Permit: T17CM03512

Parcel: 14043013B

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T17CM03512

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
06/12/2019 ENGINEERING - FINAL Approved
04/25/2019 ENGINEERING - FINAL Partial Approval MET WITH GREG ONSITE TO LOOK AT THE DETENTION/RETENTION BASINS ON THE NORTH SIDE OF THIS SITE. THEY HAVE COMPLETED THE INSTALLATION OF MOST OF THE PLANTS, THEY WILL RESCHEDULE THIS INSPECTION ONCE ALL OF THE LANDSCAPING IS COMPLETED PER THE APPROVED PLANS.
01/31/2019 ENGINEERING - FINAL Continued rescheduled for 02/01/2019
01/30/2019 ENGINEERING - FINAL Not ready for Inspection Greg at 205-757-7833 is not answering his phone or returning my call. I will need plans and access to the building perimeter in order to complete inspection. Also complete and schedule for inspection your development package wor on your DP permit for final approval. Note temporary fencing has been installed around the laydown/contractor yards isolating the yard from the new buildings. Inspector has no issues preventing a temporary C of O
10/26/2018 ENGINEERING - FINAL Partial Approval PER PHONE OK FOT TCO
10/22/2018 ENGINEERING - FINAL Partial Approval I WALKED THE SITE WITH GERALD AND LOOKED AT THE MODIFICATIONS TO A NORTHERN DOORWAY OUT TO THE NORTHERN SIDEWALK. THE WORK LOOKS OK EXCEPT THERE IS NOT A RAMP TO PROVIDE ACCESS THROUGH THE 6" CURB TO THE SIDEWALK, CURRENTLY IT IS A STEP AT THIS TIME. I WILL DISCUSS THIS SITUATION WITH STEVE/ZONING TO SEE IF IT IS REQUIRED TO HAVE ADA ACCESS.