Permit: T09CM00308

Parcel: 140430130

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T09CM00308

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
02/25/2010 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
1) TRENCH DRAIN AT DOCK INSTALLED PER PLAN 4" MINIMUM CONCRETE COVERAGE
12/17/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) STEEL REINFORCEMENT AT 2 CONCRETE COLUMNS SOUTH SIDE AT GRID LINE A BETWEEN #4 AND #5 OK
2) PLATFORM FRAMING PRE SLAB DECKING, PUDDLE WELDS BOTTOM PUNCHING, WELDED REBAR AT TWO SIDES WELDED WIRE PLACEMENT AND DRY PACK AT I BEAM COLUMNS OK
12/16/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) CANCELLED BY CONTRACTOR-NON COMPLIANT SPECIAL INSPECTION
12/10/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 4 LIGHT POLE CASSIONS OK
11/17/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) SCREEN WALL OK COMPLIANT SPECIAL CASSIONS
11/05/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 20 SUN SCREEN COLUMNS OK TO POUR WITH COMPLIANT SPECIAL INSPECTION
2) SPOKE WITH TOM WEST TECH ABOUT CLEARANCE TOP AND SIDES
3) RFI #66 BASE PLATES
10/26/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. WEST & SOUTH FZ FOOTINGS WITH VERTS SF1.2 #8 FOR SUNSCREEN 2 WEST TECH SPECIAL INSPECTED 3 FOOTING FOR SE COLUMN SITE WALL
10/22/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) NEED COMPLIANT SPECIAL INSPECTION FOR SHADE FOOTINGS 18" FROM TOP OF FOOTING TO FINISH GRADE
10/19/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 8 F2 FOOTINGS FOR SHADE SCREEN ON WEST END
10/16/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) LOADING DOCK STAIRS
10/14/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
10/09/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 5 HVAC EQUIPMENT PADS ON NORTH SIDE OF BLDG OK
09/29/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) CHAMBER PIT LANDING AND CONCRETE RAMP FOR STAIRS WITH FLAT BAR
08/06/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) NEED RFI FOR EXTRA CANOPY REINFORCEMENT SHOWN ON SHOP DRAWINGS NOT APPROVED PLANS
08/05/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) LOADING DOCK-OK
07/30/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CXD BY CONTRACTOR
07/28/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) INTERIOR COLUMN 5-F5 AND 2-F3 FOOTINGS
2) FOOTINGS 30 ON B1, 2 ON C.4 AND 2 ON C.9
07/20/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) CANCELLED PER CONTRACTOR
07/15/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) REMAINING J;B CROINE FOOTING (6) SB5.2
07/09/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) F6 FOOTING 7 AT B BIBB BRONE FOOTING
2) F2 FOOTINAT E8
07/07/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
LOADING DOCK SIDES:
1) NEED STAMPED RFI CHANGING WF4 FOOTING FROM #5 TO #4 REBAR
2) F8 AND F4 FOOTING NORTH WEST SIDES GRID LINES 8 AND E
3) SPECIAL INSPECTION WESTER TECH
06/17/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. REMAINING 8" & 12" CHAMBER PIT WALLS TOP OUT
2. WESTERN TECH. COMPLIANT REPORT TO BE PROVIDED
06/15/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
8" CHAMBER PIT WALLS OK TO CLOSE UP
06/10/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. FOOTING FOR PIT RAMP WALLS
2. WESTERN TECH. ON SITE
06/08/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REMAINING PIT FOOTINGS OK
WITH COMPLIANT SPECIAL INSPECTION
06/05/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELED W/LEE RAY
06/03/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 4-F4 FOOTINGS A/3.0 TO 6.0
2) 4-F2 FOOTINGS A/3,4,5,6
3) 1-F3 FOOTING A/3
4) WEST TECH SPECIAL INSPECTION
5) NEED FOOTING MODIFICATION APPROVED PER CITY OF TUCSON
06/02/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. 2-SOUTH F8 FOOTINGS, S.EAST F4 FOOTINGS,
1 SE F3 FOOTING
2. PROVIDE COMPLIANT SPECIAL INSPECTION
05/27/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
EAST CONCRETE DOCK WALL FOOTING @ 2 TO 5/B1.2
SPECIAL INSPECTION BY WESTERN TECH.
05/20/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
05/13/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) LOWER CHAMBER PIT WF2 AND WF4 FOOTING 2/5B5.2 AND 13/5B5.1
2) WEST ? SPECIAL INSPECTED
3) SPECIAL INSPECTIONS ADDED TO ACTIVITY
05/12/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WORKING ON CHAMBER PIT W2 & W4 FOOTINGS
WILL RECALL 5/13