approved | Approved |
| 06/02/2021 | ZONING - FINAL | RSALDAT1 | Approved | ZONING FINAL APPROVED, OK FOR C OF O ZONING. |
| 06/10/2021 | CERTIFICATE OF OCCUPANCY | JBURGE | Approved | Approved. Ok to apply for Certificate of Occupancy. |
| 06/10/2021 | ENGINEERING - FINAL | DROBERTS | Approved | APPROVED, THIS INSPECTION HAS ALREADY BEEN PUT INTO PERMITS PLUS BY DAVID |
| 06/10/2021 | ENGINEERING - FINAL | DROBERTS | Approved | |
| 06/10/2021 | FIRE - ALARM FINAL | wmotto1 | Approved |