Inspection History Details
Inspection Status: Approved
Inspection History: SHEET ROCK NAILING
Permit Number - T17CM03512
Inspection Description - SHEET ROCK NAILING
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2018 | SHEET ROCK NAILING | Approved | ||
| 09/14/2018 | SHEET ROCK NAILING | Partial Approval | Level 1 lobby 1A0100 Level 2 lobby 2A0100 Level 1 corridor 1.7 1F0690 except drywall patch fire wall at office 15 & Level 2 corridor 1.7 2F0690 |
|
| 08/24/2018 | SHEET ROCK NAILING | Partial Approval | IVRS - Inspection :* LEVEL 1 ALL CORRIDOR HARD LIDS AT CORNERS STAIRWELL 1 LEVEL 2 AND INTER. ONLY |
|
| 08/06/2018 | SHEET ROCK NAILING | Partial Approval | BATHROOMS ROOM # 1B0110 & 1B0130 ONLY | |
| 08/03/2018 | SHEET ROCK NAILING | Partial Approval | STAIRWELL 1 EXCEPT SOUTH WALL AND FIRE CAULK TOP OF NORTH WALL PIPING | |
| 08/02/2018 | SHEET ROCK NAILING | Not ready for Inspection | IVRS - Inspection :* | |
| 07/25/2018 | SHEET ROCK NAILING | Partial Approval | INT. LEVEL STAIRWELL 2 EXTROIOR WALLS ONLY | |
| 07/24/2018 | SHEET ROCK NAILING | Partial Approval | ROOMS 1 B0205, 1B0215 & 1B0255 | |
| 07/23/2018 | SHEET ROCK NAILING | Not ready for Inspection | cancelled | |
| 07/18/2018 | SHEET ROCK NAILING | Partial Approval | JANITOR CLOSET EAST ELEVATOR WALL ONLY | |
| 07/17/2018 | SHEET ROCK NAILING | Partial Approval | BATHROOMS 2B0120 & 2B0130 ONLY | |
| 07/16/2018 | SHEET ROCK NAILING | Partial Approval | 2ND LAYER COMPUTER ROOMS ONLY | |
| 07/12/2018 | SHEET ROCK NAILING | Partial Approval | 1st layer elevator shaft interstitial | |
| 07/06/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 07/03/2018 | SHEET ROCK NAILING | Partial Approval | IVRS - Inspection :* OFFICE 9 1ST LAYER BATHROOMS ROOMS J0310 & 1J0320 |
|
| 06/28/2018 | SHEET ROCK NAILING | Partial Approval | 1ST LAYER CONF. ROOMS A0110 & A0125 2ND LAYER LEVEL 2 ROOM 2A0110 & 2A0125 1ST LAYER LEVEL 1 ELEVATOR EXTERIOR WALLS ONLY ELEVATOR CORRIDOR NORTH WALL LEVEL 1 |
|
| 06/27/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 06/25/2018 | SHEET ROCK NAILING | Partial Approval | WOMENS BATHROOM ROOM 1C0525 LOBBY NORTH WALL INT. LEVEL LOBBY WEST WALL INT. LEVEL |
|
| 06/20/2018 | SHEET ROCK NAILING | Partial Approval | 2ND LAYER SOUTH WALL CORRIDOR LEVEL 1 | |
| 06/19/2018 | SHEET ROCK NAILING | Partial Approval | SOUTH CORRIDOR NORTH WALL ONLY 2ND LAYER | |
| 06/15/2018 | SHEET ROCK NAILING | Not ready for Inspection | NO WORK | |
| 06/14/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 06/14/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 06/13/2018 | SHEET ROCK NAILING | Not ready for Inspection | cancelled | |
| 06/13/2018 | SHEET ROCK NAILING | Partial Approval | ENTRY WAY STAIRWELL 3 | |
| 06/12/2018 | SHEET ROCK NAILING | Not ready for Inspection | no work | |
| 06/08/2018 | SHEET ROCK NAILING | Partial Approval | EAST CORRIDOR 2B0100 SECURITY OFFICE 2B0275 CAFETERIA SOUTH WALL CAFETERIA NORTH WALL 2ND LAYER |
|
| 06/07/2018 | SHEET ROCK NAILING | Partial Approval | SOUTH EXTERIOR CAFETERIA WALL EXTERIOR STAIR 1 1ST FLOOR |
|
| 06/06/2018 | SHEET ROCK NAILING | Partial Approval | VESWTIBLE #10 1ST LAYER ONLY | |
| 06/04/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 06/01/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 05/31/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 05/30/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 05/29/2018 | SHEET ROCK NAILING | Partial Approval | INTERSTITIAL ELEVATOR SHFT LINER,FRAMING AND FIRE CAULKING OK TO COVER | |
| 05/24/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR WEST IT CORRDOR, 2ND LAYER WEST CORRIDOR OK | |
| 05/23/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FL NORTH COORIDOR 2ND LAYER OK | |
| 05/21/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR VESTIBULE 2,6,8 POPOUTS | |
| 05/18/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR LARGE CONF VESTIBULE, SOUTH CORRIDOR E3-C3 BOTH SIDES EAST CORRIDOR 1ST LAYER | |
| 05/18/2018 | SHEET ROCK NAILING | Partial Approval | 2ND FLOOR WEST RESTROOMS AND JANITORS ROOM | |
| 05/16/2018 | SHEET ROCK NAILING | Partial Approval | OFFICE 1 VESTIBULE AND CONF ROOM, SOUTH HALL GRID E3-C3 BOTH SIDES, FIRE CAULK 1ST LAYER AT COLUMN C1 | |
| 05/15/2018 | SHEET ROCK NAILING | Partial Approval | GRID LINE A3-C3,SOUTH CORRIDOR J3-E3 1STLAYER BOTH WALLS, OFFICE 1 TEAM ROOM AND OFFICE 1 EXCEPT SOUTH WALL | |
| 05/14/2018 | SHEET ROCK NAILING | Partial Approval | VESTIBULES 7,5,4&3 POPOUTS | |
| 05/11/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 05/10/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 05/07/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR SOUTH CORRIDOR K3-H3, 6&8 TEAM AND CONF ROOMS OFFICE2, LG CONF ROOM EAST,WEST AND SOUTH WALLS | |
| 05/04/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR OFFFICE 8 | |
| 05/03/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR E CORRIDOR COMLETE, NORTH CORRIDOR SOUTH WALL C7-HT 1ST LAYER 2ND FLOOR C RESTROOMS | |
| 05/02/2018 | SHEET ROCK NAILING | Partial Approval | ||
| 04/30/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR COLUMNS G4,H5,H6,J5 &J6, NORTH EXTERIOR WALL K-H | |
| 04/27/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 04/26/2018 | SHEET ROCK NAILING | Partial Approval | OFFICES 3&T TEAM ROOMS | |
| 04/25/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR OFFICE 4, TEAM AND CONF, OFFICE 3,SOUTH WALLS OFFICES 7&5, TEAM AND CONF ROOMS | |
| 04/24/2018 | SHEET ROCK NAILING | Partial Approval | 1st fl office 5 south wall,team and conference rooms, office 8 wing wall, large electric room, west womens rr above 9' 2nd fl west rr above 9', n corridor c7-f7 | |
| 04/23/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FL NCIT, CLASSIFIED C, EAST CORRIDOR WEST WALL D4-D7, OFFICES 5&7 N,E&W WALLS | |
| 04/20/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR SOFFITT GRID C3-F3, WING WALLS 11-16, 2&4 | |
| 04/19/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FL OFFICE 10 AND TEAM RM, 2ND FLOOR OFFICE 19 N WALL | |
| 04/18/2018 | SHEET ROCK NAILING | Partial Approval | IFFICE 19 S,W&ESAT WALLS,SECURITY E,W& SOUTH WALLS | |
| 04/17/2018 | SHEET ROCK NAILING | Partial Approval | 2ND FLOOR SECURIRY A AND LARGE CONFERENCE ROOMS 1ST LAYER COMPLETE | |
| 04/16/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR OFFICE 14 N WALL,SOUTH WALL NORTH CORRIDOR E7-C7, EAST WALL EAST CORRIDOR C7-C5, ELECTRI ROOM C, MAIN ELECTRIC ROOM N,E&W WALLS | |
| 04/13/2018 | SHEET ROCK NAILING | Partial Approval | TEAM ROOM 14 AND CONFERENCE ROOM 14 1ST LAYER ONLY OFFICE 13 NORTH WALL, TEAM ROOM 13 AND CONFERENCE ROOM 13 1ST LAYER ONLY CONFERENCE ROOM 1B0315 1ST LAYER ONLY |
|
| 04/13/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR OFFICES TEAM, CONF ROOMS AND VESTIBULES IN 11,12,13 OK VESTIBULE 14, SMALL CONF ROOMS 1&2 OK 2ND FLOOR OFFICE 1 EAST WALL FROM EXPANSION TO NORTH OK VESTIBULE 5 AND NCIT ROOM OK | |
| 04/11/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FL COLUMN C4, 2ND FLOOR VESTIBULE 8, TEAM&CONF 1, OFFICE 3&5 COLUMNS | |
| 04/09/2018 | SHEET ROCK NAILING | Partial Approval | 2ND FLOOR LARGE CONF E,W&S WALLS,EAST END CENTER CORRIDOR,TEAM ROOM 2,VESTIBULE AND CONF RM 3, NCIT, 1ST FLOOR VESTIBULE 14,OFFICE,TEAM & CONF 13 ELECTRIC ROOM B | |
| 04/06/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 04/05/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR OFFICE 14 CONF ROOM 1ST LAYER | |
| 04/04/2018 | SHEET ROCK NAILING | Partial Approval | 2ND FLOOR CONF ROOMS 5,9 TEAM ROOM 7 | |
| 04/02/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR SMALL CONF RMS 1&2, OFFICE 15 TEAM AND CONF, OFFICE 14 E,W &S WALLS 2ND FL OFFICE 9 TEAM & CONF,CONF2 TEAM 4 OFFICES 3,5,7 S.E&W WALLS | |
| 03/29/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 03/28/2018 | SHEET ROCK NAILING | Partial Approval | 2ND FLOOR ROOMS 2,4,6,7&5 TEAM AND CON RMS OK ROOMS 9,7,5 OK EXCEPT VESTIBULES 9 TEAM AND CONF OK UP 12' | |
| 03/27/2018 | SHEET ROCK NAILING | Partial Approval | 2ND FL E,W,&S WALLS LG CON,OFFICES 9,7, TEAM RM 8 | |
| 03/26/2018 | SHEET ROCK NAILING | Partial Approval | 2ND FLOOR ABOVE 9' RESTOOMS C, OFFICE 12&13 COLUMNS, TEAM ROOM 8 | |
| 03/23/2018 | SHEET ROCK NAILING | Partial Approval | 12,14 TEAM AND CONF ROOMS, OFFICE 8 SOUTH WALL 2ND FLOOR VESTIBULES 4,6&8 | |
| 03/22/2018 | SHEET ROCK NAILING | Partial Approval | interstial n,e and west walls ok to tape | |
| 03/22/2018 | SHEET ROCK NAILING | Partial Approval | 2ND FL VESTIBULES 2,4 EAST WALL CENTER CORRIDOR | |
| 03/21/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR CONF ROOMS 1&2 EXCEPT VESTIBULE WALLS 1ST LAYER 2ND FLOOR CONF 11 1ST LAYER COMPLETE | |
| 03/19/2018 | SHEET ROCK NAILING | Partial Approval | 1ST FLOOR UNCLASSSIFIED ROOM SOUTH AND WEST WALLS 1ST LAYER, SMALL CONF ROOM 2 1ST KAYER EXCEPT VESTIBULE WALL 2ND FLOOR VESTIBULE 14,OFFICE 12 TOPOUT EXCEPT N WALL, OFFICE 11 UP 12' 1ST LAYER | |
| 03/16/2018 | SHEET ROCK NAILING | Partial Approval | 1st floor room b0435 ok | |
| 03/15/2018 | SHEET ROCK NAILING | Partial Approval | 2nd floor offices 8&13 1st layer topout except south walls | |
| 03/14/2018 | SHEET ROCK NAILING | Partial Approval | 1st floor rooms b0455 bo515 ok 2nd floor ncit room top out, offices 8&13 ok up to 12' | |
| 03/13/2018 | SHEET ROCK NAILING | Partial Approval | 2nd floor vestibules 2,6,15and classified 1st layer complete 1st floor columns a4-at b4-b7 | |
| 03/12/2018 | SHEET ROCK NAILING | Partial Approval | office 14 team and con rooms 1st layer 2nd fl electric room, classified room e,w & s walls 1st layer | |
| 03/07/2018 | SHEET ROCK NAILING | Partial Approval | 2nd floor office 6 1st layer complete office 14 1st layer topout east,west and south walls | |
| 03/06/2018 | SHEET ROCK NAILING | Partial Approval | 2nd floor office 6 west wall up10' ok, office 13 e wall up 10' ok, columns j7,f7-c7, c6 ok lg conf. rm east and south walls 1st layer topout 1st fl cafe west wall b5-b7 ok | |
| 03/05/2018 | SHEET ROCK NAILING | Partial Approval | 1st floor a4.5-a7 a7-b7.5 2nd floor office 2 fisrt layer topout, office 2 conference room 1st layer topout oustide vestbules 5-12 | |
| 03/02/2018 | SHEET ROCK NAILING | Partial Approval | ||
| 03/01/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 02/28/2018 | SHEET ROCK NAILING | Partial Approval | 1st layer office 4 top out, 1st layer topout west and nirth walls office 2 | |
| 02/27/2018 | SHEET ROCK NAILING | Partial Approval | 2nd floor 1st layer complete rms 15 &16 up 10' e n & w walls office 4 1st layer | |
| 02/23/2018 | SHEET ROCK NAILING | Partial Approval | 1 st layer confrerence room complete | |
| 02/22/2018 | SHEET ROCK NAILING | Not ready for Inspection | ||
| 02/21/2018 | SHEET ROCK NAILING | Partial Approval | 1st layer west corridor complete 2k corridor office 15 1st layer up to 10' office 16 east and south wall 1st layer topout con 2 up 10' rm 18 n,e,s walls 1st layer rm 18 1st layer comp con rm 1 1st layer topout ok | |
| 02/16/2018 | SHEET ROCK NAILING | Partial Approval | office 16 1st layer ok to cover up 10' east wall west corridor k3-k6 1st layer ok to cover | |
| 02/15/2018 | SHEET ROCK NAILING | Partial Approval | 2nd floor area c restooms west wall, c6-c7 | |
| 02/14/2018 | SHEET ROCK NAILING | Partial Approval | 1st layer on south wall north corridor grid h7-k7 | |
| 02/13/2018 | SHEET ROCK NAILING | Partial Approval | center corridor ok, north corridor south wall 1st layer j7 to g7 ok | |
| 02/09/2018 | SHEET ROCK NAILING | Partial Approval | 1st layer room 17, east corridor west wall c3 to electric corridor, south wall center corridor up 12' ok | |
| 02/08/2018 | SHEET ROCK NAILING | Partial Approval | 2nd floor e3-h3 1st layer | |
| 02/08/2018 | SHEET ROCK NAILING | Partial Approval | 1st layer north wall corridor h3-j3 | |
| 02/06/2018 | SHEET ROCK NAILING | Partial Approval | 2nd floor 1st layer sout wall of north corridor d7-f7.5, 2nd layer south wall north corridor d7=c7, 1st layer north wall room 2c0545 | |
| 02/01/2018 | SHEET ROCK NAILING | Partial Approval | south side of north corridor from f7 to c7 1st layer ok, east corridor from c5 to c7 1st layer ok | |
| 01/31/2018 | SHEET ROCK NAILING | Partial Approval | s outh wall interstial ok to tape, north and east walls room 117 ok to tape |