Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T09CM00308

Parcel: 140430130

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
02/25/2010 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
1) TRENCH DRAIN AT DOCK INSTALLED PER PLAN 4" MINIMUM CONCRETE COVERAGE
12/17/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) STEEL REINFORCEMENT AT 2 CONCRETE COLUMNS SOUTH SIDE AT GRID LINE A BETWEEN #4 AND #5 OK
2) PLATFORM FRAMING PRE SLAB DECKING, PUDDLE WELDS BOTTOM PUNCHING, WELDED REBAR AT TWO SIDES WELDED WIRE PLACEMENT AND DRY PACK AT I BEAM COLUMNS OK
12/16/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) CANCELLED BY CONTRACTOR-NON COMPLIANT SPECIAL INSPECTION
12/10/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 4 LIGHT POLE CASSIONS OK
11/17/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) SCREEN WALL OK COMPLIANT SPECIAL CASSIONS
11/05/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 20 SUN SCREEN COLUMNS OK TO POUR WITH COMPLIANT SPECIAL INSPECTION
2) SPOKE WITH TOM WEST TECH ABOUT CLEARANCE TOP AND SIDES
3) RFI #66 BASE PLATES
10/26/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. WEST & SOUTH FZ FOOTINGS WITH VERTS SF1.2 #8 FOR SUNSCREEN 2 WEST TECH SPECIAL INSPECTED 3 FOOTING FOR SE COLUMN SITE WALL
10/22/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) NEED COMPLIANT SPECIAL INSPECTION FOR SHADE FOOTINGS 18" FROM TOP OF FOOTING TO FINISH GRADE
10/19/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 8 F2 FOOTINGS FOR SHADE SCREEN ON WEST END
10/16/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) LOADING DOCK STAIRS
10/14/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
10/09/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 5 HVAC EQUIPMENT PADS ON NORTH SIDE OF BLDG OK
09/29/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) CHAMBER PIT LANDING AND CONCRETE RAMP FOR STAIRS WITH FLAT BAR
08/06/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) NEED RFI FOR EXTRA CANOPY REINFORCEMENT SHOWN ON SHOP DRAWINGS NOT APPROVED PLANS
08/05/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) LOADING DOCK-OK
07/30/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CXD BY CONTRACTOR
07/28/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) INTERIOR COLUMN 5-F5 AND 2-F3 FOOTINGS
2) FOOTINGS 30 ON B1, 2 ON C.4 AND 2 ON C.9
07/20/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) CANCELLED PER CONTRACTOR
07/15/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) REMAINING J;B CROINE FOOTING (6) SB5.2
07/09/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) F6 FOOTING 7 AT B BIBB BRONE FOOTING
2) F2 FOOTINAT E8
07/07/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
LOADING DOCK SIDES:
1) NEED STAMPED RFI CHANGING WF4 FOOTING FROM #5 TO #4 REBAR
2) F8 AND F4 FOOTING NORTH WEST SIDES GRID LINES 8 AND E
3) SPECIAL INSPECTION WESTER TECH
06/17/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. REMAINING 8" & 12" CHAMBER PIT WALLS TOP OUT
2. WESTERN TECH. COMPLIANT REPORT TO BE PROVIDED
06/15/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
8" CHAMBER PIT WALLS OK TO CLOSE UP
06/10/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. FOOTING FOR PIT RAMP WALLS
2. WESTERN TECH. ON SITE
06/08/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REMAINING PIT FOOTINGS OK
WITH COMPLIANT SPECIAL INSPECTION
06/05/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELED W/LEE RAY
06/03/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 4-F4 FOOTINGS A/3.0 TO 6.0
2) 4-F2 FOOTINGS A/3,4,5,6
3) 1-F3 FOOTING A/3
4) WEST TECH SPECIAL INSPECTION
5) NEED FOOTING MODIFICATION APPROVED PER CITY OF TUCSON
06/02/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. 2-SOUTH F8 FOOTINGS, S.EAST F4 FOOTINGS,
1 SE F3 FOOTING
2. PROVIDE COMPLIANT SPECIAL INSPECTION
05/27/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
EAST CONCRETE DOCK WALL FOOTING @ 2 TO 5/B1.2
SPECIAL INSPECTION BY WESTERN TECH.
05/20/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
05/13/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) LOWER CHAMBER PIT WF2 AND WF4 FOOTING 2/5B5.2 AND 13/5B5.1
2) WEST ? SPECIAL INSPECTED
3) SPECIAL INSPECTIONS ADDED TO ACTIVITY
05/12/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WORKING ON CHAMBER PIT W2 & W4 FOOTINGS
WILL RECALL 5/13