Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* (7) BACKFLOW CERTIFICATIONS TURNED IN |
|
| 02/14/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SECURE EXPANSION TANK 2. PROVIDE SEPARATE DRAINAGE PER RPB TO FLOOR SINK 3. PROVIDE DRAIN FOR KEG COOLER 4. RESTROOM FLOOR DRAINS TO BE FLUSH TO FLOOR FOR NO TRIP HAZARD. 5. SECURE BACKFLOW DEVICES 6. INSTALL DRIP DRAIN FOR WATER HEATER CONDENSATE 7. PROVIDE IN HOUSE BACKFLOW CERTIFICATIONS 8. VENT FROM INTERCEPTOR TO BE LAST IRON AND TERMINATE APP 10' FROM FINISH GRADE |
|
| 02/08/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* GAS CARD AT METER |
|
| 02/06/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. HAVE ALL PLUMBING FIXTURES INSTALLED AND ALL EQUIPMENT REQUIRING PLUMBING CONNECTED. 2. VENT FROM WATER HEATER WHEN WITHIN 10' OF INTAKE TO BE 3' ABOVE TOP OF INTAKE WHEN WITHIN 8' OF BUILDING PARAPET TO BE 2' ABOVE |