Permit: T09CM00308
Permit Details
Apply Date:
02/10/2009
Applicant:
N/A
Description:
NEW: RAYTHEON METAL BUILDING, LOW FREQUENCY CHAMBER
Contractors:
- CONCORD COMPANIES INC
Permit Reviews
Permit Number - T09CM00308
Permit Status: C of o
Permit Description: NEW: RAYTHEON METAL BUILDING, LOW FREQUENCY CHAMBER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/29/2010 | REVISION - - 2ND | 01/29/2010 | COMPLETED |
02/10/2009 | PLANS OK TO SUBMIT - COMM | 02/10/2009 | COMPLETED |
02/10/2009 | PLANS OK TO SUBMIT - SITE | 02/10/2009 | COMPLETED |
02/10/2009 | COMMERCIAL NEW | 03/13/2009 | COMPLETED |
02/10/2009 | SITE | 03/13/2009 | COMPLETED |
03/24/2009 | RESUBMITTAL | 04/21/2009 | COMPLETED |
03/24/2009 | RESUBMITTAL - SITE ALL | 04/21/2009 | COMPLETED |
04/21/2009 | RESUBMITTAL | 04/24/2009 | COMPLETED |
04/29/2009 | RESUBMITTAL | 05/01/2009 | COMPLETED |
04/29/2009 | RESUBMITTAL - SITE | 05/01/2009 | COMPLETED |
05/01/2009 | RESUBMITTAL | 05/07/2009 | COMPLETED |
06/17/2009 | PLANS OK TO SUBMIT - COMM | 06/17/2009 | COMPLETED |
06/17/2009 | COMMERCIAL NEW | 07/29/2009 | COMPLETED |
06/23/2009 | REVISION - - 1ST | 06/23/2009 | COMPLETED |
08/23/2010 | REVISION - - 3RD | 08/23/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09CM00308
Permit Status: C of o
Permit Description: NEW: RAYTHEON METAL BUILDING, LOW FREQUENCY CHAMBER
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/10/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T09CM00308
Permit Description: NEW: RAYTHEON METAL BUILDING, LOW FREQUENCY CHAMBER
Total Completed Inspections - 40
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2009 | ROOF NAILING | MHENSON | Approved | IVRS - Inspection :* 1) REVIEWED SPECIAL INSPECTION RESULTS FOR BOLTING |
10/09/2009 | PLUMBING - PRE SLAB | RLEDONNE | Approved | IVRS - Inspection :* 1) FROM FLOOR SINK STUB OUT SIDE OF BLDG |
10/09/2009 | EXT METAL CLIPS/EXT SHEATHING | GDABBS | Approved | IVRS - Inspection :* 1) EASS METAL SIDING WALL FROM 20' AFFE TO TOP OUT |
10/14/2009 | PLUMBING - ROUGH, SOIL | RLEDONNE | Approved | IVRS - Inspection :* 1) FLOOR SINK ON NORTH SIDE OF BLDG PER RED LINE ON APPROVED PLAN AND RFI |
10/15/2009 | ELECTRIC - UFER | MHENSON | Approved | IVRS - Inspection :* 1) 4 OT CONTINOUS ALONG SOUTH SIDE OF BLDG WITH WHIPS TO BLDG AND GROUND RODS AT CORNERS CADWELDED |
10/23/2009 | STEM WALL/RETAINING WALL | MHENSON | Approved | IVRS - Inspection :* LOADING DOCK MASONRY COL?? REINFORCEMENT OK TOP OUT PROVIDING SPECIAL INSPECTION PROVIDE RFI FOR BOLT PLATES |
11/17/2009 | ELECTRIC - UNDERGROUND | RHOLLAND | Approved | IVRS - Inspection :* 1) OK PVC POLE TO POLE AND PULL BOX AS MARKED ON PLANS |
11/23/2009 | ELECTRIC - TEMPORARY SERVICE | RHOLLAND | Approved | IVRS - Inspection :* 1) OK TO ENERGIZE SES B-2 UNDER CONTRACTOR LO/TO |
11/23/2009 | ELECTRIC - CABLE DROP | RHOLLAND | Approved | IVRS - Inspection :* |
12/03/2009 | BUILDING PRE-SLAB | MHENSON | Approved | IVRS - Inspection :* EQUIPMENT SLAB SE CORNER #4 160C |
12/07/2009 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* 1) OK TO PROCEED |
12/10/2009 | ELECTRIC - OUTDOOR LIGHTING | RHOLLAND | Approved | IVRS - Inspection :* 1) OK 4 POLE BASE |
12/11/2009 | FRAMING | MHENSON | Approved | IVRS - Inspection :* LIGHT GAUGE COMPLETE |
12/15/2009 | SHEET ROCK NAILING | MHENSON | Approved | IVRS - Inspection :* 1) SOUTH CENTER OFFICES-EXTERIOR |
12/15/2009 | BUILDING - PROGRESS | MHENSON | Approved | IVRS - Inspection :* 1) DRY ? ON ALL SCREEN WALL EXCEPT 2 ON SOUTH SIDE 2) DRY ? INTERIOR COLUMNS |
12/17/2009 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* 1) STEEL REINFORCEMENT AT 2 CONCRETE COLUMNS SOUTH SIDE AT GRID LINE A BETWEEN #4 AND #5 OK 2) PLATFORM FRAMING PRE SLAB DECKING, PUDDLE WELDS BOTTOM PUNCHING, WELDED REBAR AT TWO SIDES WELDED WIRE PLACEMENT AND DRY PACK AT I BEAM COLUMNS OK |
12/17/2009 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* 1) OK BATHROOM WALLS |
12/17/2009 | ELECTRIC - PROGRESS | RHOLLAND | Approved | IVRS - Inspection :* |
12/24/2009 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* |
05/21/2010 | SIGN - FINAL | JYBARRA | Approved | |
06/18/2010 | PLUMBING - PROGRESS | RLEDONNE | Approved | IVRS - Inspection :* |
06/18/2010 | PLUMBING - GAS PRESS TEST FNL | RLEDONNE | Approved | IVRS - Inspection :* |
06/18/2010 | PLUMBING - GAS PRESSURE TEST | RLEDONNE | Approved | IVRS - Inspection :* |
06/18/2010 | PLUMBING - YARD WTR LINE/TEST | RLEDONNE | Approved | IVRS - Inspection :* |
06/18/2010 | PLUMBING - ABOVE CEILING | RLEDONNE | Approved | IVRS - Inspection :* |
07/01/2010 | NPPO - FINAL | DROBERTS | Approved | |
07/01/2010 | ENGINEERING - FINAL | DROBERTS | Approved | SITE NOT READY AT THIS TIME, WALKED SITE WITH TOM 419-3907 AND LOOKED AT THE ITEMS THAT ARE STILL NEEDING TO BE ADDRESSED AT THIS TIME. 1) THE DOWNDRAINS LOCATED AT THE MAIN ENTRY WAY INTO THE BUILDING DEPOSIT THE WATER ONTO THE SIDEWALK AND THE BIKEPATH PEDESTAL, THIS NEEDS TO BE REDIRECTED TO A BETTER LOCATION. 2) REPAIR ALL DAMAGED PEDESTRIAN ACCESSIBLE AREAS AS NEED. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE BROKEN BICYCLE PARKING SLAB. |
07/01/2010 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
07/02/2010 | RIGHT OF WAY - FINAL | MOTERO | Approved | |
09/21/2010 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* 1) INNER CHAMBER SCOPE BY RAYTHEON 2) ELECTRICAL BY OTHERS |
09/21/2010 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* |
09/22/2010 | LANDSCAPE - FINAL | DROBERTS | Approved | |
09/29/2010 | FIRE - ALARM FINAL | LTHOMAS | Approved | |
09/29/2010 | FIRE - HYDRANTS | LTHOMAS | Approved | |
09/29/2010 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
09/29/2010 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
09/29/2010 | FIRE - FINAL | LTHOMAS | Approved | |
10/14/2010 | BUILDING - FINAL | MHENSON | Approved | IVRS - Inspection :* |
10/14/2010 | BUILDING ABOVE CEILING | MHENSON | Approved | IVRS - Inspection :* |
10/14/2010 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |