Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
12/04/2007
Applicant:
RELIABLE PERMIT MANAGEMENT
Description:
NEW MEDICAL OFFICE BLDG
Architects:
  • BOLLARD, MARK EDWARD
Contractors:
  • DIVERSIFIED DESIGN AND CONSTRUCT

Permit Reviews

Permit Number - T07CM04528
Permit Status: C of o
Permit Description: NEW MEDICAL OFFICE BLDG
Start Date Submittal Complete Date Status  
01/09/2008 PLANS OK TO SUBMIT - 3RD PARTY 01/16/2008 COMPLETED Review Details
01/16/2008 3RD PARTY REVIEW-COMMERCIAL 03/25/2008 COMPLETED Review Details
01/30/2008 SITE 03/24/2008 COMPLETED Review Details
03/25/2008 POST 3RD PARTY REVIEW 05/05/2008 COMPLETED Review Details
03/26/2008 RESUBMITTAL - SITE 05/05/2008 COMPLETED Review Details
05/05/2008 RESUBMITTAL 06/05/2008 COMPLETED Review Details
05/05/2008 RESUBMITTAL - SITE 06/05/2008 COMPLETED Review Details
06/12/2008 RESUBMITTAL - SITE 06/26/2008 COMPLETED Review Details
06/12/2008 RESUBMITTAL 06/30/2008 COMPLETED Review Details
06/30/2008 RESUBMITTAL 07/09/2008 COMPLETED Review Details
10/21/2008 RESUBMITTAL 11/03/2008 COMPLETED Review Details
12/04/2007 PLANS OK TO SUBMIT - SITE 01/29/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07CM04528
Permit Status: C of o
Permit Description: NEW MEDICAL OFFICE BLDG
Total Outstanding Activity Conditions - 1
Date Name
12/04/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T07CM04528
Permit Description: NEW MEDICAL OFFICE BLDG
Total Completed Inspections - 40
Date Description Inspector Results Comments
11/07/2008 ELECTRIC - CONSTRUCTION POWER RHOLLAND Approved
12/03/2008 SHEET ROCK NAILING AQUIROZ Approved IVRS - Inspection :*
CORRIDOR 208 EXTERIOR SIDE TOP 4'
12/03/2008 PLUMBING - PRE SLAB RMYERS Approved OK FOR CONCRETE AT LOBBY AREA S.T.O.I
12/04/2008 ELECTRIC - PROGRESS RHOLLAND Approved IVRS - Inspection :*
1. NO FURTHER INSPECTION FOR UNDERGROUND
UNTIL 02010 ADDED TO PERMIT
2. OK PVC STUBS AT DS2 & DS3
3. OK OUTSIDE CONDUIT TO MAIN SES
4. 17 - 4" PVC; 4 - 2" PVC
12/17/2008 PLUMBING - ROUGH, SOIL RMYERS Approved IVRS - Inspection :*
12/18/2008 BUILDING PRE-SLAB AQUIROZ Approved IVRS - Inspection :*
1ST FLOOR
12/22/2008 PLUMBING - ROOF DRAINS BBENEDON Approved IVRS - Inspection :*
MAIN BUILDING RWLS TESTED TO ROOF OK
12/23/2008 ELECTRIC - INTERMEDIATE RHOLLAND Approved IVRS - Inspection :*
OK TO POUR FOR UFER
OK 3RD FLOOR CORRIDOR
OK 2ND FLOOR STAIRWELL AND ELECTRIC ROOM

1. BOND COPPER TO REBAR 250.6
2. REMOVE EXCESS LOOPS IN M/C CABLE
3. USE APPROVED STRAPS ON VERTICAL RUNS
12/23/2008 ELECTRIC - UFER RHOLLAND Approved IVRS - Inspection :*
12/30/2008 PLUMBING - INTERMEDIATE RMYERS Approved IVRS - Inspection :*
1) INTERIOR COLUMNS ON 2ND & 3RD FLOOR VTR OK TO COVER
2) THIRD FLOOR RESTROOM SOUTHSIDE DWV OK
04/21/2009 PLUMBING - GAS PRESSURE TEST RMYERS Approved
04/21/2009 PLUMBING - GAS PRESS TEST FNL RMYERS Approved IVRS - Inspection :*
04/28/2009 ELECTRIC - TEMP POWER FOR TEST DSANTACR Approved IVRS - Inspection :*
1) RECEIVED LETTER OF GFI MAIN TESTS, 2 BREAKERS 1000A AND 3000A
2) CONTR. TO INSURE ONLY AUTHORIZED PERSONS TO HAVE ACCESS TO ELECTRIC EQUIPMENT LOCK OUT AND TAG OUT EQUIPMENT
04/29/2009 TEP CLEARANCE - AM JWEATHER Approved TEC CLEARED FOR "HOUSE PANEL" PER D. SANTACRUZ
06/18/2009 ELECTRIC - ABOVE CEILING DSANTACR Approved IVRS - Inspection :*
07/13/2009 NPPO - FINAL PMCLAUGH Approved
07/13/2009 LANDSCAPE - FINAL PMCLAUGH Approved
07/13/2009 ENGINEERING - FINAL DROBERTS Approved
07/13/2009 RIGHT OF WAY - FINAL LLOPEZ Approved PER EMAIL
07/13/2009 SIGN - FINAL JYBARRA Approved
07/14/2009 MECHANICAL - PROGRESS JMILITEL Approved IVRS - Inspection :*
07/14/2009 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
07/14/2009 BUILDING - PROGRESS AQUIROZ Approved IVRS - Inspection :*
07/14/2009 U VALUE FOR WINDOW AQUIROZ Approved IVRS - Inspection :*
07/14/2009 BUILDING ABOVE CEILING AQUIROZ Approved IVRS - Inspection :*
07/14/2009 FRAMING AQUIROZ Approved IVRS - Inspection :*
07/14/2009 ROOF NAILING AQUIROZ Approved IVRS - Inspection :*
07/14/2009 REINFORCED MASONRY PRE-GROUT AQUIROZ Approved IVRS - Inspection :*
07/14/2009 SITE - SEWER RMYERS Approved IVRS - Inspection :*
07/14/2009 PLUMBING - YARD WTR LINE/TEST RMYERS Approved IVRS - Inspection :*
07/14/2009 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :*
07/14/2009 FIRE - ALARM FINAL LTHOMAS Approved
07/14/2009 FIRE SPKLR - FINAL LTHOMAS Approved
07/14/2009 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
07/28/2009 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
07/29/2009 FIRE - FINAL LTHOMAS Approved
07/30/2009 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
PARTIAL
L1-22 OK, L2-03 OK, L2-12 OK, S.L5, CORNER OK, 3RD FLR CHASE OK
08/06/2009 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
1) RECEIVED LETTER FROM KC MECHANICAL FOR 110 DEGREE SET POINT OF TEMPERING FOR HOT WATER SYSTEM FOR PUBLIC USE LAVS
08/07/2009 STUCCO MESH AQUIROZ Approved
08/07/2009 BUILDING - FINAL AQUIROZ Approved IVRS - Inspection :*

Documents

File Name Document Type  
C OF O_08-20-2009.TIF CERT OF OCC VIEW
GEOTECHEVAL.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW