Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T17CM03512
Inspection Description - FIRE - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2022 | FIRE - FINAL | Approved | ERRC provided by Raytheon from Modtech portable unit and approved by Chief Ryan. System is not code compliant, not monitored and will be stored and maintained by Raytheon. Approved for COFO. | |
| 10/22/2019 | FIRE - FINAL | Partial Approval | EVERYTHING IS COMPLETE ON THE BUILDING EXCEPT FOR THE EMERGENCY RESPONDER RADIO COVERAGE THAT RAYTHEON NEEDS TO PROVIDE | |
| 09/11/2019 | FIRE - FINAL | Partial Approval | 2 way communication needs 4 IP addresses to work properly Everything else on the fire list was cleared COFO WILL NOT BE ISSUED WITHOUT EMERGENCY RESPONDER RADIO COVERAGE APPROVED & FINAL |
|
| 03/15/2019 | FIRE - FINAL | Partial Approval | Add exit signs by colums G6 & F4 2 way communication needs 4 IP addresses to work properly Everything else on the fire list was cleared COFO WILL NOT BE ISSUED WITHOUT EMERGENCY RESPONDER RADIO COVERAGE APPROVED & FINAL |
|
| 10/24/2018 | FIRE - FINAL | Partial Approval | OK to obtain a TCO | |
| 10/18/2018 | FIRE - FINAL | Partial Approval | Exit light 3rd loor SE needs to have the chevron added Panel scheules need to be in each electrical panel Panels need to be labeled Fire smoke dampers labeled 1/2" letters Maglocks on front door need to be connected to the fire alarm system Unclassified office needs double sided exit signs Add exit sign double doors by housekeeping both floors Remove all temporary lighting fixtures Generator needs to be monitored by the fire alarm Generator needs to kick on within 30 seconds |