Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
Permit Number - T09CM00308
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2010 | BUILDING PRE-SLAB | Approved | IVRS - Inspection :* | |
12/03/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* EQUIPMENT SLAB SE CORNER #4 160C |
|
10/16/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) EQUIPMENT SLAB N SIDE OF BLDG |
|
10/14/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) SLAB AT NORTH SIDE OF BLDG AROUND EQUIP PADS #41603 2) PUMP SLAB NOT READY 3) POUR AT OWN RISK DETAIL SB5.1 (8) NO VERTS OR #5 HORIZONTAL |
|
08/14/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) CHAMBER PIT MINUS 150 AND MINUS .72 SLABS |
|
07/31/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) A TO 8 AND A TO F MAIN BLDG |
|
07/22/2009 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER CONTRACTOR |
|
07/21/2009 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection :* | |
07/21/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) PRE-SLAB LOW FREQUENCY CHAMBER SLAB SB1.3, SB5.2-(9), (3) WF3 FOOTINGS AND 1F5 FOOTING AT 2.5 ON C4 2) AFTER HOURS INSPECTION CHECK #61532 FOR $150.00 |