Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/27/2010 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) TEST STUB OUT OF NORTH SIDE WALL AND TO ALL VALVES. PIPING INSTALLED PER RED LINE DRAWINGS 2) PER RONALD RUSSELL ENGINEERING 3) PROVIDE ? TO BE FOR FINAL |
|
| 01/21/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) INSTALL PER APPROVED PLANS |