Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address NEW:
1151 E HERMANS RD #921
Apply Date:
05/04/2017
Applicant:
N/A
Description:
NEW MULTI PURPOSE BLDG
Architects:
  • JENNIFER CARR
Contractors:
  • BRASFIELD AND GORRIE L L C ,

Permit Reviews

Permit Number - T17CM03512
Permit Status: C of o
Permit Description: NEW MULTI PURPOSE BLDG
Start Date Submittal Complete Date Status  
05/04/2017 PLANS OK TO SUBMIT - COMM 05/08/2017 COMPLETED Review Details
05/08/2017 COMMERCIAL - NEW 06/07/2017 COMPLETED Review Details
06/07/2017 RESUBMITTAL 06/16/2017 COMPLETED Review Details
06/16/2017 REVISION - - 1ST 07/17/2017 COMPLETED Review Details
07/17/2017 REVISION - - 1ST 09/19/2017 COMPLETED Review Details
09/19/2017 REVISION - - 1ST 09/21/2017 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T17CM03512
Permit Status: C of o
Permit Description: NEW MULTI PURPOSE BLDG
Total Outstanding Activity Conditions - 1
Date Name
05/04/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T17CM03512
Permit Description: NEW MULTI PURPOSE BLDG
Total Completed Inspections - 39
Date Description Inspector Results Comments
11/15/2017 PLUMBING - ROUGH, SOIL RCAMACHO Approved SEE HIGHLIGHTED AREA B BATHROOMS ONLY
12/06/2017 PLUMBING - PRE SLAB RCAMACHO Approved AFTER HOURS APA ACCOUNT $165.00
GRID LINES A-E FROM 1-3 GROUND FLOOR ONLY
12/06/2017 PLUMBING - PRE SLAB RCAMACHO Approved WORK NOT COMPLETE
12/06/2017 ELECTRIC - UFER RCAMACHO Approved WORK NOT COMPLETE
12/06/2017 ELECTRIC - UNDERGROUND RCAMACHO Approved WORK NOT COMPLETE
12/15/2017 BUILDING PRE-SLAB RCAMACHO Approved COLUMN POUR BACKS A/1, B/1, C/1, D/1, A/2, A/3, A/4, A/5, A/6 AND A/7 ONLY
01/23/2018 ROOF NAILING rbaldwin Approved
02/08/2018 STUCCO MESH rbaldwin Approved not applicable
06/15/2018 MECHANICAL - UNDERGROUND RCAMACHO Approved
06/15/2018 U VALUE FOR WINDOW RCAMACHO Approved
07/26/2018 PLUMBING - INTERMEDIATE RCAMACH1 Approved
09/26/2018 FRAMING RCAMACHO Approved
10/02/2018 MECHANICAL - PROGRESS RCAMACHO Approved
10/02/2018 MECHANICAL - INTERMEDIATE RCAMACHO Approved
10/02/2018 MECHANICAL - HYDRONIC PIPING RCAMACHO Approved
10/02/2018 PLUMBING - PROGRESS RCAMACHO Approved
10/02/2018 ELECTRIC - PROGRESS RCAMACHO Approved
10/04/2018 MECHANICAL - ABOVE CEILING RCAMACHO Approved
10/04/2018 PLUMBING - ABOVE CEILING RCAMACHO Approved
10/04/2018 BUILDING - PROGRESS RCAMACHO Approved
10/04/2018 SHEET ROCK NAILING RCAMACHO Approved
10/04/2018 BUILDING ABOVE CEILING RCAMACHO Approved
10/09/2018 PLUMBING - GAS PRESSURE TEST RCAMACHO Approved
10/11/2018 PLUMBING - GAS PRESS TEST FNL RCAMACHO Approved OK TO CLEAR GAS
10/11/2018 ELECTRIC - TEMP POWER FOR TEST RCAMACHO Approved
10/11/2018 PLUMBING - YARD WTR LINE/TEST RCAMACHO Approved
10/11/2018 ELECTRIC - CONSTRUCTION POWER RCAMACHO Approved
10/11/2018 ELECTRIC - INTERMEDIATE RCAMACHO Approved
10/12/2018 GAS CLEARANCE RCAMACHO Approved
10/18/2018 FIRE - ALARM FINAL JPEELDAVIS Approved Add h/s outside storage A0110
Change H/S to Strobe only in bathrooms 1B0110, 1B0130, and change to 30 candella
Change H/s to Strobe only wellness room 1 B0255
Change Front Lobby HS to 95 Candella
Change 2 h/s office 1B0200 from 15 cd to 75 cd
Change Conference room 1B0315h/s to 30 candella
All team rooms in the building need to be strobe only and 15 candella
Add H/S to corridor outside conference #9
Office 1163? H/S not working properly
conference room #6 change from 15cd to 30cd
Bathroom 1J0310 and 1J0320 need to be strobe only
change h/s in wellness room #1B0655 to strobe only
Add manual pull station to office 1B0200 by north door
Conference room # 15 is 15 csandella and needs to be 30
Bathroom #1C0545 & 1C0525 need to be changed to strobe only
Office #13 hs back area is 15 cd and needs to be 75 cd
Office #12 front h/s is not working and needs to be replaced
Vestibule # 10 replace the h/s with a 15 cd strobe only
2 H/s Main electrical room need to be raised to the proper height
All power supplies to have a red breaker labels Fire Alarm
Mag locks on the front door need to be connected to the fire alarm
Level 2 area add notification corridor 2.3 by conference room 200295
All Team rooms 5,7,9& 10 need to be changed to strobe only devices
Conference Room # 17 & 18 need to be changed to 30 candella
East side restroom needs to be changed to 30 candella
10/18/2018 FIRE SPKLR - FINAL JPEELDAVIS Approved Replace missing esuctcheons and add 2 heads in the electrical rooms 3rd floor
Office # 5 has a leaking head
NW Waiting has a painted head
Electrical rooms first floor need to have 2 heads added to under the duct work
10/19/2018 MECHANICAL - FINAL MRAMBER Approved
10/22/2018 BUILDING - FINAL RCAMACHO Approved Pending all revisions to building
pending chlorination report to Bob Sherry okay to apply for temporary C of o
10/22/2018 ELECTRIC - FINAL RCAMACHO Approved
10/22/2018 ELECTRIC - ABOVE CEILING RCAMACHO Approved
10/23/2018 PLUMBING - FINAL RSHERRY Approved REVIEW OF WATER CHLORINATION REPORT COMPLETED. PENDING ALL REVISIONS TO BUILDING
10/24/2018 FIRE - FINAL JPEELDAVIS Approved OK to obtain a TCO
10/26/2018 ENGINEERING - FINAL RLEDON Approved PER PHONE OK FOT TCO
04/03/2019 ELECTRIC - SERVICE UPGRADE RCAMACHO Approved

Documents

File Name Document Type  
C OF O T17CM03512.PDF DOCUMENTS VIEW
FINAL SIC T17CM03512 - BLDG 928.921.PDF DOCUMENTS VIEW
TCO REQUEST.PDF DOCUMENTS VIEW
TCO.PDF DOCUMENTS VIEW
T17CM03512 - TCO.PDF CERT OF OCC VIEW