Permit: T05CM01056
Permit Details
Status:
C of o
Type:
COMMERCIAL NEW
Address:
8906 E TANQUE VERDE RD
Address NEW:
8906 E TANQUE VERDE RD
Apply Date:
03/09/2005
Applicant:
PIZZA HUT OF ARIZONA INC ,
Description:
NEW PIZZA HUT
Contractors:
- PIZZA HUT OF ARIZONA INC ,
Permit Reviews
Permit Number - T05CM01056
Permit Status: C of o
Permit Description: NEW PIZZA HUT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/09/2005 | PLANS OK TO SUBMIT - COMM | 03/09/2005 | COMPLETED |
| 03/09/2005 | COMMERCIAL NEW | 04/18/2005 | COMPLETED |
| 05/06/2005 | RESUBMITTAL | 06/06/2005 | COMPLETED |
| 06/15/2005 | RESUBMITTAL | 07/25/2005 | COMPLETED |
| 07/25/2005 | RESUBMITTAL | 07/29/2005 | COMPLETED |
| 07/26/2005 | SITE | 07/29/2005 | COMPLETED |
| 09/09/2005 | REVISION | 09/20/2005 | COMPLETED |
| 12/20/2005 | REVISION | 12/20/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM01056
Permit Status: C of o
Permit Description: NEW PIZZA HUT
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/09/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM01056
Permit Description: NEW PIZZA HUT
Total Completed Inspections - 39
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2005 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection :* 1) SOIL WATER TEST IS OK 2) BLDG DRAIN IS STUBBED OUT 2' OF BLDG ONLY 3) OK TO BACKFILL TRENCH 4) NOTE: SHALL PROVIDE REVISED AND APPROVED PLAN FOR ADDED PEEP SINKS FROM HEALTH DEPT PRIOR TO FINAL INSPECTION |
| 09/26/2005 | ELECTRIC - UFER | RHOLLAND | Approved | IVRS - Inspection :* OK 3/0 BONDED TO REBAR |
| 09/27/2005 | PLUMBING - PROGRESS | TRINIVJR | Approved | IVRS - Inspection :* 1) ALL DWV RISERS HAVE BEEN PROPERLY WRAPPED 2) OK FOR CONCRETE |
| 10/25/2005 | ELECTRIC - TEMPORARY SERVICE | RSUBA | Approved | IVRS - Inspection :* |
| 11/02/2005 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection :*ALL SLAB OK RECAL FOR LIGHT POLE BASE |
| 11/15/2005 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection :*APPROVED |
| 11/15/2005 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | IVRS - Inspection :* |
| 11/22/2005 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :*3" GREASE WASTE INTO INTERCEPTOR WATER TEST OK 4" GREASE WASTE DISCHARGE AND 4" BUILDING SEWER WATER TEST TO POINT OF CONNECTION TO EXISTING 6" SITE SEWER 10' EAST OF MANHOLE ON SOUTH END OF BUILDING OK 2" INTERCEPTOR VENT BACK TO 2' ABOVE FINISH GRADE SOUTH EAST CORNER WATER TEST OK. NEED CITY APPROVED SITE PLAN SHOWING SEWER. COVER AT OWN RISK. |
| 12/07/2005 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* 1) SUPPLY AND EXHAUST IN RESTROOMS OK TO SHEETROCK 2) CODNESATE DRAINS OK 3) TYPE I HOODS MUST EXTEND BEYOND COOKING APPLIANCES MINIMUM 6" ON ALL SIDES |
| 12/07/2005 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | IVRS - Inspection :* DWV WATER TEST IS OK OVERHEAD WATER DISTRIBUTION IS OK GAS PRESSURE TEST IS OK |
| 12/07/2005 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | IVRS - Inspection :* 1. REPLACE BOXES AS DISCUSSED WHERE OVER FILLED. 2. PROVIDE LETTER FROM MCGETRIC ENGINEERING ALLOWING MC USE (APPROX. 20% OF JOB HAS BEEN DONE USING MC CABLE |
| 12/19/2005 | ELECTRIC - CABLE DROP | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/20/2005 | ELECTRIC - UNDERGROUND | RSUBA | Approved | IVRS - Inspection :*OK SECONDARY FROM TRANSFORMER TO SES |
| 12/27/2005 | SHEET ROCK NAILING | JCAGLE | Approved | IVRS - Inspection :* |
| 01/24/2006 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* OK FOR CEILING TILES |
| 01/24/2006 | PLUMBING - ABOVE CEILING | TRINIVJR | Approved | IVRS - Inspection :*ABOVE CEILING IS OK |
| 01/24/2006 | BUILDING ABOVE CEILING | JCAGLE | Approved | IVRS - Inspection :* |
| 01/25/2006 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | IVRS - Inspection :* APPROVED BY TRINI JR 12/7/05 |
| 01/25/2006 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
| 02/03/2006 | TEP CLEARANCE - AM | JKOZUCH | Approved | ECO |
| 02/14/2006 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* |
| 02/14/2006 | MECHANICAL - HOODS | CWILLIAM | Approved | IVRS - Inspection :* |
| 02/15/2006 | FIRE - FINAL | LLAKEY | Approved | |
| 02/15/2006 | FIRE - KITCHEN EXH HOOD FINAL | LLAKEY | Approved | |
| 02/16/2006 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* (7) BACKFLOW CERTIFICATIONS TURNED IN |
| 02/27/2006 | HEALTH DEPT - FINAL 724-7908 | RPEYTON | Approved | |
| 03/09/2006 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 03/13/2006 | FRAMING | JCAGLE | Approved | |
| 03/13/2006 | OUTDOOR LIGHTING FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
| 03/13/2006 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
| 03/13/2006 | ELECTRIC - TEMP POWER FOR TEST | RHOLLAND | Approved | IVRS - Inspection :* |
| 03/13/2006 | ELECTRIC - CONSTRUCTION POWER | RHOLLAND | Approved | IVRS - Inspection :* |
| 03/13/2006 | ELECTRIC - TEMPORARY POLE | RHOLLAND | Approved | IVRS - Inspection :* |
| 03/13/2006 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* |
| 03/13/2006 | BUILDING - FINAL | JCAGLE | Approved | IVRS - Inspection :* |
| 03/13/2006 | STEM WALL/RETAINING WALL | JCAGLE | Approved | IVRS - Inspection :* |
| 03/13/2006 | EXCAVATION/LAYOUT REBAR & ZON | JCAGLE | Approved | IVRS - Inspection :* |
| 03/17/2006 | ENGINEERING - FINAL | JBRUCKME | Approved | |
| 03/20/2006 | SIGN - FINAL | RDEAR | Approved | IVRS - Inspection :* |