Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/01/2010 |
ENGINEERING - FINAL |
|
Approved |
SITE NOT READY AT THIS TIME, WALKED SITE WITH TOM 419-3907 AND LOOKED AT THE ITEMS THAT ARE STILL NEEDING TO BE ADDRESSED AT THIS TIME. 1) THE DOWNDRAINS LOCATED AT THE MAIN ENTRY WAY INTO THE BUILDING DEPOSIT THE WATER ONTO THE SIDEWALK AND THE BIKEPATH PEDESTAL, THIS NEEDS TO BE REDIRECTED TO A BETTER LOCATION. 2) REPAIR ALL DAMAGED PEDESTRIAN ACCESSIBLE AREAS AS NEED. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE BROKEN BICYCLE PARKING SLAB. |
| 05/21/2010 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
no contractor onsite, site not ready |