Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2021 | BUILDING PRE-SLAB | Approved | ||
| 09/28/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Roof Level East, Post Tension Cable System. Ok to place concrete in progress areas. | |
| 09/25/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #1; slab on grade at GL: A-B/1-4. Ok to place concrete in progress areas. | |
| 09/22/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Roof Level West at GL; A/4.4-1; A-C/1-4.1. Ok to place concrete in progress areas. | |
| 09/16/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #7 West at GL: C-G /1-4. Ok to place concrete in progress areas. | |
| 09/14/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #7 West at GL: A-C/1-4. Ok to place concrete in progress areas. After hours inspection on this date; please charge SUNDT Construction APA. If unable to charge account $165.00; money due to be paid via credit. |
|
| 09/11/2020 | BUILDING PRE-SLAB | Not ready for Inspection | . Not ready. Need to complete placement of rebar and cables, Electric and plumbing need to be installed. Will possibly require an after hours inspection. | |
| 09/08/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #6 East slab, Post Tension Cable System at GL: D-G/1-4. Ok to place concrete in progress areas. | |
| 09/03/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #6 West slab at GL: A-C.5/1-4. Ensure all rebar is properly tied; deck cleaned, and excess materials removed. Ok to place concrete in slab. | |
| 09/01/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post Tension Cable System at Level #5 East at GL:A-D/1-4. OK to place concrete in progress areas. | |
| 08/27/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #6 West at GL: A-D/1-4. Ok to place concrete in progress areas. | |
| 08/21/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #4 East at GL: 1/D.5-G; D.5/1-4; G/1-4; 4/D.5-G. Ok to place concrete in progress areas. | |
| 08/17/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post Tension Cable System at Level #4 West, GL: A-D.5/1-4.4. Ok to place concrete in progress areas. | |
| 08/13/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Armando. Level 3, Far East side of building. | |
| 08/10/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #3; Post Tension Cable System (West Section): GL: A-C/1-4.4. Ok to place concrete in progress areas. | |
| 07/31/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #2; East at GL: D-G/1-6. Ensure deck is clean of all debris; excess rebar and ensure all stud rails are secured. | |
| 07/27/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level #2 West half of slab at GL: A-D/1-6 of Post Tension Cable System. Ok to place concrete in progress areas. |