Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2018 | ELECTRIC - TEMP POWER FOR TEST | Approved | ||
| 07/17/2018 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | ELEC ROOM 1BO515 OK TO ENERGIZE SUBPANELS | |
| 07/13/2018 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | panels at interstitial ok to energize for testing | |
| 06/29/2018 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | NO CLEARANCE REQUIRED EXISTING POWER FROM RAYTHEON FOR TEST ONLY. RECALL FOR POWER CLEARANCE FROM TEP SUBSTATION AT LATER DATE. LOCK OUT TAG OUT ALL SWITCHGEAR AT THIS TIME |